Attachment 7 - TIQ-Abrasive Clean.pdf
PDF 120 KB Posted
- Attached to
- Abrasive Cleaning and Rivet Removal of Bridge Panels, Centers, and Various Parts for the Anniston Army Depot
- Solicitation number
- W911KF-22-R-0278
About this file
This document is a technical information questionnaire related to a solicitation for abrasive cleaning and rivet removal services of bridge panels, centers, and various parts for the Anniston Army Depot. The contractor shall provide all tools, equipment, labor, supplies, pick-up and delivery to abrasively clean bridge panels ranging from 23 to 33 feet in length, weigh between 4,500 to 7,000 pounds, and require rivet removal from eight bridge sections per bridge. The contractor must have the capability to transport all parts listed from Anniston Army Depot to the cleaning location and back, inspect and clean each part to applicable specifications, and comply with all applicable environmental laws and regulations. The contractor must also have the ability to provide all deliverables and manpower reporting requirements outlined in the statement of work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation W911KF‐22‐R‐0278 Technical Information Questionnaire (TIQ)
May 18th, 2022
FAILURE TO PROVIDE ALL OF THE INFORMATION REQUIRED BELOW MAY RENDER YOUR PROPOSAL
INELIGIBLE FOR AWARD
Abrasive cleaning of bridge panels, ramps, and various parts as well as rivet removal.
The purpose of this questionnaire is to determine the suitability of your equipment to satisfy the requirements. Failure to provide a response may result in the rejection of your proposal.
GENERAL INFORMATION:
Company name and CAGE code:
Company contact information:
Active registration in SAM:
Personnel authorized to sign:
Small business NAICS code of 488490:
STATEMENT OF WORK REQUIRMENTS:
Abrasive Cleaning:
Contractor shall provide all tools, equipment, labor, supplies, pick-up and delivery for the abrasive clean of bridge panels, centers and various government parts. The contractor shall conduct abrasive cleaning by a forceful application of abrasive particular media against the surface of the material to remove paint, corrosion, scale, carbon coating, dry soils, foreign residue, and to condition the surface for subsequent finishing. The bridge panels for the MLC 70 are 33 feet long, 36 inches wide and weigh approximately 7,000 pounds with four (4) bridge panels per bridge. The bridge panels for the MLC 60 are 23 feet long, 36 inches wide and weigh approximately 4,500 pounds with four (4) ramps sections per bridge. The center sections of the MLC 60 are 10 feet long and 36 inches wide and weigh approximately 2,500 pounds with four (4) center sections per bridge. The contractor shall
Rivet Removal:
There will be a total of 8 bridge sections requiring rivet removal per bridge to include: 2 male ramp panels, 2 female ramp panels, 2 male center panels, 2 female center panels. There will be a total of 8 bridge section requiring rivet removal per bridge, to include: 2 male ramp panels, 2 female ramp panels, 2 male center panels, 2 female center panels.
Transportation:
Does your company have the capability to transport all parts listed in the Solicitation from Anniston Army Depot (ANAD) to location of cleaning and return them cleaned as per the SOW to ANAD? Yes or No, if yes please provide a basic description of capability.
May 18th, 2022
Inspection and Cleaning:
Does your company have the capability for inspecting each individual part or component, abrasive clean as required meeting applicable specifications listed in SOW and Appendixes, and return the abrasive cleaned bridges panels and various parts to ANAD within the time frames specified in this contract? Yes or No, if yes please provide a basic description of capability.
Environmental, Safety and Certifications:
Does your company have the capability to comply with all applicable federal, state and local statutes and laws, including but not limited to Clean Air Act (CAA), Clean Water Act (CWA), Emergency, Planning & Community Right to Know Act (EPCRA), Endangered Species Act, Federal Insecticide, Fungicide and Rodenticide Act (FIFRA), Oil Pollution Act of 1990 (OPA), Pollution Prevention Act (PPA), Recourse Conservation and Recovery Act (RCRA), Safe Drinking Water Act (SDWA), Comprehensive Environmental Response, Compensation and Liability Act (CERCLA or Superfund), Superfund Amendments and Reauthorization Act (SARA), and Toxic Substance control Act (TSCA) and while working on ANAD the ANAD RED BOOK (environmental guidance and Emergency Response) and GREEN BOOK (Storm water Best Management Monitoring plan? Yes or No, if yes please provide a basic description of capability.
Does your company have the capability to prepare and submit to the appropriate regulatory agency all required permit applications and obtain all required approvals from the appropriate regulatory agency prior to conducting any work at its location? Yes or No, if yes please provide a basic description of capability.
Does your company have the capability to manage and dispose of hazardous materials, solids, and hazardous wastes in accordance with all applicable federal, state and local laws? Yes or No, if yes please provide a basic description of capability.
Do you have certifications of personnel, equipment, processes, or materials required by the specifications and standards cited herein and in the SOW (evidence of such certifications is subject to inspection prior to award)? Yes or No
Deliverables:
Does your company have the capability of providing all deliverables listed in section 2.6 of the SOW? Yes or No, if yes please provide a basic description of capability.
Contractor Manpower Reporting:
Does your company have the capability of providing Contractor Manpower Reporting requirements listed in section 4 of the SOW? Yes or No, if yes please provide a basic description of capability.
May 18th, 2022
PROPOSAL:
Have you completed all informational fill-ins on the 1449?
Have you completed pricing for all base and Option CLINS?
Have you completed the various parts price list for the base year and all 4 option years?
File details come from the government source that posted it. Updated .