ATTACHMENT 7- SUBFACTOR 2- SCENARIO
U.S. Special Operations Command (USSOCOM), Defense Information Systems Agency (DISA), Air Force Special Operations Command (AFSOC), United States Air Force (USAF), and other mission partners require a lead integrator to manage the various planning, acquisition of ancillary items needed for the integration of different systems, engineering, logistics, and integration functions supporting capability expansion for the Joint Airborne Intelligence, Surveillance, and Reconnaissance (AISR) Sensor Data Transport Infrastructure.
In order to effectively evaluate submitted proposals, the Government is seeking a Scenario-Based Project Plan from each of the Lead Integrator candidates. The Project Plan may include up to twelve (12) pages (no less than 12 pitch font) and must detail your Company’s plan for implementing a fully integrated, “turn-key” regional ground entry point satisfying each of the below listed requirements.
The submitted project plan should include the planned functional/subject matter experts leveraged to support the project, any planned partnerships/teaming, an overarching timeline including site visits, meetings, engagements (e.g., customer, host site, other government agencies, etc.), proposed technical solutions (including rack elevations and overhead view of proposed footprint) satisfying the below requirements, cyber security/configuration management activities, project lead/integration activities, logistics activities, and any other relevant activity demonstrating your Company’s familiarity with the necessary materiel solutions and pre-existing knowledge/skill with a large scale satellite gateway delivery.
Location: 1234th ISR Wing, Somewheristan Air Base (AB), OCONUS
Assumptions: Satellite Airtime already secured; DoDIN Access exists on Somewheristan AB; Current day Aircraft (Manned and Unmanned) Assets; Preexisting Protection Level 2 (PL2) Facility
Timeline: 18 months
Radio Frequency (RF) Terminals: Commercial Ku and WGS Ka; Ability to interconnect between all proposed terminals
Simultaneous Operations (SIMOPS) Supported: 8 each Commercial Ku; 6 each WGS Ka; AFSOC U-28s; Unidirectional Sensor Data; Bi-directional C2 Communications
Threads Supported: 8 each High Definition (HD) Capable MQ-9 Reapers; 6 each HD Capable Gray Eagles; “Passive, Non-Interference” Downlink/Processing Distribution
The Government will afford proposed components as Government Furnished Equipment (GFE) based upon the Lead Integrators Proposal/Plan Subfactor 2 Evaluation Checklist
| Planning/Programming |
| Beddown |
| Design |
· Funding
· POM
· Execution Realignment
· OCO
· CONOPS
· Stakeholder Requirements
· Base Coordination
· Site Survey
· Site Approval
· Look angles/Power
· Frequency Survey
· COM Availability
· Contracts
· MILCON/Base/Other
· Design/Bid/Build
· Design/Build
· Execution Documents
· DD1391
· AF1067
· AF332/Navy TFI
· AF813 Environmental
· SECAF Basing Approval
· Host Nation Approval
· Project Approval
· Frequency Clearance
· Tenant Support Agreement
· COM
· LRS
· CE
· Security Forces
· FSS/Manpower
· Support MOAs
· Base Wing XP Coordination
· Security Coordination
· Physical
· Open Storage
· VGSA
· Frequency Coordination
· Base CE/NAVFAC Coordination
· Design Support
· Construction Support
· Requirements Collection
· Concept Design Creation
· Facility Requirements Documents
· PCM
· FRCB
· Design Support (35, 65, 95%)
· Electrical
· HVAC
· Civil
· Structural
· Fire Detection/Suppression
· Other
· COM
· Inside Plant (ISP)
· Outside Plant (OSP)
· User Control/Status Interfaces
· Command Console
· Gov’t Provided Software
· DISA Connectivity
| Subcontract Management |
| Construction |
· Construction/Renovation
· Uninterruptible Power System (UPS)
· Intrusion Detection System (IDS)
· SATCOM Terminals and Radomes
· COM Inside/Outside Plant
· Furniture
· Provisioning
· AFWAY (NIPR/SIPRNet equipment)
· Oversight or Management
· Requirements Explanation/Definition
· Contract Modifications
· Subcontractor Integration
· Schedule
· Equipment
· Base Entity Coordination
· Test/Acceptance and Training
| Stand-Up |
| Turnover |
· Provisioning
· Mission Support System Installation
· Programs/Logistics Stand-up
· Furniture Installation
· Subcontractor Integration
· System Configuration and Testing
· Network Connectivity and Testing
· Mission Transition
· Acceptance Witnessing
· Documentation and Diagrams
· Training
· Classroom/Hands-On
· Material
· Operations and Management
Sustainment
· Enduring Support Agreement or MOAs
· Uninterruptible Power System (UPS) Maintenance Support
· Intrusion Detection System (IDS) Maintenance Support
· Vehicle Maintenance Support
· HVAC/Generator Maintenance Support
· Software/Hardware Licensing Support
· Tech Refresh Funding POM
· Real Property Acceptance