Attachment 7- Subfactor 2- Scenario.docx

DOCX document 20 KB Posted

Attached to
AISR Sensor Data Transport Infrastructure Enterprise Integration
Solicitation number
ID05180020
Issued by

View the file

Other files

File Type Posted
ID05180020_ RFP_ AMD 004.pdf PDF
ID05180020_ AMD 004- SF30.pdf PDF
Attachment 1_ SOW_ ID05180020-AMDT0003.docx DOCX document
ID05180020_ AMD 003.pdf PDF
ID05180020_ RFP_ AMD 003.docx DOCX document
ID05180020 QA_ Final .pdf PDF
PWS Attachment F-QASP.docx DOCX document
ID05180020 AMDT 0002.pdf PDF
PWS Attachment H-QASP Attachment 2.xlsx XLSX spreadsheet
Attachment 9_ Task Order 01 PWS-AMDT0002.docx DOCX document
PWS Attachment G-QASP attachment 1.docx DOCX document
Attachment 1_ SOW_ ID05180020-AMDT0001.docx DOCX document
ID05180020 AMDT 0001.pdf PDF
ID05180020_ RFP.docx DOCX document
Attachment 2- Question Template.xlsx XLSX spreadsheet
Attachment 1_ SOW_ ID05180020.docx DOCX document
Attachment 4_ Past Performance Worksheet.docx DOCX document
Attachment 9_ Task Order 01 PWS.docx DOCX document
Attachment 10_ Technical Capability Evaluation Matrix.xlsx XLSX spreadsheet
Attachment 8_ Solicitation DD254.pdf PDF
Attachment 6_ Pricing Schedule.xlsx XLSX spreadsheet
Attachment 3_ Staffing Qualifications Matrix.xlsx XLSX spreadsheet
Attachment 5_ Past Performance Questionnaire.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 7- SUBFACTOR 2- SCENARIO

U.S. Special Operations Command (USSOCOM), Defense Information Systems Agency (DISA), Air Force Special Operations Command (AFSOC), United States Air Force (USAF), and other mission partners require a lead integrator to manage the various planning, acquisition of ancillary items needed for the integration of different systems, engineering, logistics, and integration functions supporting capability expansion for the Joint Airborne Intelligence, Surveillance, and Reconnaissance (AISR) Sensor Data Transport Infrastructure.

In order to effectively evaluate submitted proposals, the Government is seeking a Scenario-Based Project Plan from each of the Lead Integrator candidates. The Project Plan may include up to twelve (12) pages (no less than 12 pitch font) and must detail your Company’s plan for implementing a fully integrated, “turn-key” regional ground entry point satisfying each of the below listed requirements.

The submitted project plan should include the planned functional/subject matter experts leveraged to support the project, any planned partnerships/teaming, an overarching timeline including site visits, meetings, engagements (e.g., customer, host site, other government agencies, etc.), proposed technical solutions (including rack elevations and overhead view of proposed footprint) satisfying the below requirements, cyber security/configuration management activities, project lead/integration activities, logistics activities, and any other relevant activity demonstrating your Company’s familiarity with the necessary materiel solutions and pre-existing knowledge/skill with a large scale satellite gateway delivery.

Location: 1234th ISR Wing, Somewheristan Air Base (AB), OCONUS

Assumptions: Satellite Airtime already secured; DoDIN Access exists on Somewheristan AB; Current day Aircraft (Manned and Unmanned) Assets; Preexisting Protection Level 2 (PL2) Facility

Timeline: 18 months

Radio Frequency (RF) Terminals: Commercial Ku and WGS Ka; Ability to interconnect between all proposed terminals

Simultaneous Operations (SIMOPS) Supported: 8 each Commercial Ku; 6 each WGS Ka; AFSOC U-28s; Unidirectional Sensor Data; Bi-directional C2 Communications

Threads Supported: 8 each High Definition (HD) Capable MQ-9 Reapers; 6 each HD Capable Gray Eagles; “Passive, Non-Interference” Downlink/Processing Distribution

The Government will afford proposed components as Government Furnished Equipment (GFE) based upon the Lead Integrators Proposal/Plan Subfactor 2 Evaluation Checklist

Planning/Programming
Beddown
Design

· Funding

· POM

· Execution Realignment

· OCO

· CONOPS

· Stakeholder Requirements

· Base Coordination

· Site Survey

· Site Approval

· Look angles/Power

· Frequency Survey

· COM Availability

· Contracts

· MILCON/Base/Other

· Design/Bid/Build

· Design/Build

· Execution Documents

· DD1391

· AF1067

· AF332/Navy TFI

· AF813 Environmental

· SECAF Basing Approval

· Host Nation Approval

· Project Approval

· Frequency Clearance

· Tenant Support Agreement

· COM

· LRS

· CE

· Security Forces

· FSS/Manpower

· Support MOAs

· Base Wing XP Coordination

· Security Coordination

· Physical

· Open Storage

· VGSA

· Frequency Coordination

· Base CE/NAVFAC Coordination

· Design Support

· Construction Support

· Requirements Collection

· Concept Design Creation

· Facility Requirements Documents

· PCM

· FRCB

· Design Support (35, 65, 95%)

· Electrical

· HVAC

· Civil

· Structural

· Fire Detection/Suppression

· Other

· COM

· Inside Plant (ISP)

· Outside Plant (OSP)

· User Control/Status Interfaces

· Command Console

· Gov’t Provided Software

· DISA Connectivity

Subcontract Management
Construction

· Construction/Renovation

· Uninterruptible Power System (UPS)

· Intrusion Detection System (IDS)

· SATCOM Terminals and Radomes

· COM Inside/Outside Plant

· Furniture

· Provisioning

· AFWAY (NIPR/SIPRNet equipment)

· Oversight or Management

· Requirements Explanation/Definition

· Contract Modifications

· Subcontractor Integration

· Schedule

· Equipment

· Base Entity Coordination

· Test/Acceptance and Training

Stand-Up
Turnover

· Provisioning

· Mission Support System Installation

· Programs/Logistics Stand-up

· Furniture Installation

· Subcontractor Integration

· System Configuration and Testing

· Network Connectivity and Testing

· Mission Transition

· Acceptance Witnessing

· Documentation and Diagrams

· Training

· Classroom/Hands-On

· Material

· Operations and Management

Sustainment

· Enduring Support Agreement or MOAs

· Uninterruptible Power System (UPS) Maintenance Support

· Intrusion Detection System (IDS) Maintenance Support

· Vehicle Maintenance Support

· HVAC/Generator Maintenance Support

· Software/Hardware Licensing Support

· Tech Refresh Funding POM

· Real Property Acceptance