Attachment 7 Statement of Work.pdf

PDF 351 KB Posted

Attached to
Cantonment Fence Repair at Joint Base Lewis McChord (JBLM)
Solicitation number
W911S8-21-B-0006
Issued by

About this file

This is a solicitation for a firm-fixed-price contract to repair fencing at Joint Base Lewis-McChord in Washington. The work includes replacing and repairing sections of chain link security fencing around McChord Field as well as removing brush, trimming and removing trees near the fence. The contract duration is 300 days from notice to proceed. The North American Industry Classification System code is 238990 for specialty trade contractors with a size standard of $16.5 million. The magnitude of construction is estimated between $500,000 to $1 million. This is a 100% small business set-aside issued by the Department of the Army Mission and Installation Contracting Command at Joint Base Lewis-McChord. Responses are due by the date specified in the solicitation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

March 11, 2021

CONSTRUCTION

Pre-RFP Draft Date: March 11, 2021

1. GENERAL DISCUSSION:

1.1. Project Identification

1.1.1. Project Title: Repair Cantonment Fence Line Phase 4

1.1.2. IJO Numbers: DQA000283J, MBB001393J

1.1.3. Project Package Number: PS2119

1.2. Description of Work

1.2.1. The Contractor shall supply all supervision, labor, equipment, and materials to perform all work in strict accordance with the contract, this Statement of Work (SOW), and identified drawings to make repairs to the Joint Base Lewis-McChord (JBLM) McChord Field cantonment fence, and other work pertaining to the fence line.

1.3. Area Description

1.3.1. Location

1.3.1.1. The JBLM - McChord Field cantonment fence spans the entire perimeter of McChord Field, as shown in Attachment 1.

1.3.2. Known Existing Site Condition

1.3.2.1. The JBLM - McChord Field cantonment fence is located on improved and unimproved grounds. The terrain varies from flat and smooth to hilly and rutted. There are obstacles such as fallen trees, ditches and discarded concrete which may pose tripping or falling hazards. Vegetation varies from maintained grass to thick heavy vegetation. Additionally, there are water bodies such as creeks and wetlands within close proximity to the fence line.

1.4. Principal Items To Be Accomplished

1.4.1. Base Item CLIN 0001: Repair JBLM - McChord Field cantonment fence line.

a. Shown on Attachment 1 are all areas of construction and repair the Contractor is to accomplish directly to the fence, and the surrounding area incidental to the longevity of the fence. Each sub-attachment (1.1 – 1.10) describes in detail where fence repair and replacement is to take place, including brush removal, tree removal and trimming, as well as spot repairs for the fence. The parameters for each action are described below:

Branch Trimming: Along the dotted red lines, Contractor is to remove all overhanging branches on the fence in accordance with Attachment 4 of this contract. Non-evergreen trees located on private property (shown in yellow lines on Attachment 1) are not to be trimmed for any reason.

Tree Removal: Along the solid red lines, Contractor is to remove all trees shown on Attachment 1.10 in accordance with Para 1.4.3 of this contract.

Only Attachment 1.10 is a part of Base Item CLIN 0001 as it pertains to tree removal.

Light Brush Removal: Along the dotted green lines, Contractor is to remove all light vegetation along the depicted side of the fence (line will be on either side of the fence on Attachment 1). Light brush is defined as anything that can be removed by a brush hog, riding lawn mower, or similar equipment.

See Para 1.4.1.d for specific details.

Heavy Brush Removal: Along the solid green lines, Contractor is to remove all heavy vegetation along the depicted side of the fence (line will be on either side of the fence on Attachment 1). Heavy brush is defined as vegetation that is over four feet in height, intertwining with the fence requiring hand removal, or not allowing visibility through at eye level. See Para 1.4.1.d for specific details.

Minor Fence Repair: Along the dotted blue lines, Contractor is to conduct repairs to the fence. Minor fence repair includes work such as brace rails, top rails, truss rods, chain-link fabric, outriggers, barbed wire, tension wire, hog rings, and tie wires or clips. Portions of the fence that are to be repaired along the dotted blue lines include areas of bent mesh, excessive rust, bent cross bracing, bent or broken outrigger arms, or loose barbed wire. When the Contractor encounters gaps under fence where the fencing fabric does not contact the existing grade to within three inches, fill the gap with base coarse material, which is to be tamped and spread until the material is uniform. All materials used on the fence shall comply with FE-7 spec fences shown in Attachments 2 and 3. Locations where minor fence repair are to take place shall be brought to a condition in which none of the aforementioned components of the fence are bent, broken, deformed, or in any other way not in like-new condition. All barbed wire along a line denoting minor fence repair shall be removed and replaced.

Fence Replacement: Along the solid blue lines, Contractor is to remove and replace entire fence, to include the posts and concrete footings. Regardless of existing fence, all fence and gates removed shall be replaced with the FE-7 spec fence shown in Attachments 2 and 3. Replacement fence shall mesh with adjacent fence seamlessly, and match what is existing to the greatest extend possible.

Spot Repairs: Shown in blue dots, Contractor is to conduct minor repairs to the fence in that specific area. Areas shown are reflected in the pictures attached to this Statement of Work (SOW), and are labeled numerically to match the number in the blue boxes throughout Attachment 1. Attachment 5 depicts an image of each spot repair area, each picture containing a number that correlates to the numeric value of each spot repair area on Attachment 1.

Minor repair is defined in the same manner as it is described for dashed blue lines, but it may also include post replacement if the particular areas post(s) are damaged in any way.

Note: All gates along the lines shown in Attachment 1 in need of repair or replacement as denoted by the lines are a part of this contract.

b. Shown on Attachment 1.10, Contractor is to remove all trees listed for removal per the solid red lines (approximately 55 trees in total, Contractor shall field verify). Para 1.4.3. of this SOW shall be adhered to for tree removal guidelines.

c. Contractor must coordinate with the Government Project Manager (PM) three business days before working on areas where the cantonment fence is shared by private properties. See Attachment 1 for the delineation of cantonment fence areas where the cantonment fence area interacts with the private properties to the East, shown in solid yellow lines.

d. Contractor shall clear/cut vegetation that falls within 10 feet of either side of the Cantonment Fence as shown in Attachment 1, and will abide by the following requirements.

i. All vegetation shall be cleared/cut to a height no higher than three inches (3”) on the smooth improved grounds and six inches (6”) on rough unimproved ground. All vegetation that penetrates the chain-link fabric shall be removed from the chain-link fence manually if necessary, so that there is an unobstructed view through the Cantonment Fence line.

ii. Contractors shall not permit wheeled/motorized equipment within 50’ buffer of wetlands, so hand work must be performed in these areas. Contractor will coordinate working methods and restrictions with Government Project Manager (PM) and Government Quality Assurance Representative before actual work begins in these areas. Contractor shall describe these areas in the Environmental Protection Plan submittal. See Attachment 1 for specific wetland locations.

iii. Contractors shall ensure that all excessive debris from cutting grass, Scotch broom, briar & berry bushes, etc. is picked up and removed according to the following specifications.

iv. All rocks left by upheaval of vegetation shall be no larger than two inches (2”) in diameter.

Un-improved grounds: Organic debris can be left on the ground if no piles are evident and the grinded debris is evenly spread out.

Improved Grounds: All excess debris shall be removed, no pile or spreading of debris is allowed. For example, mowed grass does not have to be removed, but briars, tree branches, Scotch broom, etc.

shall be removed. Excess debris shall be hauled off-base and recycled/disposed at a State Approved Facility. Earthworks is not currently accepting any organic debris or concrete/ asphalt waste.

e. If the cantonment fence has been disassembled so Contractor personnel can move in and out of the opening in the cantonment fence, the Contractor shall ensure the following requirements are met:

i. If the opening will be utilized the following morning, the Contractor shall ensure the chain-link fabric is reattached to the appropriate dimension line posts so the fencing is secure and will not blow over during inclement weather or high winds. For example, if any line posts have to be removed in order to make the opening a specific width, temporary line posts shall be reinserted into the ground overnight to secure the opening. The line posts do not have to be secured in ground with concrete if the opening will be accessed the next day. Chain-link fabric shall be same dimension as adjacent. Only enough additional parts such as tension wire, etc. shall be reinstalled to make the cantonment fence stable.

ii. If the opening will not be accessed for more than one day, Contractor shall repair the opening to the applicable specification as noted in Attachments 2 and 3, provide security until the opening is secured, or obtain written permission from Security Forces allowing the opening to remain open for a longer period of time.

iii. If the fence is breached because the Contractor is inside working, a Contractor employee must keep watch and report to law enforcement any entrance by personnel through the area that is open.

f. Contractor shall ensure that all work necessary to complete the requirements in this SOW which impede vehicle or pedestrian traffic be mitigated.

1.4.2. Base Item CLIN 0002: Vertical extension of existing Eastern fence line.

On the areas highlighted in dotted purple lines on Attachments 1.8 and 1.9, Contractor shall extend the vertical height of the existing fence. “Fence Extension” is defined as removal of the outrigger arms and barbed wire from the fence posts, and the extension of the height of the fence by two feet along the entire length specified. Outrigger arms may be reused, however barbed wire shall not be reused. All modifications done shall comply with FE-7 specs as described in Attachments 2 and 3.

a. The extensions will have the following characteristics:

i. All extensions made will use materials and specifications so as to match what is existing.

ii. Wire fabric spanning the length of the extension area shall be completely removed, and replaced to cover the new total height of the extended fence.

iii. Outriggers replaced shall be retied and re-tensioned at the posts where the extended fence begins and ends.

iv. Brush on the non- JBLM - McChord Field side of the fence may be cleared only to the extent in which it is required to complete the work to extend the fence safely and efficiently.

v. Contractor shall not conduct work on the non- JBLM -

McChord Field side of the fence.

vi. Contractor shall make repairs as needed to the existing fence, to include but not limited to complete post removal and replacement, in order to ensure the integrity of the newly heightened fence.

1.4.3. Base Item CLIN 0003: Tree removal along JBLM - McChord Field fence line.

b. Shown on Attachment 1.1 through 1.9, Contractor is to remove all trees located within 10 feet of the fence line. Tree groups are shown in the solid red lines on Attachment 1. Contractor shall adhere to the following requirements when removing trees:

i. Tree stumps shall be grinded flush with the natural contour of the surrounding grounds. The surrounding grounds are not the bulging grounds around the tree caused by the growth of the tree.

ii. All trees within 10 feet on either side of the fence denoted by the solid red lines on Attachment 1 shall be removed. 10 feet is measured from the trunks nearest point to the fence, to the fence line.

iii. Log decks shall be located as directed by the DPW Project

Manager (PM). Decking will require log transport off-site to an appropriate location on the installation. Contractor shall coordinate with the DPW PM before cutting trees to verify this site for use, and discuss materials and equipment staging. Contractor shall give the Government three days’ notice prior to the day they want to cut. See Attachment 6 for this location.

iv. Contractor shall repair ANY damage caused during repairs to the cantonment fence line (i.e. rutted grounds).

v. See Paragraph 15.6 for additional salable timber requirements.

vi. Non-evergreen trees shall not be removed without the coordination and approval of the Government PM.

2. PERFORMANCE AND SCHEDULING:

2.1. Performance Period Requirements

2.1.1. The Contractor is required to commence work under this Contract within ten

(10) calendar days after the date of issuance of the Notice to Proceed (NTP) for the Base Item(s), prosecute the work diligently, and complete all work on all Base Item(s) no later than 300 calendar days after the date of issuance of the Notice to Proceed for the Base Item(s). The time stated for completion includes final cleanup of the premises and submission of all required close-out documentation.

2.1.2. Blank copies of Government forms required by this SOW will be provided to the Contractor within 14 calendar days of award issuance. Examples of these forms include: daily reports, ENG Form 4025-R, HJB 229, etc.

2.2. Construction Phasing Requirements

2.2.1. Contractor shall coordinate all shut downs/outages with the DPW.

Contractor shall coordinate with the Government PM no later than three days prior to conducting work nearby a JBLM – McChord Field access gate to give necessary time to coordinate with Security Forces.

2.3. Perform other work necessary

2.3.1. The Contractor shall be responsible for providing a complete and useable product/system and shall be responsible for accomplishing all tasks incidental to the completion of the project requirements. Requirements for a complete and useable product which are not explicitly called out in the SOW but are reasonably discernable via any other method than destructive testing shall be considered a requirement of the project/contract.

3. SUBMITTAL PROCEDURES:

3.1. Project Submittal Requirements: All submittals shall be submitted electronically (emailed) to the Government PM in Adobe Acrobat .pdf format.

An ENG Form 4025 shall accompany each submittal. These forms shall be furnished to the Contractor by the PM. The submittal file name shall be in the format “Contract # – submittal #, submittal name” for example; “0020-001 RTU”. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Drawings if required by the SOW shall be in ACAD format and a second electronic copy in PDF format. The Government reserves the right to request submittals not listed in this SOW;

any submittals not listed in this SOW but requested by the Government shall become a requirement of the project. Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Contractor shall check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified.

3.1.1. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the KO from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirements to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

3.1.2. Government Approval. Government approval is required for critical materials, deviations, equipment whose compatibility with the entire system must be checked, safety requirements, and other items as designated by the KO. Government approval is required for any deviations from the solicitation or accepted proposal and other items as designated by the KO. These deviations must contain proper documentation stating why this deviation is necessary and why it is beneficial to the Government.

3.1.3. Information Only. Submittals not requiring Government approval will be for information only. The approving authority will not provide approval of information only submittals, but shall provide acknowledgement of receipt.

3.1.4. Variations. Variations from contract requirements require Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government and/or overall project. Discussion with KO or the COR (DPW PM, MICC CS, etc.) prior to submission will help ensure functional and quality requirements are met and minimize rejections and resubmittals. Specifically point out variations from contract requirements in transmittal letters. Failure to point out variations may result in the Government requiring rejection and removal of such work at no additional cost to the Government. When proposing a variation, deliver written request to the KO, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation. Check the column "variation" of ENG Form 4025 for submittals that include proposed variations requested by the Contractor. Set forth in writing the reason for any variations and annotate such variations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted variations.

3.1.5. Approval. When approving authority is KO or the COR, the Government will: Note date on which submittal was received. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents. Identify returned submittals with one of the actions defined in paragraph entitled "Review Notations" and with markings appropriate for action indicated. Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. The transmittal form (4025-R) showing approval of the submittal will be retained by the KO and one copy of the transmittal form will be returned to the Contractor electronically. The KO's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory. Approval or acceptance will not relieve the Contractor of the responsibility for any error that may exist, as the Contractor is responsible for the satisfactory construction of all work.

After submittals have been approved or accepted by the KO, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

3.1.6. Disapproval. Contractor shall make corrections required by the KO. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications, notice as required under the clause entitled, "Changes" is to be given to the KO. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense. If changes to submittals are necessary, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above within 7 calendar days.

No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

3.1.7. Duration for submittal review: The Government shall have up to 14 calendar days to review each submittal starting when the Government receives the electronic submission. Longer review times may be required on a case-by-case basis.

3.2. Project Schedule:

3.2.1. Prepare for approval a Project Schedule, as specified herein, pursuant to the contract clause, SCHEDULE FOR CONSTRUCTION CONTRACTS. Show in the schedule the sequence in which the Contractor proposes to perform the work and dates on which the Contractor contemplates starting and completing all schedule activities. The scheduling of the entire project, including construction sequences, is required. The scheduling of construction is the responsibility of the Contractor. Contractor management personnel shall actively participate in its development. Subcontractors and suppliers working on the project shall also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool.

3.2.1.1. Approved Project Schedule. Use the approved Project Schedule to measure the progress of the work and to aid in evaluating time extensions. Make the schedule cost loaded and activity coded. The schedule will provide the basis for all progress payments. If the Contractor fails to submit any schedule within the time prescribed, the Contracting Officer (KO) may withhold approval of progress payments until the Contractor submits the required schedule.

3.2.1.2. Default Terms. Failure of the Contractor to comply with the requirements of the contract shall be grounds for a determination, by the KO, that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the KO may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of the contract.

3.2.2. BASIS FOR PAYMENT AND COST LOADING: Use the schedule as the basis for determining contract earnings during each update period and therefore the amount of each invoice payment. Lack of an approved schedule update, or qualified scheduling personnel, will result in the inability of the KO to evaluate Contractor percentage complete for the purposes of payment.

Failure of the Contractor to provide all required information will result in the disapproval of the preliminary, initial, and subsequent schedule updates. In the event schedule revisions are directed by the KO and those revisions have not been included in subsequent revisions or updates, the KO may hold retainage up to the maximum allowed by contract, each payment period, until such revisions to the Project Schedule have been made. Activity cost loading shall be reasonable, as determined by the KO. The aggregate value of all activities coded to a Contract Line Item Number (CLIN) shall equal the value of the CLIN on the Project Schedule. The Government will withhold 5%of the project amount for submission and acceptance of any and all closeout documents as specified in each project and this shall be shown on the Project Schedule.

3.2.3. PROJECT SCHEDULE DETAILED REQUIREMENTS: The computer

software system utilized to produce and update the Project Schedule shall be capable of meeting all requirements of this specification. Failure of the Contractor to meet the requirements of this specification will result in the disapproval of the schedule.

3.2.3.1. Critical Path Method. Use the Critical Path Method (CPM) of network calculation to generate the Project Schedule. Prepare the Project Schedule using the Precedence Diagram Method (PDM).

3.2.3.2. Level of Detail Required. Develop the Project Schedule to an appropriate level of detail. Failure to develop the Project Schedule to an appropriate level of detail, as determined by the KO, will result in its disapproval. The KO will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:

a. Activity Durations. Reasonable activity durations are those that allow the progress of ongoing activities to be accurately determined between update periods. Procurement activities are defined herein.

b. Permit Activities. Include permit activities, when required, with the necessary conferences and follow-up actions and dates. Include the permitting schedule in the Project Schedule, showing the sequence of events involved in carrying out the project permit tasks within the specific contract period. This shall be at a detailed level of scheduling sufficient to identify all major permitting tasks, including those that control the flow of work.

c. Procurement Activities. Tasks related to the procurement of long lead materials or equipment shall be included as separate activities in the Project Schedule. Long lead materials and equipment are those materials that have a procurement cycle of over 30 days. Examples of procurement process activities include, but are not limited to: submittals, approvals, procurement, delivery, start-up, and testing.

d. Mandatory Tasks. The following tasks (as required) must be included and properly scheduled:

1. Submission of closeout submittals, equipment commissioning, controls testing plan submission, controls testing, performance verification testing, other systems testing, Contractor’s internal project inspection, correction of punchlist from the Contractor’s pre-final inspection, final inspection.

2. Government Activities. Show Government and other agency activities that could impact progress. These activities include, but are not limited to: approvals, environmental permit approvals by State regulators, inspections, utility tie-in, Government-Furnished Equipment (GFE) and Notice to Proceed (NTP) for phasing requirements.

3. CLIN Coding. Code all activities to the CLIN on the CLIN Schedule to which the activity belongs. An activity shall not contain more than one CLIN code. CLIN code all activities, even when an activity is not cost loaded (to include preconstruction and post construction activities).

3.2.4. Scheduled Project Completion and Activity Calendars. The schedule interval shall extend from NTP date to the required contract completion date. The contract completion activity (End Project) shall finish based on the required contract duration in the accepted contract proposal, as adjusted for any approved contract time extensions. The first scheduled work period shall be the day after NTP is received by the Contractor. Schedule activities on a calendar to which the activity logically belongs. Activities may be assigned to a 7-day calendar when the contract assigns calendar day durations for the activity such as a Government Acceptance activity. Assign the Category of Work Code - Weather Sensitive Installation to those activities that are weather sensitive. Original durations must account for anticipated normal adverse weather. The Government will interpret all work periods not identified as non-work periods on each calendar as meaning the Contractor intends to perform work during those periods.

3.2.4.1. Project Start Date. The schedule shall start no earlier than the date on which the NTP was acknowledged. Include as the first activity in the Project Schedule an activity called “NTP”.

3.2.4.2. Project Completion Date. Constrain completion of the last activity in the schedule by the contract completion date. Schedule calculations shall result in a negative float when the calculated early finish date of the last activity is later than the contract completion date. Include as the last activity in the Project Schedule an activity called "Project Completion”.

3.2.5. PROJECT SCHEDULE SUBMISSIONS: The Contractor shall provide the submissions as described below:

3.2.5.1. Project Schedule Submission. Submit the Project Schedule for approval within 7 calendar days after NTP. The schedule shall demonstrate a reasonable and realistic sequence of activities which represent all work through the entire contract performance period. The Project Schedule shall be at a reasonable level of detail as determined by the KO. This requirement is in addition to any required schedules or submittals submitted in response to a Request for Proposal (RFP).

3.2.5.2. Project Schedule Updates. At the request of the KO, the Contractor shall provide and submit an updated Project Schedule. These submissions will enable the KO to assess the Contractor's progress. If the Contractor fails or refuses to furnish the information and Project Schedule data, which, in the judgment of the KO or COR is necessary for verifying the Contractor's progress, the Contractor shall be deemed not to have provided an estimate upon which progress payment may be made.

3.2.6. REQUESTS FOR TIME EXTENSIONS: In the event the Contractor believes the Contractor is entitled to an extension of the contract performance period, completion date, or any interim milestone date, furnish the following for a determination by the KO: justification, Project Schedule data, and supporting evidence (Ex: daily reports showing delays) as the KO may deem necessary. Submission of proof of excusable delay, based on revised activity logic, duration, and costs (updated to the specific date that the delay occurred) is a condition precedent to any approvals by the Government. In response to each RFP issued by the Government, the Contractor shall submit a schedule impact analysis demonstrating whether or not the change contemplated by the Government impacts the critical path.

3.2.6.1. Justification of Delay. The Project Schedule shall clearly display that the Contractor has used, in full, all the float time available for the work involved with this request. The KO's determination as to the number of allowable days of contract extension shall be based upon the Project Schedule updates in effect for the time period in question, and other factual information.

Actual delays that are found to be caused by the Contractor's own actions, which result in a calculated schedule delay, will not be a cause for an extension to the performance period, completion date, or any interim milestone date.

3.2.6.2. Unexcused Delays. Unexcused delays will result in a disapproval of any time extension request and the Contractor will be required to complete the work within the original period of performance. If the Contractor cannot complete the work within the original period of performance, the Contractor will be required to provide consideration to the Government in order to receive a time extension. Consideration will be established on a case by case basis but examples include but are not limited to extended warranty period, upgraded materials, etc.

3.3. Accident Prevention Plan:

3.3.1. Use a qualified person to prepare the written site-specific Accident Prevention Plan (APP). Prepare the APP in accordance with the format and requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1, Appendix A, "Minimum Basic Outline for Accident Prevention Plan". Specific requirements for some of the APP elements are described below. The APP shall be job-specific and address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the

Contractor's overall safety and health program. Include any portions of the Contractor's overall safety and health program referenced in the APP in the applicable APP element and made site specific. The Government considers the prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Contractors are responsible for informing its subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed by the person and firm (senior person) preparing the APP, the Contractor, the on-site Superintendent, the designated site safety and health officer and any designated CSP and/or CIH.

3.3.2. Submit the APP to the Government personnel within 14 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted APP.

3.3.3. Once accepted by the KO or the COR, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the KO, until the matter has been rectified.

3.3.4. Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the KO, or the COR, Project Superintendent, SSHO, and Quality Control Manager. Should any hazard become evident, stop work in the area, secure the area, and develop a plan to remove the hazard. Notify the KO within 24 hours of discovery. Eliminate/remove the hazard. In the interim, take all necessary action to restore and maintain safe working conditions in order to safeguard on-site personnel, visitors, the public (as defined by ASSE/SAFE A10.34,) and the environment.

3.3.5. Copies of the accepted plan will be maintained at the KO's office and at the job site. Continuously review and amend the APP, as necessary, throughout the life of the contract. Incorporate unusual or high-hazard activities not identified in the original APP as they are discovered.

4. PROJECT REQUIRED SUBMITTALS:

4.1.1. Pre-Construction Submittals:

4.1.1.1. Quality Control Plan – Plan shall list Contractor POC’s with phone numbers and list any subcontractor’s used with POC’s and phone numbers.

4.1.1.2. Accident Prevention Plan with AHA’s

4.1.1.3. Environmental Protection Plan

4.1.1.4. Hazardous materials list with safety data sheet for each material (see section 16.6). HJB Form 225 may be required.

4.1.1.5. Construction/Project Schedule

4.1.1.6. Training and Completion Letters (AT/FP, OPSEC, iWATCH, E-Verify)

4.1.1.7. Submittal Register (ENG Form 4288-R)

4.1.1.8. Tree Felling and Removal Plan

4.1.1.9. Traffic Control Plan (if necessary)

4.1.2. Construction Submittals:

4.1.2.1. Manufacturer’s equipment specification sheets. All applicable items such as model numbers, sizes, and accessories shall be indicated using arrows or highlight.

4.1.2.2. Applicable materials meeting specifications of SOW.

4.1.2.3. Closeout Submittals:

4.1.2.4. The Contractor shall provide a letter of non-retention for all contract documents, plans, drawings, and specifications after the destruction of all copies that are not required by the Contractor to meet legal requirements.

5. DRAWINGS , SPECIFICATIONS & CODES:

5.1. Drawings

5.1.1. The drawings outlined below are attached:

Attachme nt Number

Title Date

1 Fence Repair Map 01 Dec 20

1.1 Quadrant 1 (Fence Repair Map) 01 Dec 20

1.2 Quadrant 2 (Fence Repair Map) 01 Dec 20

1.3 Quadrant 3 (Fence Repair Map) 01 Dec 20

1.4 Quadrant 4 (Fence Repair Map) 01 Dec 20

1.5 Quadrant 5 (Fence Repair Map) 01 Dec 20

1.6 Quadrant 6 (Fence Repair Map) 01 Dec 20

1.7 Quadrant 7 (Fence Repair Map) 01 Dec 20

1.8 Quadrant 8 (Fence Repair Map) 01 Dec 20

1.9 Quadrant 9 (Fence Repair Map) 01 Dec 20

1.10 Quadrant 10 (Fence Repair Map) 01 Dec 20

2 FE-7 Security Fence Detail 11 Mar 20 3 FE-7 Security Gate Detail 11 Mar 20 4 Tree Trimming Diagram 11 Mar 20 5 Spot Repair Location Pictures 13 Nov 20 6 Holiday Park Firewood Decking

Area 11 Mar 20

5.1.2. Dimensions and utility locations are approximate and must be verified in the field.

5.2. Specifications

5.2.1. UFC 3-260-01 (Security Fences)

5.3. Codes

5.3.1. The Contractor shall comply with all pertinent lLocal, State, and Federal building life/health/safety codes as listed.

5.3.1.1. Applicable Unified Facilities Criteria (UFC)

5.3.1.2. UFC 1-200-01: General Building Requirements

http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-01

5.3.1.3. UFC 1-200-02: High Performance and Sustainable Building Requirements https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02

5.3.1.4. ASA IE&E SDD policy

www.asaie.army.mil/Public/ES/doc/SDD%20Policy.pdf

5.3.1.5. UFC 1-201-01 Non-Permanent DoD Facilities in Support of Military

Operations

5.3.1.6. EM 385-1-1

(http://www.publications.usace.army.mil/USACEPublications/EngineerMan uals.aspx)

5.3.1.7. National Electrical Code, NFPA 70

5.3.1.8. National Plumbing Code

5.3.1.9. National Fire Protection Association (NFPA) Codes

5.3.1.10. Telecommunication Industry Association/Electrical Industry Association

Wiring Standards (Building Telecommunication Wiring Standards)

5.3.1.11. Army Installation Information Infrastructure Architecture Policy (I3A) http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02 http://www.asaie.army.mil/Public/ES/doc/SDD%20Policy.pdf http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx

5.3.1.12. JBLM Design Standard specifications (http://www.lewis-mcchord.army.mil/designstandards/)

5.3.1.13. JBLM 420-1 (2020)

5.3.1.14. JBLM Master Plan, which includes Architectural Appearance Standards

5.3.1.15. PWE-707, Standard Operating Procedure for Construction and

Demolition (C&D) Waste Planning and Reporting (Available through Government PM)

5.3.1.16. National Pollutant Discharge Elimination System (NPDES) small Municipal Separate Storm Sewer Systems (MS4) Permit No. WAS- 026638. Use guidance documents found at https://home.army.mil/lewis-mcchord/index.php/my-Joint-Base-Lewis-Mcchord/all-services/public_works-environmental_division/stormwater

6. SAFETY:

6.1 In addition to the detailed requirements included in the provisions of this contract, comply with USACE EM 385-1-1, and all Federal, state, and local, laws, ordinances, criteria, rules, and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.

6.2 Activity Hazard Analysis (AHA):

6.2.1 The AHA format shall be in accordance with USACE EM 385-1-1. Submit the AHA for review at least 14 calendar days prior to the start of a project;

an accepted AHA is required to start onsite work. Format subsequent AHA’s as amendments to the APP. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls.

6.2.2 The AHA list will be reviewed periodically (at least monthly) and updated as necessary when procedures, scheduling, or hazards change.

6.2.3 Develop the activity hazard analyses using the Project Schedule as the basis for the activities performed. Any activities listed on the Project Schedule will require an AHA. The AHA will be developed by the Contractor, supplier, or subcontractor and provided to the prime Contractor for submittal to the KO or their representative.

http://www.lewis-mcchord.army.mil/designstandards/ http://www.lewis-mcchord.army.mil/designstandards/ https://home.army.mil/lewis-mcchord/index.php/my-Joint-Base-Lewis-Mcchord/all-services/public_works-environmental_division/stormwater https://home.army.mil/lewis-mcchord/index.php/my-Joint-Base-Lewis-Mcchord/all-services/public_works-environmental_division/stormwater https://home.army.mil/lewis-mcchord/index.php/my-Joint-Base-Lewis-Mcchord/all-services/public_works-environmental_division/stormwater

6.3 HOT WORK: N/A

6.3.1 N/A

6.4 ARC/FLASH HAZARD ANALYSIS: N/A

6.4.1 N/A

6.5 SAFETY LOCKOUT/TAGOUT PROCEDURES: N/A

6.5.1 N/A

7. CONTRACTOR QUALITY CONTROL (CQC) DAILY REPORTS:

7.1. Maintain current daily records providing factual evidence that required quality control activities and/or tests have been performed. Contractor shall use the Government-provided daily inspection form. Daily inspection forms shall start at first day of NTP and continue until the project is 100% completed. Indicate a description of trades working on the project, the number of personnel working and hours worked, weather conditions encountered, equipment on site and hours used, and any delays encountered. Cover both conforming and deficient features and include a statement that equipment and materials incorporated in the work and workmanship comply with the contract.

Additionally, annotate job safety evaluations/observations and their results, and any instructions given/received and any conflicts in plans and/or specifications. Furnish the electronic copy of the report to the Government daily within 24 hours after the date covered by the report. Reports need to be submitted for days on which no work is performed. As a minimum, prepare and submit one report for every 7 days of no work and on the last day of a no work period. All calendar days must be accounted for throughout the life of the contract. The first report following a day of no work will be for that day only.

Reports must be signed and dated by the CQC Manager or Site Superintendent.

8. CONTRACTOR PERSONNEL AND SUB-CONTRACTOR

QUALIFICATIONS:

8.1. The Government will not exercise any supervision or control over Contractor or subcontractor employees performing work under this contract. Such employees shall be accountable solely to the Contractor, not the Government.

The Contractor, in turn, shall be accountable to the Government for all Contractor employees.

8.2. The Contractor shall take appropriate personnel action, as required, in the event any employee becomes involved with civilian or local authorities because of misconduct. The Contractor’s employees are subject to the same general rules of conduct while on the Government installation that apply to Government civilian employees.

8.3. The Government reserves the right to refuse access to Government installation grounds to any Contractor employee if the KO determines it to be in the best interest of the Government.

8.4. The Contractor shall not allow any employee to perform work under the contract while under the influence of alcohol, drugs, or any other incapacitating agent.

8.5. The Contractor shall provide a Site Superintendent at the work site during any construction and shall be the main point of contact for the Government QA.

The Site Superintendent shall not be delegated to a subcontractor.

8.6. The Contractor shall provide a Site Safety and Health Officer (SSHO) as required in the EM385-1-1. The Contractor SSHO may be assigned other duties in addition to the duties required as SSHO. The SSHO may not be delegated to subcontractor.

8.6.1. Provide and designate an individual as the SSHO. Provide a site SSHO at the work site at all times to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor. The Contractor Quality Control (CQC) person can be the SSHO on this contract.

Meet the following requirements within the SSHO (Level 3):

a. A minimum of 5 years safety work on similar projects.

b. 30-hour OSHA construction safety class or equivalent within the last 5 years.

c. An average of at least 24 hours of formal safety training each year for the past 5 years.

8.6.2. Construction Safety Hazard Awareness Training: In addition to the above experience, education, and training requirements, the SSHO must have completed the course entitled "Construction Safety Hazard Awareness Training for Contractors." If the SSHO does not have a current certification, that individual must obtain the course certification within sixty (60) calendar days from the date of award.

8.6.3. SSHO Duties (to include but not limited to):

8.6.3.1. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Attach safety inspection logs to the Contractors' daily quality control report.

8.6.3.2. Conduct mishap investigations and complete required reports. Maintain the OSHA Form 300 and Daily Production reports for prime and subcontractors.

8.6.3.3. Maintain applicable safety reference material on the job site to include required equipment inspections.

8.6.3.4. Attend the preconstruction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings.

8.6.3.5. Implement and enforce accepted APP and AHA.

8.6.3.6. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. Post a list of unresolved safety and health deficiencies on the safety bulletin board.

8.6.3.7. Ensure subcontractor compliance with safety and health requirements.

8.7. The Contractor shall provide a CQC System Manager. The CQC System Manager may be assigned other duties in addition to the duties required as CQC System Manager. CQC System Manager may also be the SSHO, PM, or Lead Trades person. The CQC and Site Superintendent may not be the same person. The CQC may not be delegated to subcontractor. The Contractor shall also provide an alternate CQC System Manager. The alternate CQC System Manager may not be delegated to the subcontractor. The requirements for the alternate are the same as the CQC System Manager.

8.7.1. The CQC is required to possess specialized skills to assure the required work is being performed properly. The Contractor's CQC staff must maintain a presence at the job site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure contract compliance.

8.7.2. The CQC System Manager must be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this contract or a construction person with a minimum of 10 years in related work.

8.7.3. As required, the Contractor shall provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: electrical, mechanical, civil, structural, environmental, and architectural. These individuals may perform other duties simultaneously, but must be allowed sufficient time to perform their assigned quality control duties as described in the QCP. A single person may cover more than one area provided that they are qualified to perform QC activities in each designated area.

9. QUALITY CONTROL REQUIREMENTS:

9.1. Quality Control Plan- Include as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents and consultants:

9.1.1. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff will implement the three phase control system for all aspects of the work specified. Include a CQC System Manager who reports to the Project Superintendent.

9.1.2. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function.

9.1.3. A copy of the letter to the CQC System Manager signed by an authorized official of the firm that describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work that is not in compliance with the contract.

Letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities will be issued by the CQC System Manager. Copies of these letters shall be furnished to the Government.

9.1.4. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents, and consultants.

9.1.5. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test.

(Laboratory facilities approved by the KO shall be used.

9.1.6. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.

9.1.7. Procedures for tracking construction deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.

9.1.8. Reporting procedures, including proposed reporting formats.

9.1.9. A list of the definable features of work. A definable feature of work is a task that is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable feature under a particular section.

9.2. 3 Phase Inspection Plan:

9.2.1. Preparatory Phase: This phase is performed prior to beginning work on each definable feature of work; after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase includes:

9.2.1.1. A review of each paragraph of applicable specifications, reference codes, and standards. Make available during the preparatory meeting a copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field. Maintain and make available in the field for use by Government personnel until final acceptance of the work.

9.2.1.2. Review of the contract requirements.

9.2.1.3. Check to assure that all materials and/or equipment are on hand, and have been tested, submitted, and approved as required.

9.2.1.4. Review of provisions that have been made to provide required control inspection and testing.

9.2.1.5. Examination of the work area to assure that all required preliminary work has been accomplished.

9.2.1.6. Review of the hazard analysis.

9.2.1.7. Discussion of procedures for controlling quality of the work including repetitive deficiencies.