Attachment 7 - Experience Project Data Sheet.pdf
PDF 1 MB Posted
- Attached to
- CONSTRUCT NTTC TRAINER (SHOOT HOUSE) Federal contract opportunity
- Solicitation number
- FA301620R0049
About this file
This document package includes an experience project data sheet template and details for a construction solicitation. The Air Force is soliciting proposals to construct a Navy Training and Tactical Simulator (Shoot House) at Joint Base San Antonio-Lackland in San Antonio, Texas. Offerors must complete the experience project data sheet to demonstrate relevant past performance for construction projects between $1,000,000 and $5,000,000. Proposals are due by May 26, 2020 at 5:00pm CST. This 100% small business set-aside project is governed by the Construction Wage Rate Requirement and has an assigned NAICS code of 236220. No award will be made until funds are available for the effort.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 10 -Conceptual Drawings Site Layout.pdf | ||
| Amendment 0002 FA301620R00490002 SF 30.pdf | ||
| Attachment 9- As-builts-Cad Files-see revised 28Apr20.pdf | ||
| Amendment 0001 FA301620R00490001.pdf | ||
| FA301620R0049 - Construct NTTC TTS.pdf | ||
| Attachment 4 - Construction Cost Estimate Breakdown Example.pdf | ||
| Attachment 2 Submittal Register.pdf | ||
| Attachment 3 DD 1354.pdf | ||
| Attachment 4 - Estimated Cost Breakdown 07Jun2018.xls | XLS spreadsheet | |
| Attachment 4 - Construction Cost Estimate Breakdown.xls | XLS spreadsheet | |
| Attachment 5- Physical Data 2019-2020.pdf | ||
| Attachment 8 - Past Performance Information Sheet.pdf | ||
| Attachment 6 -Wage Determination.pdf | ||
| Attachment 1 SOW.pdf | ||
| Attachment 9- As-builts-Cad Files.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 7 – Construction & Design Experience Project Data Sheet
(Present as many projects as requested by the agency in the RFP)
EXAMPLE PROJECT KEY NUMBER
Project No.
PROJECT SAMPLE REFERENCE FOR:
Prime Joint Venture Teaming Partner Designer of Record
Full Plans & Specs Other (explain):
TITLE AND LOCATION (City and State)
Contract No. Task Order (if applicable) DoD Agency or Private/Commercial Entity:
Project Title:
Location (i.e. JBSA Lackland, San Antonio, Texas)
COMPLETE THE TYPE OF PROJECT INFORMATION
Type of Construction Project:
Repair/Alteration Other (Explain):
Type of Design Project:
Design-Build Designer of Record RFP Development Other Engineering Services
Full Plans & Specs Other (explain):
Applicable Divisions:
Architectural Structural Electrical Civil Mechanical
PROJECT OWNER’S INFORMATION
A. Project Owner B. Point Of Contact Name C. Point Of Contact (Email & Telephone Number)
d. Award Date e. Completion Date f. Project Size (Sq. Ft)
g. If PoP had to be extended beyond original PoP on Awarde, please explain reason.
h. Award Amount i. Final Price
j. If Final Amount is different from Contract Amount, please explain reason.
RenovationNew Construction
FA301620R0049 Attachment 7
k. Provide a detailed description of the project and the relevancy to the project requirements of this RFP. If design-build, include a description of the design-effort.
l..Provide a detailed description of what work your firm self-performed on this project.
m. Provide a detailed description of challenges faced, actions taken, and result achieved.
| EXAMPLE PROJECT KEY NUMBER: |
| Project No: |
| PROJECT SAMPLE REFERENCE FOR: |
| Prime: Off |
| Joint Venture: Off |
| Teaming Partner: Off |
| Designer of Record: Off |
| Full Plans Specs Other explain: Off |
| TITLE AND LOCATION City and State: |
| Contract No Task Order if applicable DoD Agency or PrivateCommercial Entity Project Title Location ie JBSA Lackland San Antonio Texas: |
| New Construction: Off |
| Other Explain: Off |
| Renovation: |
| RepairAlteration: Off |
| DesignBuild: Off |
| Designer of Record_2: Off |
| RFP Development: Off |
| Other Engineering Services: Off |
| Full Plans Specs Other explain_2: Off |
| A Project OwnerRow1: |
| B Point Of Contact NameRow1: |
| C Point Of Contact Email Telephone NumberRow1: |
| d Award DateRow1: |
| e Completion DateRow1: |
| f Project Size Sq FtRow1: |
| g If PoP had to be extended beyond original PoP on Awarde please explain reasonRow1: |
| h Award AmountRow1: |
| i Final PriceRow1: |
| j If Final Amount is different from Contract Amount please explain reasonRow1: |
| k Provide a detailed description of the project and the relevancy to the project requirements of this RFP If designbuild include a description of the designeffortRow1: |
| lProvide a detailed description of what work your firm selfperformed on this projectRow1: |
| m Provide a detailed description of challenges faces actions taken and result achievedRow1: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Check Box10: Off |
| Check Box11: Off |
File details come from the government source that posted it. Updated .