Attachment 2 Submittal Register.pdf

PDF 654 KB Posted

Attached to
CONSTRUCT NTTC TRAINER (SHOOT HOUSE) Federal contract opportunity
Solicitation number
FA301620R0049
Issued by
Department of the Air Force Air Education and Training Command

About this file

This submittal register outlines the documentation required from offerors responding to solicitation number FA301620R0049 for the construction of a Navy training center simulator (shoot house) at Joint Base San Antonio - Lackland in San Antonio, Texas. Key submittals include a construction schedule, quality control plan, site plans, environmental protection plans, safety plans, warranties, notices, certifications, and closeout documentation related to asbestos abatement, lead-based paint removal, and hazardous waste disposal. The solicitation is set aside for small businesses with a magnitude between $1 million to $5 million under NAICS code 236220. The proposal due date is May 26, 2020 by 5:00pm CST with award timing to be determined pending available funds.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES

Construct NTTC Trainer

01 11 00 SD-01 Preconstruction Submittals GSalvage Plan

01 14 00 SD-01 Preconstruction Submittals Glist Construction Superintendent

01 30 00 SD-01 Preconstruction Submittals

1.2 GView Location Map

1.3 GProgress and Completion

Pictures 01 32 01.00 10 SD-01 Preconstruction Submittals

GProject Schedule CPM 01 35 29 SD-01 Preconstruction Submittals

1.5 GAccident Prevention Plan (APP)

GActivity Hazard Analysis (AHA)

SD-06 Test Reports GAccident Reports GRegulatory Citations and

Violations 01 35 30 SD-08 Manufacturer’s Instructions

GSite Safety and Health Plan SD-09 Manufacturer’s Field Reports

GSafety and Health Phase-Out Report

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

FA301620R0049 Attachment 2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES

01 45 00.00 20 SD-01 Preconstruction Submittals GContractor Quality Control (CQC)

Plan 01 50 00 SD-01 Preconstruction Submittals

1.2 GConstruction Site Plan

GTraffic Control Plan

01 57 20 SD-01 Preconstruction Submittals

1.6ENVIRONMENTAL

PROTECTION PLAN

G Fish and Wildlife Protection Measures as applicable; G Environmental Permits as applicable; G

3.7.2Equipment Inventory SD-02 Shop Drawings

GAsbestos Work Plans GAsbestos Certifications GAsbestos Transporter License GAsbestos Medical clearances

(may be reviewed on site) GAsbestos Training Certificates GAsbestos TDSHS License as applicable GAny Asbestos Inspection reports that have not been provided by the area specific Environmental Office.

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES

01 57 20 Any Asbestos Inspection Reports that were not included in the original assessment or a results to a change in the scope of work.

G Unsigned copy of State Renovation, Demolition Notifications 15 days prior; G

GLead Work Plans GLead Occupant Protection Plan.

GTexas Department of State

Health Services Lead Licenses GLead Notifications GLead Training Certificates GLead Based Paint Reports GLead Inspection reports

SD-03 Product Data GAsbestos Air Monitoring reports GLead Air Monitoring reports

SD-04 Samples GLead OSHA Negative Exposure

Assessment or GLead Work Plan.

EPA Lead Training GLead Awareness Training certificates GOSHA Air Monitoring

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES

01 57 20 GLead Training Certificates GWaste Disposal Plan, May be included in work plan GLead Inspection reports GLead Based Paint Reports

SD-06 Test Reports

3.1.4.1 GAnalytical Results

01 78 00 SD-01 Preconstruction Submittals GAs-Built Drawings

SD-02 Shop Drawings As-Built Record of Materials

FIO

SD-03 Product Data GWarranty Management Plan

SD-04 Samples GWarranty Tags

02 82 33.13 20 SD-03 Product Data

1.6.4 GVacuum Filters

1.6.1 GRespirators

SD-06 Test Reports

1.5.2.3 Gsampling results

1.5.2.3 GOccupational and Environmental

Assessment Data Report SD-07 Certificates

GQualifications of Competent Person CP

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES

02 82 33.13 20 1.5.1.3 GTesting Laboratory

3.1.1.1 GOccupant Notification

1.5.1.2 GTraining Certification

GNotification of the Commencement of LBP Hazard Abatement

1.5.1.4 GThird Party Consultant

Qualifications

1.5.3 Glead-based paint/paint with lead

removal/control plan

1.6.3 GRental equipment notification

1.5.2.6 GRespiratory Protection Program

1.5.2.7 GHazard Communication Program

3.5.2 GEPA or State approved

hazardous waste treatment, storage, or disposal facility

1.5.2.8 GLead Waste Management Plan

1.6.4 GVacuum filters

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 Ghazardous waste manifest

1.5.2.4 GMedical Examinations

1.5.1.2 GTraining Certification

3.5.2.1 Gturn-in documents or weight

tickets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

File details come from the government source that posted it. Updated .