ATTACHMENT 7 - Clinton County Jail Domestic Water Plant Replacement Combined Specs.pdf

PDF 4 MB Posted

Attached to
Jail Domestic Water Plant Replacement
Solicitation number
000123456789101112
Issued by
Clinton County, South Haven City, Michigan

About this file

This is a comprehensive technical specification document for the Clinton County Jail Domestic Water Plant Replacement project located in St. Johns, Michigan, prepared by Matrix Project (Project #250039.00) dated May 27, 2025. The project involves a complete replacement of the domestic water heating and distribution systems for the Clinton County Jail, including specification details for plumbing, piping, valves, pumps, water softeners, water heaters, and associated mechanical and electrical components. The technical specifications provide extensive technical requirements for materials, installation methods, testing procedures, and performance standards across multiple divisions including plumbing, HVAC, and electrical systems.

The project specifications indicate a focus on high-efficiency, code-compliant equipment with specific requirements for materials like copper tubing, steel piping, valves, pumps, and control systems. Key systems include domestic water heaters (both electric and gas-fired), water softeners, hot water circulation pumps, and associated control infrastructure. The specifications emphasize compliance with national standards such as ASME, NSF, NFPA, and local building codes, with particular attention to lead-free materials, energy efficiency, and proper installation techniques. The technical details suggest a comprehensive replacement and upgrade of the jail's entire domestic water infrastructure, with a strong emphasis on reliability, maintainability, and long-term performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clinton County Jail St. Johns, Michigan

Matrix Project 250039.00 May 27, 2025

TABLE OF CONTENTS TOC- 1

SECTION 00 0102 – TABLE OF CONTENTS

DIVISION 22 PLUMBING

Section 22 0500 Common Work Results for Plumbing Section 22 0519 Meters & Gages for Plumbing Piping Section 22 0523 General-Duty Valves for Plumbing Piping Section 22 0529 Hangers & Supports for Plumbing Piping & Equipment Section 22 0553 Identification for Plumbing Piping & Equipment Section 22 0700 Plumbing Insulation Section 22 1116 Domestic Water Piping Section 22 1119 Domestic Water Piping Specialties Section 22 1123 Domestic Water Pumps Section 22 3100 Domestic Water Softeners Section 22 3300 Electric, Domestic-Water Heaters Section 22 3400 Fuel-Fired Domestic Water Heaters

DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING

Section 23 0500 Common Work Results for HVAC Section 23 0519 Meters & Gages for HVAC Piping Section 23 0523 General-Duty Valve for HVAC Piping Section 23 0529 Hangers & Supports for HVAC Piping & Equipment Section 23 0553 Identification for HVAC Piping & Equipment Section 23 0593 Testing, Adjusting & Balancing for HVAC Section 23 0700 HVAC Insulation Section 23 0900 Instrumentation and Control for HVAC Section 23 0993 Sequence of Operations for HVAC Controls Section 23 1123 Facility Natural Gas Piping Section 23 2113 Hydronic Piping Section 23 2123 Hydronic Pumps

DIVISION 26 ELECTRICAL

Section 26 0010 Basic Electrical Requirements Section 26 0500 Common Work Results for Electrical Section 26 0519 Low-Voltage Electrical Power Conductors and Cables Section 26 0526 Grounding and Bonding for Electrical Systems Section 26 0529 Hangers and Supports for Electrical Systems Section 26 0533 Raceway and Boxes for Electrical Systems Section 26 0544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling Section 26 0553 Identification for Electrical Systems Section 26 2813 Fuses Section 26 2816 Enclosed Switches and Circuit Breakers

Matrix Project 250039.00 May 27, 2025

TABLE OF CONTENTS TOC- 2

PAGE INTENTIONALLY LEFT BLANK

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 1

SECTION 22 0500 – COMMON WORK RESULTS FOR PLUMBING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Piping materials and installation instructions common to most piping systems.

2. Transition fittings.

3. Dielectric fittings.

4. Mechanical sleeve seals.

5. Sleeves.

6. Escutcheons.

7. Grout.

8. Mechanical demolition.

9. Equipment installation requirements common to equipment sections.

10. Painting and finishing.

11. Concrete bases.

12. Supports and anchorages.

13. Mechanical Identification

14. Pipe curbs and equipment supports.

1.3 DEFINITIONS

A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.

B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.

C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.

D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in duct shafts.

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 2

E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures. Examples include installations within unheated shelters.

F. The following are industry abbreviations for plastic materials:

1. ABS: Acrylonitrile-butadiene-styrene plastic.

2. CPVC: Chlorinated polyvinyl chloride plastic.

3. PE: Polyethylene plastic.

4. PVC: Polyvinyl chloride plastic.

G. The following are industry abbreviations for rubber materials:

1. EPDM: Ethylene-propylene-diene terpolymer rubber.

2. NBR: Acrylonitrile-butadiene rubber.

1.4 SUBMITTALS

A. Product Data: For the following:

1. Transition fittings.

2. Dielectric fittings.

3. Mechanical sleeve seals.

4. Escutcheons.

B. Welding certificates.

C. Operation and Maintenance Data: At the end of the project the contractor shall submit two paper copies of the Operation and Maintenance Data to the owner in three ring binders with the project title and contractor’s contact information.

D. Project Record Documents: Throughout the project the contractor shall keep a running record of as-builts showing deviations from the plans. At the end of the project the contractor shall submit one clean hand sketch set of documents to the construction manager and architect/engineer.

1.5 QUALITY ASSURANCE

A. Steel Support Welding: Qualify processes and operators according to AWS D1.1, "Structural Welding Code--Steel."

B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications."

1. Comply with provisions in ASME B31 Series, "Code for Pressure Piping."

2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current.

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 3

C. Electrical Characteristics for Mechanical Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes are appropriately modified. If minimum energy ratings or efficiencies are specified, equipment shall comply with requirements.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.

B. Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending.

1.7 COORDINATION

A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for mechanical installations.

B. Coordinate installation of required supporting devices and set sleeves in poured-in-place concrete and other structural components as they are constructed.

C. Coordinate requirements for access panels and doors for mechanical items requiring access that are concealed behind finished surfaces. Access panels and doors are specified in Division 8 Section "Access Doors and Frames."

D. Drawings are diagrammatical and do not necessarily show all fittings required to meet field conditions and coordination requirements with other trades. The contractor is responsible for making adjustments in the routing and elevations to meet the job requirements and maintaining required slopes as required for each system.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. In other Part 2 articles where subparagraph titles below introduce lists, the following requirements apply for product selection:

1. Manufacturers: Subject to compliance with requirements, provide products by the manufacturers specified or pre-approved equivalent.

2.2 PIPE, TUBE, AND FITTINGS

A. Refer to individual Division 22 piping Sections for pipe, tube, and fitting materials and joining methods.

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 4

B. Pipe Threads: ASME B1.20.1 for factory-threaded pipe and pipe fittings.

2.3 JOINING MATERIALS

A. Refer to individual Division 22 piping Sections for special joining materials not listed below.

B. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.

1. ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch maximum thickness unless thickness or specific material is indicated.

a. Full-Face Type: For flat-face, Class 125, cast-iron and cast-bronze flanges.

b. Narrow-Face Type: For raised-face, Class 250, cast-iron and steel flanges.

2. AWWA C110, rubber, flat face, 1/8 inch thick, unless otherwise indicated; and full-face or ring type, unless otherwise indicated.

C. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated.

D. Plastic, Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated.

E. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to

ASTM B 813.

F. Brazing Filler Metals: AWS A5.8, BCuP Series, copper-phosphorus alloys for general-duty brazing, unless otherwise indicated; and AWS A5.8, BAg1, silver alloy for refrigerant piping, unless otherwise indicated.

G. Welding Filler Metals: Comply with AWS D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.

H. Solvent Cements for Joining Plastic Piping:

1. ABS Piping: ASTM D 2235.

2. CPVC Piping: ASTM F 493.

3. PVC Piping: ASTM D 2564. Include primer according to ASTM F 656.

4. PVC to ABS Piping Transition: ASTM D 3138.

I. Fiberglass Pipe Adhesive: As furnished or recommended by pipe manufacturer.

2.4 TRANSITION FITTINGS

A. AWWA Transition Couplings: Same size as, and with pressure rating at least equal to and with ends compatible with, piping to be joined.

1. Manufacturers:

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 5

a. Cascade Waterworks Mfg. Co.

b. Dresser Industries, Inc.; DMD Div.

c. Ford Meter Box Company, Incorporated (The); Pipe Products Div.

d. JCM Industries.

e. Smith-Blair, Inc.

f. Viking Johnson.

2. Underground Piping NPS 1-1/2 and Smaller: Manufactured fitting or coupling.

3. Underground Piping NPS 2 and Larger: AWWA C219, metal sleeve-type coupling.

4. Aboveground Pressure Piping: Pipe fitting.

B. Plastic-to-Metal Transition Fittings: CPVC and PVC one-piece fitting with manufacturer's Schedule 80 equivalent dimensions; one end with threaded brass insert, and one solvent-cement-joint end.

1. Manufacturers:

a. Eslon Thermoplastics.

C. Plastic-to-Metal Transition Adaptors: One-piece fitting with manufacturer's SDR 11 equivalent dimensions; one end with threaded brass insert, and one solvent-cement-joint end.

1. Manufacturers:

a. Thompson Plastics, Inc.

D. Plastic-to-Metal Transition Unions: MSS SP-107, CPVC and PVC four-part union. Include brass end, solvent-cement-joint end, rubber O-ring, and union nut.

1. Manufacturers:

a. NIBCO INC.

b. NIBCO, Inc.; Chemtrol Div.

E. Flexible Transition Couplings for Underground Nonpressure Drainage Piping: ASTM C 1173 with elastomeric sleeve ends same size as piping to be joined, and corrosion-resistant metal band on each end.

1. Manufacturers:

a. Cascade Waterworks Mfg. Co.

b. Fernco, Inc.

c. Mission Rubber Company.

d. Plastic Oddities, Inc.

2.5 DIELECTRIC FITTINGS

A. Description: Combination fitting of copper alloy and ferrous materials with threaded, solder-joint, plain, or weld-neck end connections that match piping system materials.

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 6

B. Insulating Material: Suitable for system fluid, pressure, and temperature.

C. Dielectric Unions: Factory-fabricated, union assembly, for 250-psig minimum working pressure at 180 deg F.

1. Manufacturers:

a. Capitol Manufacturing Co.

b. Central Plastics Company.

c. Eclipse, Inc.

d. Epco Sales, Inc.

e. Hart Industries, International, Inc.

f. Watts Industries, Inc.; Water Products Div.

g. Zurn Industries, Inc.; Wilkins Div.

D. Dielectric Flanges: Factory-fabricated, companion-flange assembly, for 150 or 300-psig minimum working pressure as required to suit system pressures.

1. Manufacturers:

a. Capitol Manufacturing Co.

b. Central Plastics Company.

c. Epco Sales, Inc.

d. Watts Industries, Inc.; Water Products Div.

E. Dielectric-Flange Kits: Companion-flange assembly for field assembly. Include flanges, full-face- or ring-type neoprene or phenolic gasket, phenolic or polyethylene bolt sleeves, phenolic washers, and steel backing washers.

1. Manufacturers:

a. Advance Products & Systems, Inc.

b. Calpico, Inc.

c. Central Plastics Company.

d. Pipeline Seal and Insulator, Inc.

2. Separate companion flanges and steel bolts and nuts shall have 150 or 300-psig minimum working pressure where required to suit system pressures.

F. Dielectric Couplings: Galvanized-steel coupling with inert and noncorrosive, thermoplastic lining;

threaded ends; and 300-psig minimum working pressure at 225 deg F.

1. Manufacturers:

a. Calpico, Inc.

b. Lochinvar Corp.

G. Dielectric Nipples: Electroplated steel nipple with inert and noncorrosive, thermoplastic lining; plain, threaded, or grooved ends; and 300-psig minimum working pressure at 225 deg F.

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 7

1. Manufacturers:

a. Perfection Corp.

b. Precision Plumbing Products, Inc.

c. Sioux Chief Manufacturing Co., Inc.

d. Victaulic Co. of America.

2.6 MECHANICAL SLEEVE SEALS

A. Description: Modular sealing element unit, designed for field assembly, to fill annular space between pipe and sleeve.

1. Manufacturers:

a. Advance Products & Systems, Inc.

b. Calpico, Inc.

c. Metraflex Co.

d. Pipeline Seal and Insulator, Inc.

2. Sealing Elements: EPDM or NBR interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.

3. Pressure Plates: Plastic, Carbon steel or Stainless steel. Include two for each sealing element.

4. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating or Stainless steel of length required to secure pressure plates to sealing elements. Include one for each sealing element.

2.7 SLEEVES

A. Refer to Detail 13, ‘Openings at PT Anchorage’, on sheet S-401 in the structural construction drawings for sleeve requirements near the PT anchorage points to the elevator and stairwell cores. Steel sleeves are required when slab penetration is within 45° bearing cone of the tendon anchor.

B. Galvanized-Steel Sheet: 0.0239-inch minimum thickness; round tube closed with welded longitudinal joint.

C. Steel Pipe: ASTM A 53, Type E, Grade B, Schedule 40, galvanized, plain ends.

D. Cast Iron: Cast or fabricated "wall pipe" equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.

E. Stack Sleeve Fittings: Manufactured, cast-iron sleeve with integral clamping flange. Include clamping ring and bolts and nuts for membrane flashing.

1. Underdeck Clamp: Clamping ring with set screws.

F. Molded PVC: Permanent, with nailing flange for attaching to wooden forms.

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 8

G. PVC Pipe: ASTM D 1785, Schedule 40.

H. Molded PE: Reusable, PE, tapered-cup shaped, and smooth-outer surface with nailing flange for attaching to wooden forms.

2.8 ESCUTCHEONS

A. Description: Manufactured wall and ceiling escutcheons and floor plates, with an ID to closely fit around pipe, tube, and insulation of insulated piping and an OD that completely covers opening.

B. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped brass with polished chrome-plated finish.

C. One-Piece, Cast-Brass Type: With set screw.

1. Finish: Polished chrome-plated and rough brass.

D. Split-Casting, Cast-Brass Type: With concealed hinge and set screw.

1. Finish: Polished chrome-plated and rough brass.

E. One-Piece, Stamped-Steel Type: With set screw or spring clips and chrome-plated finish.

F. Split-Plate, Stamped-Steel Type: With concealed or exposed-rivet hinge, set screw or spring clips, and chrome-plated finish.

G. One-Piece, Floor-Plate Type: Cast-iron floor plate.

H. Split-Casting, Floor-Plate Type: Cast brass with concealed hinge and set screw.

2.9 GROUT

A. Description: ASTM C 1107, Grade B, nonshrink and nonmetallic, dry hydraulic-cement grout.

1. Characteristics: Post-hardening, volume-adjusting, nonstaining, noncorrosive, nongaseous, and recommended for interior and exterior applications.

2. Design Mix: 5000-psi, 28-day compressive strength.

3. Packaging: Premixed and factory packaged.

2.10 PIPE CURBS AND EQUIPMENT CURBS

A. Manufacturers

1. Pate.

2. RPS Corporation.

3. Thy Curb, Thybar Corporation.

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 9

B. Pipe Curb Assemblies

1. Heavy Gauge galvanized steel with unitized construction and integral base plate, 3 lb density insulation and 2x2 nailer. Furnish acrylic clad thermo plastic cover, fastening screws, & graduated step boots with stainless steel clamps.

2. Height: 18 inches

3. Multiple Pipes: Size and configure cover to accommodate all pipes serving equipment including power conduit and control conduit.

C. Pipe Seals for Single Roof Penetrations:

1. One piece spun aluminum base with 5 inch flange, polyvinyl chloride boot with graduated widths and adjustable stainless steel clamps.

2. Reference Product: Pate-Pipe Seal.

PART 3 - EXECUTION

3.1 PIPING SYSTEMS - COMMON REQUIREMENTS

A. Install piping according to the following requirements and Division 22 Sections specifying piping systems.

B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems.

Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.

C. Install piping in concealed locations, unless otherwise indicated and except in equipment rooms and service areas.

D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

E. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.

F. Install piping to permit valve servicing.

G. Install piping at indicated slopes.

H. Install piping free of sags and bends.

I. Install fittings for changes in direction and branch connections.

J. Install piping to allow application of insulation.

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 10

K. Select system components with pressure rating equal to or greater than system operating pressure.

L. Install escutcheons for penetrations of walls, ceilings, and floors according to the following:

1. New Piping:

a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep-pattern type.

b. Chrome-Plated Piping: One-piece, cast-brass type with polished chrome-plated finish.

c. Insulated Piping: One-piece, stamped-steel type with spring clips.

d. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, cast-brass type with polished chrome-plated finish.

e. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, stamped-steel type.

f. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece or split-casting, cast-brass type with polished chrome-plated finish.

g. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece, stamped-steel type or split-plate, stamped-steel type with concealed hinge and set screw.

h. Bare Piping in Unfinished Service Spaces: One-piece, cast-brass type with polished chrome-plated or rough-brass finish.

i. Bare Piping in Unfinished Service Spaces: One-piece, stamped-steel type with concealed or exposed-rivet hinge and set screw or spring clips.

j. Bare Piping in Equipment Rooms: One-piece, cast-brass type.

k. Bare Piping in Equipment Rooms: One-piece, stamped-steel type with set screw or spring clips.

l. Bare Piping at Floor Penetrations in Equipment Rooms: One-piece, floor-plate type.

M. Permanent sleeves are not required for holes formed by removable PE sleeves.

N. Install sleeves for pipes passing through concrete and masonry walls and concrete floor and roof slabs.

O. Install sleeves for pipes passing through concrete and masonry walls, gypsum-board partitions, and concrete floor and roof slabs.

1. Cut sleeves to length for mounting flush with both surfaces.

a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches above finished floor level. Extend cast-iron sleeve fittings below floor slab as required to secure clamping ring if ring is specified.

2. Install sleeves in new walls and slabs as new walls and slabs are constructed.

3. Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation. Use the following sleeve materials:

a. PVC or Steel Pipe Sleeves: For pipes smaller than NPS 8 (DN 150).

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 11

1) Refer to Detail 13, ‘Openings at PT Anchorage’, on sheet S-401 in the structural construction drawings for sleeve requirements near the PT anchorage points to the elevator and stairwell cores. Steel sleeves are required when slab penetration is within 45° bearing cone of the tendon anchor.

b. Steel Sheet Sleeves: For pipes NPS 6 (DN 150) and larger, penetrating gypsum-board partitions.

c. Stack Sleeve Fittings: For pipes penetrating floors with membrane waterproofing.

Secure flashing between clamping flanges. Install section of cast-iron soil pipe to extend sleeve to 2 inches above finished floor level. Refer to Division 7 Section "Sheet Metal Flashing and Trim" for flashing.

1) Seal space outside of sleeve fittings with grout.

4. Except for underground wall penetrations, seal annular space between sleeve and pipe or pipe insulation, using joint sealants appropriate for size, depth, and location of joint. Refer to Division 7 Section "Joint Sealants" for materials and installation.

P. Aboveground, Exterior-Wall Pipe Penetrations: Seal penetrations using sleeves and mechanical sleeve seals. Select sleeve size to allow for 1-inch annular clear space between pipe and sleeve for installing mechanical sleeve seals.

1. Install steel pipe for sleeves smaller than 6 inches in diameter.

2. Install cast-iron "wall pipes" for sleeves 6 inches and larger in diameter.

3. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble mechanical sleeve seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.

Q. Underground, Exterior-Wall Pipe Penetrations: Install cast-iron "wall pipes" for sleeves. Seal pipe penetrations using mechanical sleeve seals. Select sleeve size to allow for 1-inch annular clear space between pipe and sleeve for installing mechanical sleeve seals.

1. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble mechanical sleeve seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.

R. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Refer to Division 7 Section "Through- Penetration Firestop Systems" for materials.

S. Verify final equipment locations for roughing-in.

T. Refer to equipment specifications in other Sections of these Specifications for roughing-in requirements.

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 12

3.2 PIPING JOINT CONSTRUCTION

A. Join pipe and fittings according to the following requirements and Division 22 Sections specifying piping systems.

B. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

C. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

D. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end.

Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy complying with ASTM B 32.

E. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube" Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8.

F. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged.

Do not use pipe sections that have cracked or open welds.

G. Welded Joints: Construct joints according to AWS D10.12, using qualified processes and welding operators according to Part 1 "Quality Assurance" Article.

H. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application.

Install gasket concentrically positioned. Use suitable lubricants on bolt threads.

I. Plastic Piping Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:

1. Comply with ASTM F 402 for safe-handling practice of cleaners, primers, and solvent cements.

2. ABS Piping: Join according to ASTM D 2235 and ASTM D 2661 Appendixes.

3. CPVC Piping: Join according to ASTM D 2846/D 2846M Appendix.

4. PVC Pressure Piping: Join schedule number ASTM D 1785, PVC pipe and PVC socket fittings according to ASTM D 2672. Join other-than-schedule-number PVC pipe and socket fittings according to ASTM D 2855.

5. PVC Nonpressure Piping: Join according to ASTM D 2855.

6. PVC to ABS Nonpressure Transition Fittings: Join according to ASTM D 3138 Appendix.

J. Plastic Pressure Piping Gasketed Joints: Join according to ASTM D 3139.

K. Plastic Nonpressure Piping Gasketed Joints: Join according to ASTM D 3212.

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 13

3.3 PIPING CONNECTIONS

A. Make connections according to the following, unless otherwise indicated:

1. Install unions, in piping NPS 2 and smaller, adjacent to each valve and at final connection to each piece of equipment.

2. Install flanges, in piping NPS 2-1/2 and larger, adjacent to flanged valves and at final connection to each piece of equipment.

3. Dry Piping Systems: Install dielectric unions and flanges to connect piping materials of dissimilar metals.

4. Wet Piping Systems: Install dielectric coupling and nipple fittings to connect piping materials of dissimilar metals.

3.4 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS

A. Install equipment to allow maximum possible headroom unless specific mounting heights are not indicated.

B. Install equipment level and plumb, parallel and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.

C. Install mechanical equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference to other installations. Extend grease fittings to accessible locations.

D. Install equipment to allow right of way for piping installed at required slope.

E. Install equipment per the manufacturer’s recommendations. If the manufacturer’s recommendations are different than shown on the construction documents or as otherwise specified contact the engineer.

F. Contractor shall provide all equipment and associated controls required to provide a complete and operable system.

G. The scope of work for all Division 22 sections includes all miscellaneous work needed (whether or not specified or shown on the documents) to produce a complete and fully operational system.

3.5 PAINTING

A. Painting of mechanical systems, equipment, and components is specified in Architectural Section.

B. Damage and Touchup: Repair marred and damaged factory-painted finishes with materials and procedures to match original factory finish.

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 14

3.6 CONCRETE BASES

A. Concrete Bases: Anchor equipment to concrete base according to equipment manufacturer's written instructions and according to seismic codes at Project.

1. Construct concrete bases of dimensions indicated, but not less than 4 inches larger in both directions than supported unit.

2. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch centers around the full perimeter of the base.

3. Install epoxy-coated anchor bolts for supported equipment that extend through concrete base, and anchor into structural concrete floor.

4. Place and secure anchorage devices. Use supported equipment manufacturer's setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

5. Install anchor bolts to elevations required for proper attachment to supported equipment.

6. Install anchor bolts according to anchor-bolt manufacturer's written instructions.

7. Use 3000-psi, 28-day compressive-strength concrete.

3.7 ERECTION OF METAL SUPPORTS AND ANCHORAGES

A. Refer to Division 5 Section "Metal Fabrications" for structural steel.

B. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor mechanical materials and equipment.

C. Field Welding: Comply with AWS D1.1.

3.8 ERECTION OF WOOD SUPPORTS AND ANCHORAGES

A. Cut, fit, and place wood grounds, nailers, blocking, and anchorages to support, and anchor mechanical materials and equipment.

B. Select fastener sizes that will not penetrate members if opposite side will be exposed to view or will receive finish materials. Tighten connections between members. Install fasteners without splitting wood members.

C. Attach to substrates as required to support applied loads.

3.9 GROUTING

A. Mix and install grout for mechanical equipment base bearing surfaces, pump and other equipment base plates, and anchors.

B. Clean surfaces that will come into contact with grout.

C. Provide forms as required for placement of grout.

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 15

D. Avoid air entrapment during placement of grout.

E. Place grout, completely filling equipment bases.

F. Place grout on concrete bases and provide smooth bearing surface for equipment.

G. Place grout around anchors.

H. Cure placed grout.

END OF SECTION 22 0500

Matrix Project 250039.00 May 27, 2025

COMMON WORK RESULTS FOR PLUMBING 22 0500 - 16

Matrix Project 250039.00 May 27, 2025

METERS AND GAGES FOR PLUMBING PIPING 22 0519 - 1

SECTION 22 0519 - METERS AND GAGES FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Thermometers.

2. Thermowells

3. Gages.

B. Related Sections:

1. Division 22 Section "Facility Water Distribution Piping" for domestic and fire-protection water service meters outside the building.

2. Division 22 Section "Domestic Water Piping" for domestic and fire-protection water service meters inside the building.

3. Division 23 Section "Facility Natural-Gas Piping" for gas meters.

1.3 DEFINITIONS

A. CR: Chlorosulfonated polyethylene synthetic rubber.

B. EPDM: Ethylene-propylene-diene terpolymer rubber.

1.4 SUBMITTALS

A. Product Data: For each type of product indicated; include performance curves.

B. Shop Drawings: Schedule for thermometers and gages indicating manufacturer's number, scale range, and location for each.

Matrix Project 250039.00 May 27, 2025

METERS AND GAGES FOR PLUMBING PIPING 22 0519 - 2

PART 2 - PRODUCTS

2.1 PLASTIC-CASE, LIQUID-IN-GLASS THERMOMETERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following or pre-approved equivalent:

1. Ernst Gage Co.

2. Eugene Ernst Products Co.

3. Marsh Bellofram.

4. Miljoco Corp.

5. Trerice, H. O. Co.

6. Weksler Instruments Operating Unit; Dresser Industries; Instrument Div.

7. Winters Instruments.

B. Case: Plastic, 7 inches long.

C. Tube: Red or blue reading, mercury or organic-liquid filled, with magnifying lens.

D. Tube Background: Satin-faced, nonreflective aluminum with permanently etched scale markings.

E. Window: Glass or plastic.

F. Connector: Adjustable type, 180 degrees in vertical plane, 360 degrees in horizontal plane, with locking device.

G. Stem: Metal, for thermowell installation and of length to suit installation.

H. Accuracy: Plus or minus 1 percent of range or plus or minus 1 scale division to maximum of

1.5 percent of range.

I. Pressure Rating: Pressure rating equal to or greater than system operating pressure.

2.2 THERMOWELLS

A. Manufacturers: Subject to compliance with requirements.

B. Manufacturers: Same as manufacturer of thermometer being used.

C. Description: Pressure-tight, socket-type metal fitting made for insertion into piping and of type, diameter, and length required to hold thermometer.

D. Pressure Rating: Pressure rating equal to or greater than system operating pressure.

Matrix Project 250039.00 May 27, 2025

METERS AND GAGES FOR PLUMBING PIPING 22 0519 - 3

2.3 PRESSURE GAGES

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following or pre-approved equivalent:

1. AMETEK, Inc.; U.S. Gauge Div.

2. Ashcroft Commercial Instrument Operations; Dresser Industries; Instrument Div.

3. Ernst Gage Co.

4. Eugene Ernst Products Co.

5. KOBOLD Instruments, Inc.

6. Marsh Bellofram.

7. Miljoco Corp.

8. Noshok, Inc.

9. Palmer - Wahl Instruments Inc.

10. REO TEMP Instrument Corporation.

11. Trerice, H. O. Co.

12. Weiss Instruments, Inc.

13. Weksler Instruments Operating Unit; Dresser Industries; Instrument Div.

14. WIKA Instrument Corporation.

15. Winters Instruments.

B. Direct-Mounting, Dial-Type Pressure Gages: Indicating-dial type complying with

ASME B40.100.

1. Case: Dry or Liquid-filled type, metal or plastic, 2-1/2-inch diameter.

2. Pressure-Element Assembly: Bourdon tube, unless otherwise indicated.

3. Pressure Connection: Brass, NPS 1/4, bottom-outlet type unless back-outlet type is indicated.

4. Movement: Mechanical, with link to pressure element and connection to pointer.

5. Dial: Satin-faced, nonreflective aluminum with permanently etched scale markings.

6. Pointer: Red or other dark-color metal.

7. Window: Glass or plastic.

8. Ring: Metal or plastic.

9. Accuracy: Grade B, plus or minus 2 percent of middle half scale.

10. Pressure Range: 0 to 100 psig and 0 to 200 psig

11. Range for Fluids under Pressure: Two times operating pressure.

C. Pressure-Gage Fittings:

1. Valves: NPS 1/4 brass or stainless-steel needle type.

2. Snubbers: ASME B40.5, NPS 1/4 brass bushing with corrosion-resistant, porous-metal disc of material suitable for system fluid and working pressure.

Matrix Project 250039.00 May 27, 2025

METERS AND GAGES FOR PLUMBING PIPING 22 0519 - 4

PART 3 - EXECUTION

3.1 THERMOMETER APPLICATIONS

A. Install liquid-in-glass thermometers in the outlet of each domestic, hot-water storage tank & heat exchanger.

B. Provide the following temperature ranges for thermometers:

1. Domestic Hot Water: 30 to 180 deg F, with 2-degree scale divisions.

2. Domestic Cold Water: 0 to 100 deg F, with 2-degree scale divisions.

3.2 GAGE APPLICATIONS

A. Install dry-case-type pressure gages for discharge of each pressure-reducing valve.

3.3 INSTALLATIONS

A. Install direct-mounting thermometers and adjust vertical and tilted positions.

B. Install thermowells with socket extending to center of pipe and in vertical position in piping tees where thermometers are indicated.

C. Install direct-mounting pressure gages in piping tees with pressure gage located on pipe at most readable position.

D. Install needle-valve and snubber fitting in piping for each pressure gage.

E. Install thermometers and gages adjacent to machines and equipment to allow service and maintenance for thermometers, gages, machines, and equipment.

F. Adjust faces of thermometers and gages to proper angle for best visibility.

END OF SECTION 22 0519

Matrix Project 250039.00 May 27, 2025

GENERAL-DUTY VALVES FOR PLUMBING PIPING 220523 - 1

SECTION 22 0523 – GENERAL-DUTY VALVES FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 DEFINITIONS

A. Standard Pressure Cold Water, Hot Water, and Hot Water Return Piping: Operating Pressure is equal to or less than 80 psig.

1.3 SUMMARY

A. This Section includes the following general-duty valves:

1. Copper-alloy ball valves.

2. Ferrous-alloy butterfly valves.

3. Bronze check valves.

4. Gray-iron swing check valves.

5. Spring-loaded, lift-disc check valves.

6. Gate valves.

7. Bronze globe valves.

B. See other Sections for general-duty and specialty valves for site construction piping.

1.4 PERFORMANCE REQUIREMENTS

A. Standard Pressure Piping & Components: Provide components and installation capable of producing domestic water piping systems with 125 psig, unless otherwise indicated.

1.5 SUBMITTALS

A. Product Data: For each type of valve indicated. Include body, seating, and trim materials;

valve design; pressure and temperature classifications; end connections; arrangement;

dimensions; and required clearances. Include list indicating valve and its application. Include rated capacities; furnished specialties; and accessories.

1.6 QUALITY ASSURANCE

A. ASME Compliance: ASME B31.9 for building services piping valves.

Matrix Project 250039.00 May 27, 2025

GENERAL-DUTY VALVES FOR PLUMBING PIPING 220523 - 2

B. ASME Compliance for Ferrous Valves: ASME B16.10 and ASME B16.34 for dimension and design criteria.

C. NSF Compliance: NSF 61 and 372 for valve materials for potable-water service.

D. ANSI Compliance: ANSI 372

E. Senate Bills 3874: All valves 2 inches and smaller shall be lead free with lead content less than 0.25%.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. In other Part 2 articles where subparagraph titles below introduce lists, the following requirements apply for product selection:

1. Manufacturers: Subject to compliance with requirements, provide products by the manufacturers specified or pre-approved equivalent.

2.2 VALVES, GENERAL

A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.

B. ASME Compliance:

1. ASME B1.20.1 for threads for threaded end valves.

2. ASME B16.1 for flanges on iron valves.

3. ASME B16.5 for flanges on steel valves.

4. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.

C. NSF Compliance: NSF 61 and NSF 372 for valve materials for potable-water service.

D. Bronze valves shall be made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.

E. Valve Pressure and Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

F. Valve Sizes: Same as upstream pipe, unless otherwise indicated.

G. Refer to Part 3 "Valve Applications" Article for applications of valves.

H. Bronze Valves: NPS 2 and Smaller: Threaded ends, unless otherwise indicated.

I. Brass Valves: NPS 2 and Smaller: Victaulic VIP Press 304™ ends, unless otherwise indicated

Matrix Project 250039.00 May 27, 2025

GENERAL-DUTY VALVES FOR PLUMBING PIPING 220523 - 3

J. Ferrous Valves NPS 2-1/2 and Larger: Grooved or flanged ends, unless otherwise indicated.

K. Valve Actuators:

1. Handwheel: For valves other than quarter-turn types.

2. Lever Handle: For quarter-turn valves NPS 6 and smaller, except plug valves.

L. Extended Valve Stems: On insulated valves.

M. Valve Flanges: ASME B16.1 for cast-iron valves, ASME B16.5 for steel valves, and ASME B16.24 for bronze valves.

N. Valve Grooved Ends: ASME/AWWA C606.

1. Solder Joint: With sockets according to ASME B16.18.

a. Caution: Use solder with melting point below 840 deg F for check, gate, and globe valves; below 421 deg F for ball valves.

2. Threaded: With threads according to ASME B1.20.1.

O. Valve Bypass and Drain Connections: MSS SP-45.

2.3 COPPER-ALLOY BALL VALVES

A. Manufacturers:

1. One-Piece, Copper-Alloy Ball Valves:

a. Conbraco Industries, Inc.; Apollo Div.

b. Jenkins Valves.

c. Stockham Valves.

d. Grinnell Corporation.

e. Jamesbury, Inc.

f. NIBCO INC.

g. Watts Industries, Inc.; Water Products Div.

2. Two-Piece, Copper-Alloy Ball Valves:

a. Conbraco Industries, Inc.; Apollo Div.

b. Crane Valves.

c. Jenkins Valves.

d. Stockham Valves.

e. Grinnell Corporation.

f. Hammond Valve.

g. Jamesbury, Inc.

h. Milwaukee Valve Company.

i. NIBCO INC.

j. Victaulic Company of America

Matrix Project 250039.00 May 27, 2025

GENERAL-DUTY VALVES FOR PLUMBING PIPING 220523 - 4

k. Watts Industries, Inc.; Water Products Div.

B. Plumbing

1. Ball Valves – 2” and Smaller (Alternate to standard port): Ball valves shall be 300 or 600# WOG, 150# SWP, 2 piece body style, full port, CP solid brass tunneled ball, reinforced Teflon seats, hex gland follower, bronze body of ASTM B584, blowout proof stem, lever handle.

2. Ball Valves – 3” and Smaller: Ball valves shall be 300 or 600# WOG, 150# SWP, 2 piece body style, STD port, CP solid brass tunneled ball, reinforced Teflon seats, hex gland follower, bronze body of ASTM B584, blowout proof stem, lever handle.

2.4 FERROUS-ALLOY BUTTERFLY VALVES

A. Manufacturers:

a. Ferrous-Alloy Butterfly Valves:

b. Crane Co.; Crane Valve Group; Center Line.

c. Stockham Valves.

d. Grinnell Corporation.

e. Hammond Valve.

f. Metraflex Co.

g. Milwaukee Valve Company.

h. Mueller Steam Specialty.

i. NIBCO INC.

j. Tyco International, Ltd.; Tyco Valves & Controls.

k. Victaulic Company of America

l. Watts Industries, Inc.; Water Products Div.

B. Plumbing

1. Butterfly Valves – 3” & Larger: Butterfly valves shall be 200# WOG, full lug body of ASTM A126 Class B cast iron, aluminum bronze disc, 416 stainless steel stems, 2 piece stem design, field replaceable hard phenolic backed EPDM liner, non-metallic. stem journal, blow-out proof stem, extended neck, MSS SP-67

2. Butterfly Valves, Grooved-End: 175 or 300 psig CWP rating, ferrous alloy, ductile iron body with grooved or shouldered ends in accordance with ASME/AWWA C606.

2.5 BRONZE CHECK VALVES

A. Manufacturers:

1. Type 1, Bronze, Horizontal Lift Check Valves with Metal Disc:

a. Cincinnati Valve Co.

b. Crane Co.; Crane Valve Group; Crane Valves.

c. Crane Co.; Crane Valve Group; Stockham Div.

Matrix Project 250039.00 May 27, 2025

GENERAL-DUTY VALVES FOR PLUMBING PIPING 220523 - 5

2. Bronze, Swing Check Valves with Metal Disc:

a. Cincinnati Valve Co.

b. Crane Co.; Crane Valve Group; Crane Valves.

c. Crane Co.; Crane Valve Group; Jenkins Valves.

d. Crane Co.; Crane Valve Group; Stockham Div.

e. Grinnell Corporation.

f. Hammond Valve.

g. Milwaukee Valve Company.

h. NIBCO INC.

i. Powell, Wm. Co.

j. Victaulic Company of America

k. Watts Industries, Inc.; Water Products Div.

B. Plumbing

1. Check Valves – up to 2½”: Check valves shall be class 125# SWP, 200# WOG, horizontal swing check, body and cap shall be of ASTM B62 cast bronze, TFE disc, integral bronze seats, MSS SP-80

2.6 SPRING-LOADED, LIFT-DISC CHECK VALVES

A. Manufacturers:

1. Lift-Disc Check Valves:

a. Flomatic Valves.

b. Grinnell Corporation.

c. Hammond Valve.

d. Metraflex Co.

e. Milwaukee Valve Company.

f. Mueller Steam Specialty.

g. NIBCO INC.

h. Victaulic Company of America

B. Plumbing

1. Spring Lift Check Valves – up to 2”: Check valves shall be 200# WOG minimum, bronze body, in-line spring lift check, TFE or Buna disc, integral seats.

2. Spring-assisted, Grooved end Check Valves: Ductile Iron body, aluminum bronze disc, stainless steel spring and shaft, synthetic rubber seal suitable for intended service, 300 psi maximum CWP.

2.7 GATE VALVES

A. Manufacturers:

1. Gate Valves:

Matrix Project 250039.00 May 27, 2025

GENERAL-DUTY VALVES FOR PLUMBING PIPING 220523 - 6

a. Cincinnati Valve Co.

b. Crane Co.; Crane Valve Group; Crane Valves.

c. Crane Co.; Crane Valve Group; Jenkins Valves.

d. Crane Co.; Crane Valve Group; Stockham Div.

e. Grinnell Corporation.

f. Hammond Valve.

g. Milwaukee Valve Company.

h. NIBCO INC.

i. Powell, Wm. Co.

j. Watts Industries, Inc.; Water Products Div.

B. Plumbing

1. Gate Valves – Up To 2 ½”: Gate valves shall be class 125# SWP, 200# WOG, rising stem, threaded bonnet, solid wedge, malleable iron handwheel, body and bonnet shall be of ASTM B62 bronze, non-asbestos packing, MSS SP-80.

2. Gate Valves – 3” and larger: Gate valves shall be class 125# SWP, 200# WOG, rising stem, OS&Y, bolted bonnet, body and bonnet shall be of ASTM A126 Class B cast iron, flange ends, bronze trim, non-asbestos packing, MSS SP-70.

2.8 BRONZE GLOBE VALVES

A. Manufacturers:

1. Bronze Globe Valves:

a. Cincinnati Valve Co.

b. Crane Co.; Crane Valve Group; Crane Valves.

c. Crane Co.; Crane Valve Group; Jenkins Valves.

d. Crane Co.; Crane Valve Group; Stockham Div.

e. Grinnell Corporation.

f. Hammond Valve.

g. Milwaukee Valve Company.

h. NIBCO INC.

i. Powell, Wm. Co.

B. Plumbing

1. Globe valves – Up To 2½”: Globe valves shall be class 125# SWP, 200# WOG, threaded bonnet, body and bonnet shall be ASTM B62 bronze, bronze disc and seat, malleable iron handwheel, non-asbestos packing, MSS SP-80.

PART 3 - EXECUTION

3.1 VALVE APPLICATIONS

A. If valve applications are not indicated, use the following:

Matrix Project 250039.00 May 27, 2025

GENERAL-DUTY VALVES FOR PLUMBING PIPING 220523 - 7

1. Shutoff Service: Ball, butterfly, or gate valves.

2. Throttling Service: Ball, butterfly, or globe valves.

3. Pump Discharge: Spring-loaded, lift-disc check valves.

B. If valves with specified SWP classes or CWP ratings are not available, the same types of valves with higher SWP class or CWP ratings may be substituted.

3.2 VALVE INSTALLATION

A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

C. Locate valves for easy access and provide separate support where necessary.

D. Install valves in horizontal piping with stem at or above center of pipe.

E. Install valves in position to allow full stem movement.

F. Provide stem extensions for ball valves being installed on insulated lines.

G. Provide memory stops for all valves to be used for balancing.

H. Install butterfly valves with stem at the horizontal, and so that the handle points down when closed, and in the direction of flow when in the open position.

I. Adjust all packing nuts after installation.

J. Provide lever handles for 6” and smaller butterfly valves.

K. Provide gear operator for 8” and larger butterfly valves.

L. Provide chain wheel operator when above 7 feet.

3.3 JOINT CONSTRUCTION

A. Refer to Division 22 Section "Common Work Results for Plumbing" for basic piping joint construction.

B. Grooved Joints: Assemble joints with keyed coupling housing, gasket, lubricant, and bolts according to coupling and fitting manufacturer's written instructions.

C. Soldered Joints: Use ASTM B 813, water-flushable, lead-free flux; ASTM B 32, lead-free-alloy solder; and ASTM B 828 procedure, unless otherwise indicated.

Matrix Project 250039.00 May 27, 2025

GENERAL-DUTY VALVES FOR PLUMBING PIPING 220523 - 8

3.4 ADJUSTING

A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing. Replace valves if persistent leaking occurs.

END OF SECTION 22 0523

Matrix Project 250039.00 May 27, 2025

HANGERS & SUPPORTS FOR PLUMBING PIPING & EQUIPMENT 22 0529 - 1

SECTION 22 0529 – HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes hangers and supports for mechanical system piping and equipment.

1.2 DEFINITIONS

A. Terminology: As defined in MSS SP-90, "Guidelines on Terminology for Pipe Hangers and Supports."

1.3 PERFORMANCE REQUIREMENTS

A. Design channel support systems for piping to support multiple pipes capable of supporting combined weight of supported systems, system contents, and test water.

B. Design heavy-duty steel trapezes for piping to support multiple pipes capable of supporting combined weight of supported systems, system contents, and test water.

1.4 SUBMITTALS

A. Product Data: For each type of pipe hanger, channel support system component, and thermal-hanger shield insert indicated.

1.5 QUALITY ASSURANCE

A. Welding: Qualify procedures and personnel according to AWS D1.1, "Structural Welding Code--Steel."

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. In other Part 2 articles where subparagraph titles below introduce lists, the following requirements apply for product selection:

1. Manufacturers: Subject to compliance with requirements, provide products by the manufacturers specified or pre-approved equivalent.

Matrix Project 250039.00 May 27, 2025

HANGERS & SUPPORTS FOR PLUMBING PIPING & EQUIPMENT 22 0529 - 2

2.2 MANUFACTURED UNITS

A. Pipe Hangers, Supports, and Components: MSS SP-58, factory-fabricated components.

1. Manufacturers:

a. AAA Technology and Specialties Co., Inc.

b. B-Line Systems, Inc.

c. Carpenter & Patterson, Inc.

d. Empire Tool & Manufacturing Co., Inc.

e. Globe Pipe Hanger Products, Inc.

f. Anvil International.

g. GS Metals Corp.

h. Michigan Hanger Co., Inc.

i. National Pipe Hanger Corp.

j. PHD Manufacturing, Inc.

k. PHS Industries, Inc.

l. Piping Technology & Products, Inc.

2. Galvanized, Metallic Coatings: For piping and equipment that will not have field-applied finish.

3. Nonmetallic Coatings: On attachments for electrolytic protection where attachments are in direct contact with copper tubing.

B. Channel Support Systems: MFMA-2, factory-fabricated components for field assembly.

1. Manufacturers:

a. B-Line Systems, Inc.

b. Anvil International.

c. GS Metals Corp.

d. Michigan Hanger Co., Inc.

e. National Pipe Hanger Corp.

f. Thomas & Betts Corp.

g. Unistrut Corp.

h. Wesanco, Inc.

2. Coatings: Manufacturer's standard finish, unless bare metal surfaces are indicated.

3. Nonmetallic Coatings: On attachments for electrolytic protection…