About this file

These are the architectural and engineering drawings for the Clinton County Jail Domestic Water Plant Replacement project located at 1347 East Townsend Road in Saint Johns, Michigan. The comprehensive set of mechanical, electrical, and plumbing drawings detail a phased replacement of the existing domestic water system, including demolition and installation of new equipment. The project involves removing existing water softeners, water heaters, storage tanks, pumps, and associated piping, and replacing them with new systems across three distinct phases. The drawings specify detailed requirements for equipment removal, piping modifications, electrical connections, and installation of new domestic water infrastructure components.

The project involves multiple new components, including water softener systems, domestic water heaters, storage tanks, booster heaters, circulating pumps, and a thermostatic mixing valve. The electrical drawings indicate the new equipment will be connected to existing electrical panels, specifically panel "RFQ", with careful attention to maintaining continuous water service during the renovation. The phasing approach allows for minimal disruption to the jail's operations, with system shutdowns limited to specific hours (6:30 PM-4:00 AM) and requiring advance coordination with the owner. The drawings are prepared by Matrix Consulting Engineers from Lansing, Michigan, and provide comprehensive technical specifications for contractors bidding on the water plant replacement project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL DRAWING INDEX

MECHANICAL/ELECTRICAL ENGINEER

CLINTON COUNTY JAIL

DOMESTIC WATER PLANT REPLACEMENT

1347 EAST TOWNSEND RD,

SAINT JOHNS, MI 48879

ELECTRICAL DRAWING INDEX

M A

T R

I X

GENERAL HVAC NOTES

1. LOCATE EXHAUST OUTLETS OF VENTILATION SYSTEMS,

COMBUSTION EQUIPMENT STACKS AT LEAST 10 FEET FROM

OUTDOOR AIR INTAKES.

2. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION

THAT MAY AFFECT NORMAL OPERATION OF OTHER AREAS.

3. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY

CONFLICT WITH NEW CONSTRUCTION AND RELOCATE AS

NEEDED.

4. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER

DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.

5. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,

ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS THAT

MAY AFFECT THE WORK.

6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING

THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW"

CONDITION DURING CONSTRUCTION.

7. ALL WORK SHALL BE PERFORMED BY LICENSED

CONTRACTORS AND SUBCONTRACTORS AS REQUIRED BY LAW.

8. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE,

LATEST APPLICABLE EDITION.

9. ALL CONDENSATE DRAIN PIPING SET @ MIN. 1% SLOPE.

10. ALL CONDENSATE DRAIN PIPING TO TERMINATE TO DRAIN VIA

AIR GAP.

11. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR

SPECIFICATIONS THE MORE STRINGENT AND GREATER COST

ITEM SHALL BE USED.

12. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF

TERMINATION OF PIPES AND DUCTS AND SUGGESTED ROUTES.

IT IS NOT INTENTION OF DRAWINGS TO INDICATE ALL

NECESSARY OFFSETS. INSTALL WORK IN MANNER TO

CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE

HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.

DO NOT SCALE FROM DRAWINGS.

HVAC & PLUMBING SYMBOLS LEGEND

HVAC PIPING SYMBOLS

HVAC DUCTWORK

TEMPERATURE CONTROL SYMBOLS

M

P

M

H

S

T P T N

T

MISCELLANEOUS NOTES

HVAC DUCTWORK SYMBOLS

HVAC PIPING & PLUMBING VALVES

HVAC & PLUMBING ABBREVIATIONS

AC AIR COMPRESSOR

AD AREA DRAIN

AFF ABOVE FINISH FLOOR

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

ASR AUTOMATIC SPRINKLER RISER

A.T.C. ARCHITECTURAL TRADES CONTRACTOR

B BOILER

B.A.S. BUILDING AUTOMATION SYSTEM

BFS BELOW FLOOR SLAB

BWV BACK WATER VALVE

CAF COMBUSTION AIR FAN

CB CATCH BASIN

CC COOLING COIL

CFM CUBIC FEET PER MINUTE

CHLR CHILLER

CHP CONSOLE HEAT PUMP

CI CAST IRON

CO CLEAN OUT

CONV CONVECTOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONTROL VALVE

CWP CHILLED WATER PUMP

DB DRY BULB

DF DRINKING FOUNTAIN

DFU DUCT FURNACE

DIA DIAMETER

DN DOWN

DPR DAMPER

DS DUCT SILENCER

DWH DOMESTIC WATER HEATER

EAT ENTERING AIR TEMPERATURE

EF EXHAUST FAN

EG EXHAUST GRILLE

E.T.C. ELECTRICAL TRADES CONTRACTOR

EVR EVAPORATOR

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EXIST EXISTING

FC FINAL CONNECTIONS

FD FLOOR DRAIN

FDC FIRE DEPT. CONNECTION

FF FINISH FLOOR

FHV FIRE HOSE VALVE

FPM FEET PER MINUTE

FPVAV FAN POWERED VARIABLE AIR VOLUME BOX

FT FEET

FTR FINNED TUBE RADIATION

FU FURNACE

GAL GALLON

GD GARBAGE DISPOSAL

GFRH GAS FIRED RADIANT HEATER

GI GREASE INTERCEPTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GR GRILLE

H HUMIDIFIER

HB HOSE BIB

HC HEATING COIL

HD HEAD (FT)

HP HORSE POWER

HHP HORIZONTAL HEAT PUMP

HTG HEATING

HVAC HEATING, VENTILATION, & AIR

CONDITIONING

HWP HEATING WATER PUMP

HX HEAT EXCHANGER

ID INSIDE DIAMETER

I.E. INVERT ELEVATION

IAH INTAKE HOOD

LAT LEAVING AIR TEMPERATURE

LAV LAVATORY

LH LATENT HEAT (MBH)

LT LAUNDRY TRAY

LWT LEAVING WATER TEMPERATURE

MA MEDICAL AIR

MAX MAXIMUM

MBH BTU PER HOUR (THOUSAND)

MGC MEDICAL GAS CONSOLE

MH MAN HOLE

MIN MINIMUM

MS MOP SINK

M.T.C. MECHANICAL TRADES CONTRACTOR

N.C. NOISE CRITERIA

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NTS NOT TO SCALE

ORD OVERFLOW ROOF DRAIN

OXY OXYGEN

P PUMP

PCR PUMPED CONDENSATE RETURN

PD PRESSURE DROP

PVC POLY-VINYL-CHLORIDE

RC RAIN CONDUCTOR

RCP RADIANT CEILING PANEL

RD ROOF DRAIN

REQ'D REQUIRED

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RI ROUGH-IN

RLH RELIEF HOOD

RTU ROOF TOP UNIT

SAN SANITARY

SD SUPPLY DIFFUSER

SF SUPPLY FAN

SG SUPPLY GRILLE

SH SENSIBLE HEAT (MBH)

SHWR SHOWER

SK SINK

SM SHEET METAL

SP STAND PIPE

SQ. FT. SQUARE FEET

SS SERVICE SINK

SST SATURATED SUCTION TEMPERATURE

ST STORM

STR STRAINER

SV STACKED VENT

S&W STOP & WASTE

TC TOTAL COOLING (MBH)

TCL TEMPERATURE CONTROL

T&P TEMPERATURE & PRESSURE RELIEF

VALVE

TYP TYPICAL

UH UNIT HEATER

UR URINAL

VAV VARIABLE AIR VOLUME BOX

VB VACUUM BREAKER

V.F.D VARIABLE FREQUENCY DRIVE

VRH VARIABLE AIR VOLUME REHEAT BOX

VS VENT STACK

VTR VENT THRU ROOF

W WASTE

WB WET BULB

WC WATER CLOSET

WH WALL HYDRANT

WS WASTE STACK

W&V WASTE AND VENT

ZD ZONE DAMPER

X-SA EXISTING ITEM (EXISTING SUPPLY AIR

DUCT)

ITEM

EXISTING

X-CW EXIST. CW PIPING

ITEM

EXISTING

FLOW DIRECTION

PIPING DROP

PIPING RISE

INLINE PIPING DROP

INLINE PIPING RISE

PIPING TEE

PIPING ELBOW

THERMOMETER

PUMP

UNION

PIPE ANCHOR

PIPE GUIDE

BACK FLOW PREVENTER

PIPE CAP

PIPE BREAK

THERMOMETER WELL

THERMOSTAT

PROGRAMMABLE THERMOSTAT

THERMOSTAT (W/ NIGHT SETBACK)

ROOM SENSOR

HUMIDISTAT

PRESSURE GAUGE

DAMPER (ELECTRIC OPERATION)

DAMPER (PNEUMATIC OPERATION)

DAMPER BLADES

SUPPLY AIR DUCT

EXIST SUPPLY AIR DUCT

RETURN AIR DUCT

EXIST RETURN AIR DUCT

OUTSIDE AIR DUCT

EXIST OUTSIDE AIR DUCT

EXHAUST AIR DUCT

EXIST EXHAUST AIR DUCT

SUPPLY AIR DUCT RISER

RETURN AIR DUCT RISER

OUTSIDE AIR DUCT RISER (AS NOTED)

EXHAUST AIR DUCT

INSULATED DUCTWORK (AS NOTED)

DEMOLITION

POINT OF CONNECTION BETWEEN

NEW AND EXISTING

POINT OF EXISTING TO REMAIN AND

EXISTING TO BE REMOVED

INDICATES PLAN NOTE

INDICATES DEMOLITION NOTE

DETAIL BUBBLE

DETAIL NUMBER

PAGE LOCATION INDICATES

DIRECTION OF DETAIL SECTION

X

X

XX

XXXX

XX

XXXX

SA

OA

X-OA

X-EA

EA

X-SA

X-RA

RA

PLUMBING PIPING PLUMBING EQUIPMENT

1. ALL PLUMBING WORK SHALL CONFORM TO MICHIGAN PLUMBING

CODE, LATEST APPLICABLE EDITION.

2. ALL PIPE SIZES SHOWN ARE SERVICE SIZE. SIZE SLEEVES FOR 1"

CLEAR SPACE BETWEEN PIPE AND SLEEVE FOR INSTALLATION OF

MECHANICAL SEAL.

3. CONTRACTOR SHALL DEMOLISH & REMOVE EXISTING PIPING,

FITTINGS, & EQUIPMENT AS REQUIRED FOR NEW INSTALLATIONS.

VALVE & CAP PIPING TO REMAIN.

4. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY

CONFLICT WITH NEW CONSTRUCTION AND RELOCATE AS NEEDED.

5. NOTIFY OWNER OF ANY PIPING DEMOLITION THAT MAY AFFECT

NORMAL OPERATION OF OTHER AREAS.

6. PROVIDE AIR ELIMINATION DEVICES FOR EACH PLUMBING

SYSTEM.

7. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,

ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS THAT

MAY AFFECT THE WORK.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING

THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW"

CONDITION DURING CONSTRUCTION.

9. ALL WORK SHALL BE PERFORMED BY LICENSED CONTRACTORS

AND SUBCONTRACTORS AS REQUIRED BY LAW.

10. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH

THE CODES AND REGULATIONS ENFORCED BY LOCAL BUILDING

OFFICIALS.

11. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR

SPECIFICATIONS THE MORE STRINGENT AND GREATER COST ITEM

SHALL BE USED.

12. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF

TERMINATION OF PIPES AND SUGGESTED ROUTES. IT IS NOT

INTENTION OF DRAWINGS TO INDICATE ALL NECESSARY OFFSETS.

INSTALL WORK IN MANNER TO CONFORM TO STRUCTURE, AVOID

OBSTRUCTIONS, PRESERVE HEADROOM AND KEEP OPENINGS

AND PASSAGEWAYS CLEAR. DO NOT SCALE FROM DRAWINGS.

GENERAL PLUMBING NOTES

COLD WATER

COLD WATER BELOW FINISH SLAB

HOT WATER

HOT WATER BELOW FINISH SLAB

HOT WATER RETURN

HOT WATER RETURN BELOW FINISH SLAB

FIRE PROTECTION

GAS (NATURAL)

RAIN CONDUCTOR

STORM BELOW FINISH SLAB

OVERFLOW RAIN CONDUCTOR

OVERFLOW RAIN CONDUCTOR BELOW FINISH

SLAB

SANITARY WASTE

SANITARY WASTE BELOW FINISH SLAB

VENT PIPING

VENT PIPING BELOW FINISH SLAB

DEMOLITION

GATE VALVE

GAS COCK

CHECK VALVE

BALANCE COCK

CIRCUIT SETTER

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

GLOBE VALVE

BALL VALVE

BUTTERFLY VALVE

RELIEF VALVE

HOSE & DRAIN END VALVE

PRESSURE RELIEF VALVE

PRESSURE REDUCING VALVE

TRIPLE DUTY VALVE

GAS PRESSURE REGULATOR

STRAINER (BLOW-OFF)

FLOW DIRECTION

PIPING DROP

PIPING RISE

FLOOR CLEANOUT

INLINE PIPING DROP

INLINE PIPING RISE

PIPING TEE

PIPING ELBOW

INLINE CLEANOUT

PLUMBING TRAP

THERMOMETER

CONNECTION

PUMP

UNION

PIPE ANCHOR

PIPE GUIDE

FLOOR DRAIN & FLOOR SINK

BACK FLOW PREVENTER

FLANGE END CONNECTION

PIPE CAP

PIPE BREAK

WATER METER

PRESSURE GAUGE

PIPING FLEXIBLE CONNECTOR

SIGHT GLASS

CW

CW

HW

HW

HWR

HWR

FP

G

RC

ST

ORC

ORC

SAN

SAN

V

V

M

P

1. EXISTING EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATION OF EXISTING

DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING

STRUCTURE, EQUIPMENT FURNISHED, AND ALL OTHER TRADES PRIOR TO

DEMOLITION.

2. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,

AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,

CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES

HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.

3. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,

UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,

STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS. THESE

STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE

DRAWING AND SPECIFICATIONS.

4. COORDINATE CUTTING AND PATCHING WITH GENERAL CONTRACTOR.

5. ALL BOLD DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS NOTED BY

KEYNOTE. ALL OTHER EXISTING SYSTEMS SHOWN FOR REFERENCE ONLY.

6. PATCH AND REPAIR ALL FLOOR AND WALL SURFACES LEFT DAMAGED OR

INCOMPLETE FROM REMOVAL OF EXISTING PARTITIONS, MILLWORK,

CASEWORK, OR OTHER FIXED ACCESSORIES AND EQUIPMENT WITH

MATERIALS TO MATCH EXISTING.

7. NOTATIONS ARE MADE IN VARIOUS PLACES ON THE DRAWINGS TO CALL

ATTENTION TO DEMOLITION WHICH IS REQUIRED. HOWEVER, THESE

DRAWINGS ARE NOT INTENDED TO SHOW EACH AND EVERY ITEM TO BE

REMOVED. CONTRACTOR SHALL REMOVE ALL MATERIALS RELATED TO THEIR

RESPECTIVE TRADES AS REQUIRED TO PERMIT THE CONSTRUCTION OF THE

NEW WORK AS SHOWN.

8. THE GENERAL CONTRACTOR SHALL COORDINATE THE EXTENT OF THE

REQUIRED DEMOLITION OF THE EXISTING BUILDING AS REQUIRED TO

FACILITATE THE CONSTRUCTION OF THE PROJECT AS SHOWN AS PART OF

THIS WORK.

9. ALL DEMOLITION SHALL BE APPROVED BY THE OWNER/TENANT PRIOR TO

COMMENCEMENT AND SHALL BE PERFORMED UNDER REQUIREMENTS AND

APPROVAL OF THE LOCAL CODE JURISDICTIONS.

10. ASBESTOS ABATEMENT: CONTRACTOR SHALL NOTIFY BUILDING

REPRESENTATIVE IMMEDIATELY WHEN AND IF ANY ITEMS ARE ENCOUNTERED

THAT IN ANY WAY, SHAPE, OR FORM APPEAR TO BE HAZARDOUS OF NATURE.

ASBESTOS ABATEMENT IS NOT PART OF THE SCOPE OF THE DESIGN

PROFESSIONALS DOCUMENTATION OR RESPONSIBILITY TO SURVEY, IDENTIFY,

OR FOR CONSULTATION OF PROPER DISPOSAL.

11. PROTECT ALL EXISTING WORK WHICH IS TO REMAIN AND RESTORE IN AN

APPROVED MANNER ANY SUCH WORK WHICH BECOMES DAMAGED.

12. RUBBISH AND DEBRIS RESULTING FROM THE WORK SHALL BE REMOVED

IMMEDIATELY FROM THE SITE IN A SAFE AND LEGAL MANNER BY THE

CONTRACTOR.

13. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BUILDING

REPRESENTATIVE TO CLARIFY ANY ITEMS NOT SHOWN ON THESE

DOCUMENTS OR SHOWN NOT MATCHING FIELD CONDITIONS.

GENERAL DEMOLITION NOTES

PHASING NOTES

GENERAL INFORMATION:

A. EXISTING DOMESTIC WATER & HEATING HOT WATER SYSTEM SHALL

REMAIN ACTIVE AND FUNCTIONAL DURING OCCUPIED HOURS. ALL

SYSTEM SHUTDOWNS SHALL OCCUR BETWEEN THE HOURS OF 6:30

PM-4:00 AM AND SHALL BE IN OPERATION BY THE NEXT BUSINESS DAY.

CONTRACTOR SHALL COORDINATE WITH OWNER AND RECEIVE

WRITTEN APPROVAL OF SHUT DOWN AT A MINIMUM 1 WEEK BEFORE

REQUESTED DATE.

B. PHASING NOTES ARE INTENDED TO BE THE GENERAL SEQUENCE OF

CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MODIFY

AND CREATE A DETAILED PHASING PLAN TO SUCCESSFULLY COMPLETE

THE PROJECT WHILE MAINTAINING THE PROJECT REQUIREMENTS AS

LISTED IN THE CONSTRUCTION DOCUMENTS.

PHASE 1 - PLUMBING DEMOLITION & NEW

1.1. OPEN BY-PASS VALVE OF THE EXISTING DOMESTIC WATER SOFTENER

SYSTEM. DISCONNECT, REMOVE, AND DEMOLISH EXISTING WATER

SOFTENER SYSTEM. DEMOLISH TO EXTENTS SHOWN AND CAP PIPING.

1.2. DEMOLISH ABANDONED STORAGE TANK LOCATED IN PENTHOUSE.

1.3. COORDINATE WITH OWNER FOR DOMESTIC HOT WATER SYSTEM

SHUTDOWN. DEMOLISH COLD WATER, HOT WATER, AND HOT WATER

RETURN PIPING AS REQUIRED TO INSTALL SHUT OFF VALVES AND

FUTURE CONNECTIONS.

PHASE 2 - PLUMBING DEMOLITION & NEW

1.1. INSTALL NEW DOMESTIC WATER HEATERS, STORAGE TANKS, AND

ASSOCIATED PIPING. CONNECT NEW SYSTEM TO EXISTING DOMESTIC

WATER DISTRIBUTION SYSTEM. PERFORM DOMESTIC WATER HEATER

SYSTEM START UP AND VERIFY THAT THE NEW DOMESTIC HOT WATER

SYSTEM IS OPERATING PROPERLY.

1.2. INSTALL NEW DOMESTIC WATER BOOSTER HEATER NEAR EXISTING

DISHWASHER IN KITCHEN AND ASSOCIATED PIPING. PERFORM

BOOSTER HEATER START UP AND VERIFY THE SYSTEM IS OPERATING

PROPERLY.

1.3. PERFORM SYSTEM CHANGEOVER FROM EXISTING SYSTEM TO NEW

DOMESTIC WATER HEATER SYSTEM. VERIFY DOMESTIC WATER PLANT

IS OPERATING PROPERLY.

1.4. DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC HOT WATER

HEATERS, STORAGE TANKS, AND ASSOCIATED PIPING TO EXTENTS

SHOWN AND CAP.

1.5. DISCONNECT, REMOVE, AND DEMO EXISTING THERMOSTATIC MIXING

VALVE AS REQUIRED TO INSTALL NEW MIXING VALVE. INSTALL NEW

MIXING VALVE, AS SHOWN ON PHASE 3 NEW DRAWINGS, AND BRING

INTO OPERATION. DEMOLITION AND INSTALLATION OF NEW MIXING

VALVE SHALL OCCUR DURING ONE SHUT DOWN.

PHASE 3 - PLUMBING NEW

1.1. INSTALL NEW THERMOSTATIC MIXING VALVE. DEMOLITION AND

INSTALLATION OF NEW MIXING VALVE SHALL OCCUR DURING ONE SHUT

DOWN.

1.2. INSTALL NEW DOMESTIC WATER SOFTENER SYSTEM AND CONNECT TO

EXISTING COLD WATER PIPING. PERFORM DOMESTIC WATER SOFTENER

START UP AND VERIFY THAT THE NEW WATER SOFTENER SYSTEM IS

OPERATING PROPERLY. AFTER SUCCESSFUL EQUIPMENT START UP,

CLOSE DOMESTIC WATER BY-PASS VALVE.

M A

T R

X-BOILER-1

X-PUMP

X-PUMP

EXISTING ELECTRICAL

EXISTING ELECTRICAL

X-STORAGE TANK

(DOMESTIC AND

LAUNDRY)

X-DWH

(LAUNDRY)

X-STORAGE TANK

(KITCHEN)

X-DWH

(KITCHEN)

X-DWH

(BACKUP

KITCHEN)

DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING WATER

HEATER VENT UP THROUGH ROOF. PATCH AND SEAL ROOF

WATERTIGHT TO MATCH EXISTING.

DISCONNECT, REMOVE, AND DEMO EXISTING GAS PIPING

BACK TO MAIN AND CAP.

DISCONNECT, REMOVE, AND DEMO EXISTING BASE

MOUNTED PUMP AND ALL ASSOCIATED ACCESSORIES.

MODIFY EXISTING PIPING AS REQUIRED TO CONNECT TO

NEW PUMPS.

X-DWH

(DOMESTIC)

X-BOILER-1

X-AHU

X-STORAGE TANK

(ABANDONED)

GENERAL NOTES

1. REFER TO PHASING NOTES ON SHEET MP-100 FOR

PHASING / SYSTEM SHUT DOWN REQUIREMENTS.

2. CONTRACTOR IS RESPONSIBLE TO MAINTAIN

EXISTING ROOF WARRANTY. CONTACT ROOFING

INNOVATIONS PRIOR TO STARTING CONSTRUCTION,

PHONE NUMBER: (517)-482-2409.

X-6" V

X-6" V UP

THRU ROOF

X-6" V

X-6" V UP

THRU ROOF

X-6" V

X-6" V UP

THRU ROOF

X-6" V 1

X-2"

X-G

X-2" G DN TO

X-BOILER-2

X-2"

X-2" G DN TO

X-BOILER-2

X-4" X-4"

X- G

X- G

X-G

X-6" G UP

X-4"

X-3"

X-2"

X-1-1/2"

X-1-1/2"

X-2-1/2"X-2"

X-2"

X-1-1/2"

X-3"

X-2-1/2"

X-DWH-1

X-DWH-2

X-2"

X-G

X-2"

X-1-1/2"

X-1-1/2"

X-2"

X-3"

X-VALVE & CAP

FOR FUTURE

X-

HS

X-

HS

X-4" HS FROM

MECH. ROOM

X-4" HS TO

BUILDING

M-300

X-ST-1

X-XT-1

X-ST-2 X-ST-3

X-PUMP

PP

X-PUMP

PP

X-HS

X-HS

X-4" HS TO

BUILDING

X-4" HS FROM

BUILDING

X-4" X-4"

BASE MOUNTED PUMP DETAIL - PIPING

DEMOLITION

SCALE: NTS

X-INCREASER, TYP.

X-TRIPLE DUTY

VALVE, TYP.

X-FLEXIBLE

CONN., TYP.

X-PRESSURE

GAUGE, TYP.

X-BUTTERFLY

VALVE, TYP.

X-SUCTION

DIFFUSER, TYP.

X-4"

X-4"

AREA OF WORK

KEY PLAN

M A

T R

I X

N PARTIAL FLOOR PLAN - PHASE 2 - HVAC DEMOLITION

SCALE: 1/2" = 1'-0"

0 1 5

X-STORAGE TANK

(KITCHEN)

DWH-1

DWH-2

CLEARANCE, TYP.

6"ø V & 4"ø CA

6"ø V & 4"ø CA

6"ø V & 4"ø CA UP TO

CONCENTRIC VENT KIT

LOCATED ON ROOF

X-STORAGE TANK

(DOMESTIC AND

LAUNDRY)

X-DWH

(LAUNDRY)

X-DWH

(KITCHEN)

X-DWH

(BACKUP

KITCHEN)

X-DWH

(DOMESTIC)

X-6" V

X-6" V UP

THRU ROOF

X-6" V

X-6" V UP

THRU ROOF

X-6" V

X-6" V UP

THRU ROOF

X-BOILER-1 X-BOILER-1

X-2"

X-G

X-2" G DN TO

X-BOILER-2

X-2"

X-2" G DN TO

X-BOILER-2

X-4" X-4"

X- G

X- G

X-G

X-6" G UP

X-4"

X-3"

X-2"

X-1-1/2"

X-1-1/2"

X-2-1/2"X-2"

X-2"

X-1-1/2"

X-3"

X-2-1/2"

HVAC KEY NOTES

MODIFY EXISTING GAS PIPING AS REQUIRED TO CONNECT

TO NEW PIPING.

INSTALL NEW PUMP AND ASSOCIATED ACCESSORIES AT

LOCATION SHOWN. MODIFY EXISTING PIPING AS REQUIRED.

G

2"

1-1/2"

1-1/2" G DN

TO DWH-1

1-1/2" G DN

TO DWH-2

6"ø V & 4"ø CA UP TO

CONCENTRIC VENT KIT

LOCATED ON ROOF

1-1/2"

2"

X-AHU

X-STORAGE TANK

(ABANDONED)

3"

VALVE & CAP

FOR FUTURE

X-

HS

X-

HS

X-4" HS FROM

MECH. ROOM

X-4" HS TO

BUILDING

P-1

P-2

GENERAL NOTES

1. REFER TO PHASING NOTES ON SHEET MP-100 FOR

PHASING / SYSTEM SHUT DOWN REQUIREMENTS.

2. CONTRACTOR IS RESPONSIBLE TO MAINTAIN

EXISTING ROOF WARRANTY. CONTACT ROOFING

INNOVATIONS PRIOR TO STARTING CONSTRUCTION,

PHONE NUMBER: (517)-482-2409.

M-400

X-ST-1

X-XT-1

X-ST-2 X-ST-3

REDUCER (TYP.)

VFD

TO BAS

FLEXIBLE CONN. (TYP.)

TRIPLE DUTY VALVE (TYP.)

P-1

SUCTION DIFFUSER (TYP.)

PP

X-HS

X-HS

X-4" HS FROM

BUILDING

X-4" X-4"

1 BASE MOUNTED PUMP DETAIL - PIPING NEW

SCALE: NTS

VFD

TO BAS

COMPOUND GAUGE (TYP.)

P-2

STRAINER (TYP.)

BUTTERFLY VALVE (TYP.)

UNION (TYP.)

4" 4"

PRESSURE GAUGE (TYP.)

PP

X-4" HS TO

BUILDING

AREA OF WORK

KEY PLAN

M A

T R

I X

N PARTIAL FLOOR PLAN - PHASE 2 - HVAC NEW

X-PUMP

EXISTING ELECTRICAL

EXISTING ELECTRICAL

X-XT-3

X-STORAGE TANK

(DOMESTIC AND

LAUNDRY)

X-DWH

(LAUNDRY)

X-STORAGE TANK

(KITCHEN)

X-DWH

(KITCHEN)

X-DWH

(BACKUP

KITCHEN)

DEMOLITION NOTES

CONTRACTOR SHALL OPEN VALVE TO BYPASS EXISTING

WATER SOFTENERS.

DISCONNECT, REMOVE, AND DEMO EXISTING WATER

SOFTENERS, BRINE TANK, AND ALL ASSOCIATED

ACCESSORIES.

DISCONNECT, REMOVE, AND DEMO COLD WATER PIPING TO

EXTENTS SHOWN AND CAP.

DISCONNECT, REMOVE, AND DEMO COLD WATER PIPING TO

EXTENTS SHOWN. MODIFY EXISTING PIPING AS REQUIRED

TO INSTALL NEW SHUT OFF VALVE AND CAP AS SHOWN ON

NEW PHASE 1 DRAWINGS.

DISCONNECT, REMOVE, AND DEMO EXISTING HOT WATER

RETURN PIPING AS REQUIRED TO INSTALL NEW SHUT OFF

VALVE(S) AND CAP AS SHOWN ON NEW PHASE 1

DRAWINGS.

DISCONNECT, REMOVE, AND DEMO EXISTING HOT WATER

PIPING AS REQUIRED TO INSTALL NEW SHUT OFF VALVE(S)

AND CAP AS SHOWN ON THE NEW PHASE 1 DRAWINGS.

DISCONNECT, REMOVE, AND DEMO COLD WATER PIPING TO

EXTENTS SHOWN. MODIFY EXISTING COLD WATER PIPING

AS REQUIRED TO INSTALL NEW VALVES AS SHOWN ON THE

PHASE 1 NEW DRAWINGS.

DISCONNECT, REMOVE, AND DEMO EXISTING ABANDONED

STORAGE TANK. DEMO ASSOCIATED PIPING IN ITS

ENTIRETY.

X-WATER

SOFTENER

X-BRINE TANK

X-XT-4

X-DWH

(DOMESTIC)

X-XT-2 X-XT-1

X-BOILER-1

X-

CW

X-

HW

R

X-

HW

R X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F

X-HW (ABANDONED)

X-HW (140°F)

X-HW (180°F)

X-

HW

(1

°F

X-HW (180°F)

X-HW (140°F)

X-

HW

(1

°F

X-HW (140°F)

X-HWR

X-CW

X-

HW

(1

°F

X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F )X-

HW

R

X-

CW

X-

HW

X-

HW

X-2" HW

X-HW (180°F)

X-HW

X-HW

X-HW

X-HW

X-

HW

(1

°F

X-

HW

R

X-CP (TYP. 2)

X-

HW

X-

HW

X-HW

(140°F)

X-

HW

R

X-CW

X-HW

X-HW

X-

HW

X-

HW

X-

HW

X-2" HW

X-2" HW

X-2" HW

X-HWR

X-AHU

X-STORAGE TANK

(ABANDONED)

X-HW

X-HW

X-FIRE PROTECTION

RISER ASSEMBLY

X-FP PIPING TO

BUIDLING

X-6" CW DN

M

X-WATER METER

ASSEMBLY

X-

CW

X-3"

X-3"

X-CW

X-CW

X-2-1/2"

X-WATER

SOFTENER

X-CW

X-HW (110°F)

X-HW (110°F)

X-HWR

X-HWR

X-CW

X-CWX-HW (110°F)

X-HWR

X-HW (11

0°F

X-HWR

X-HWR

X-HWR

X-HW (11

0°F

X-HW

(ABANDONED)

X-1-1/2" HW (140°F)

X-1-1/2" HW (140°F)

X-1-1/4" HW (110°F)

X-2" HW (110°F)

X-CP

X-MIXING

VALVE

X-CW, HW, AND HWR

TO UNIT 'B'

X-SCW, HW, AND

HWR TO UNIT 'A'

X-HW AND HWR

TO/FROM LAUNDRY

X-CW FROM

BUILDING

X-HWR FROM

KITCHEN

X-1" HW (140°F &

180°F) TO KITCHEN

X-DRAIN DOWN TO

SERVICE SINK

X-HW DN FROM

PENTHOUSE

X-HW DN FROM

PENTHOUSE

X-HW

(ABANDONED)

X-HW

(ABANDONED)

X-HW DN TO

X-STORAGE TANK

X-1"

X-1"

X-1"

X-1"

X-1"

X-1"

X-1"

X-1"

X-3/4" X-2"

X-3/4" X-1-1/2"

X-1" X-3/4" X-1-1/2"

X-2" CW

X-2" X-1" X-1-1/2"

X-3/4"

X-2"

X-2"

X-1"

NCNC

X-2"

X-2"

X-1" X-2"

X-2"

X-2-1/2"

X-2-1/2"

X-3" X-1"

X-3"

X-2-1/2"

X-2" X-1-1/4"

X-3/4"

X-1-1/2"

X-2"

X-2"

X-2"

CW

NC

X-2-1/2" CW

X-2"

X-1" HWR

X-1"

X-1-1/4" HWR

X-2" X-2-1/2"

HW

X-3/4" X-2"

X-3"

X-2" X-3/4"

GENERAL NOTES

1. REFER TO PHASING NOTES ON SHEET MP-100 FOR

PHASING / SYSTEM SHUT DOWN REQUIREMENTS.

2. REFER TO SHEET P-800 FOR PHASE 1 DEMOLITION

PIPING DIAGRAM.

X-3"

X-3"

5 6

P-800

AREA OF WORK

KEY PLAN

M A

T R

I X

N PARTIAL FLOOR PLAN - PHASE 1 - PLUMBING DEMOLITION

X-PUMP

EXISTING ELECTRICAL

EXISTING ELECTRICAL

X-XT-3

X-STORAGE TANK

(DOMESTIC AND

LAUNDRY)

X-DWH

(LAUNDRY)

X-STORAGE TANK

(KITCHEN)

X-DWH

(KITCHEN)

X-DWH

(BACKUP

KITCHEN)

DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC

WATER HEATER AND ALL ASSOCIATED ACCESSORIES.

DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC

WATER STORAGE TANK AND ALL ASSOCIATED

ACCESSORIES.

DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC

WATER EXPANSION TANK IN ITS ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING HOT WATER

RETURN PIPING TO EXTENTS SHOWN AND CAP.

DISCONNECT, REMOVE, AND DEMO EXISTING COLD WATER

PIPING TO EXTENTS SHOWN AND CAP.

DISCONNECT, REMOVE, AND DEMO EXISTING HOT WATER

PIPING TO EXTENTS SHOWN AND CAP.

DISCONNECT, REMOVE, AND DEMO EXISTING

THERMOSTATIC MIXING VALVE. MODIFY EXISTING PIPING

AS REQUIRED TO CONNECT TO NEW MIXING VALVE. DEMO

EXISTING HOT WATER PIPING TO EXTENTS SHOWN.

X-XT-4

X-DWH

(DOMESTIC)

X-XT-2 X-XT-1

X-BOILER-1

X-

CW

X-

HW

R

X-

HW

R X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F

X-HW (ABANDONED)

X-HW (140°F)

X-HW (180°F)

X-

HW

(1

°F

X-HW (180°F)

X-HW (140°F)

X-

HW

(1

°F

X-HW (140°F)

X-HWR

X-CW

X-

HW

(1

°F

X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F )X-

HW

R

X-

CW

X-

HW

X-

HW

X-2" HW

X-HW (180°F)

X-HW

X-HW

X-HW

X-HW

X-

HW

(1

°F

X-

HW

R X-

HW

X-

HW

X-HW

(140°F)

X-

HW

R

X-CW

X-HW

X-HW

X-

HW

X-

HW

X-

HW

X-2" HW

X-2" HW

X-2" HW

X-HWR

X-AHU

X-HW

X-HW

X-FIRE PROTECTION

RISER ASSEMBLY

X-FP PIPING TO

BUIDLING

X-6" CW DN

M

X-WATER METER

ASSEMBLY

X-

CW

X-3"

X-3"

X-CW

X-CW

X-HW (110°F)

X-HW (110°F)

X-HWR

X-HWR

X-CW

X-CWX-HW (110°F)

X-HWR

X-HW (11

0°F

X-HWR

X-HWR

X-HWR

X-HW (11

0°F

X-HW

(ABANDONED)

X-1-1/2" HW (140°F)

X-1-1/2" HW (140°F)

X-1-1/4" HW (110°F)

X-2" HW (110°F)

X-CP

X-MIXING

VALVE

X-CW, HW, AND HWR

TO UNIT 'B'

X-SCW, HW, AND

HWR TO UNIT 'A'

X-HW AND HWR

TO/FROM LAUNDRY

X-CW FROM

BUILDING

X-HWR FROM

KITCHEN

X-1" HW (140°F &

180°F) TO KITCHEN

X-DRAIN DOWN TO

SERVICE SINK

X-HW DN FROM

PENTHOUSE

X-HW DN FROM

PENTHOUSE

X-1"

X-1"

X-1"

X-1"

X-1"

X-1"

X-1"

X-1"

X-3/4" X-2"

X-3/4" X-1-1/2"

X-1" X-3/4" X-1-1/2"

X-2" CW

X-2" X-1" X-1-1/2"

X-3/4"

X-2"

X-2"

X-1"

NCNC

X-2"

X-2"

X-1" X-2"

X-2"

X-3" X-1"

X-3"

X-2-1/2"

X-2" X-1-1/4"

X-3/4"

X-1-1/2"

X-2"

X-2"

X-2"

CW

NC

X-2-1/2" CW

X-2"

X-1" HWR

X-1"

X-1-1/4" HWR

X-2-1/2"

HW

X-3/4" X-2"

X-3"

X-2" X-3/4"

X-3"

X-3"

X-DWH-1

X-DWH-2

X-ST-1

GENERAL NOTES

1. REFER TO PHASING NOTES ON SHEET MP-100 FOR

PHASING / SYSTEM SHUT DOWN REQUIREMENTS.

2. REFER TO SHEET P-803 FOR PHASE 2 DEMOLITION

PIPING DIAGRAM.

X-XT-1

X-3" CW

X-3" CW

X-1" HW

X-1" HW

X-1" HW

X-3/4"

HWR

X-

HW

(1

°F

X-

HW

X-

HW

R

X-HW (140°F)

X-HW

X-HWR

X-HW (140°F)

X-HW

X-HWR

X-HW

X-HWR

X-HW (140°F)

X-3" HW

(140°F)

X-1" HW (140°F)

X-2" HW & HWR

DN TO X-ST-3

X-2" HW & HWR

DN TO X-ST-2

X-2" HW & HWR

DN TO X-ST-2

X-4"

X-2" X-4"

X-4" X-2"

X-2" X-3"

X-2-1/2"X-2-1/2"

X-4"

X-1"

X-3/4"

X-3/4"

X-4" X-2"

X-3/4" HWR

X-1" HWR1-1/2" HWR

X-CP-1

X-HWR

X-3/4"

X-1-1/2" HWR

X-4" X-2"

X-4" X-2"

X-2" HW (140°F)

X-4" HW

X-4" HWR

X-HW X-HWR X-HWR

X-4"

X-1-1/2"

X-2-1/2" HW

& HWR DN

TO DWH-1

X-2-1/2" HW

& HWR DN

TO DWH-2

X-2" HW

(140°F)

X-2" HW

(140°F)

X-2" HW (140°F)

X-3" CW

X-1-1/2" HWR

X-1-1/2"

HWR

X-CP

(TYP. 2)

X-ST-2 X-ST-3

3 3

P-803

X-DISHWASHER

X-

HW

(1

°F

X-1"

X-1" HW (180°F)

FROM BUILDING

X-3/4"

X-FS

X-FD

X-DBWH-1

X-

HW

X-

HW

X-3/4"

X-3/4" HW

DN TO

X-DWBH-1

AREA OF WORK

KEY PLAN

M A

T R

I X

N PARTIAL FLOOR PLAN - PHASE 2 - PLUMBING DEMOLITION

SCALE: 1/2" = 1'-0"

0 1 5

N PARTIAL KITCHEN FLOOR PLAN - PHASE 2 - PLUMBING DEMOLITION

X-PUMP

EXISTING ELECTRICAL

EXISTING ELECTRICAL

X-XT-3

X-STORAGE TANK

(DOMESTIC AND

LAUNDRY)

X-DWH

(LAUNDRY)

X-STORAGE TANK

(KITCHEN)

X-DWH

(KITCHEN)

X-DWH

(BACKUP

KITCHEN)

X-XT-4

X-DWH

(DOMESTIC)

X-XT-2 X-XT-1

X-BOILER-1

X-

CW

X-

HW

R

X-

HW

R X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F

X-HW (ABANDONED)

X-HW (140°F)

X-HW (180°F)

X-

HW

(1

°F

X-HW (180°F)

X-HW (140°F)

X-

HW

(1

°F

X-HW (140°F)

X-HWR

X-CW

X-

HW

(1

°F

X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F )X-

HW

R

X-

CW

X-

HW

X-

HW

X-2" HW

X-HW (180°F)

X-HW

X-HW

X-HW

X-HW

X-

HW

(1

°F

X-

HW

R X-

HW

X-

HW

X-HW

(140°F)

X-

HW

R

X-CW

X-HW

X-HW

X-

HW

X-

HW

X-

HW

X-2" HW

X-2" HW

X-2" HW

X-HWR

X-AHU

X-HW

X-HW

X-FIRE PROTECTION

RISER ASSEMBLY

X-FP PIPING TO

BUIDLING

X-6" CW DN

M

X-WATER METER

ASSEMBLY

X-

CW

X-3"

X-3"

X-CW

X-CW

X-HW (110°F)

X-HW (110°F)

X-HWR

X-HWR

X-CW

X-CWX-HW (110°F)

X-HWR

X-HW (11

0°F

X-HWR

X-HWR

X-HWR

X-HW (11

0°F

X-HW

(ABANDONED)

X-1-1/2" HW (140°F)

X-1-1/2" HW (140°F)

X-1-1/4" HW (110°F)

X-2" HW (110°F)

X-CP

X-MIXING

VALVE

X-CW, HW, AND HWR

TO UNIT 'B'

X-SCW, HW, AND

HWR TO UNIT 'A'

X-HW AND HWR

TO/FROM LAUNDRY

X-CW FROM

BUILDING

X-HWR FROM

KITCHEN

X-1" HW (140°F &

180°F) TO KITCHEN

X-DRAIN DOWN TO

SERVICE SINK

X-HW DN FROM

PENTHOUSE

X-HW DN FROM

PENTHOUSE

X-1"

X-1"

X-1"

X-1"

X-1"

X-1"

X-1"

X-1"

X-3/4" X-2"

X-3/4" X-1-1/2"

X-1" X-3/4" X-1-1/2"

X-2" CW

X-2" X-1" X-1-1/2"

X-3/4"

X-2"

X-2"

X-1"

NCNC

X-2"

X-2"

X-1" X-2"

X-2"

X-3" X-1"

X-3"

X-2-1/2"

X-2" X-1-1/4"

X-3/4"

X-1-1/2"

X-2"

X-2"

X-2"

CW

NC

X-2-1/2" CW

X-2"

X-1" HWR

X-1"

X-1-1/4" HWR

X-2" X-2-1/2"

HW

X-3/4" X-2"

X-3"

X-2" X-3/4"

X-3"

X-3"

PLUMBING KEY NOTES

MODIFY EXISTING HOT WATER RETURN PIPING AS

REQUIRED TO INSTALL NEW SHUT OFF VALVE AND FUTURE

CONNECTION. INSTALL SHUT OFF VALVE FOR FUTURE

CONNECTION AND CAP.

MODIFY EXISTING HOT WATER PIPING AS REQUIRED TO

INSTALL NEW SHUT OFF VALVE AND FUTURE CONNECTION.

INSTALL SHUT OFF VALVE FOR FUTURE CONNECTION AND

CAP.

MODIFY EXISTING COLD WATER PIPING AS REQUIRED TO

INSTALL NEW SHUT OFF VALVE(S). INSTALL SHUT OFF

VALVE(S) FOR FUTURE CONNECTION AND CAP.

MODIFY EXISTING HOT WATER RETURN PIPING AS

REQUIRED TO INSTALL NEW SHUT OFF VALVE AND FUTURE

CONNECTION. INSTALL SHUT OFF VALVE FOR FUTURE

CONNECTION AND CAP.

GENERAL NOTES

1. REFER TO PHASING NOTES ON SHEET MP-100 FOR

PHASING / SYSTEM SHUT DOWN REQUIREMENTS.

2. REFER TO SHEET P-801 FOR PHASE 1 NEW PIPING

DIAGRAM.

3" CW

1-1/2"

HW

VALVE AND CAP

FOR FUTURE, TYP.

3" CW

3" CW VALVE AND

CAP FOR FUTURE

1" HW

2 1" HW VALVE AND

CAP FOR FUTURE,

TYP. 2

1" HW

3/4" HWR

3/4" HWR VALVE AND CAP

FOR FUTURE, TYP. 2

X-CP (TYP. 2)

P-801

AREA OF WORK

KEY PLAN

M A

T R

I X

N PARTIAL FLOOR PLAN - PHASE 1 - PLUMBING NEW

X-PUMP

EXISTING ELECTRICAL

EXISTING ELECTRICAL

X-XT-3

X-STORAGE TANK

(DOMESTIC AND

LAUNDRY)

X-DWH

(LAUNDRY)

X-STORAGE TANK

(KITCHEN)

X-DWH

(KITCHEN)

X-DWH

(BACKUP

KITCHEN)

X-XT-4

X-DWH

(DOMESTIC)

X-XT-2 X-XT-1

X-BOILER-1

X-

CW

X-

HW

R

X-

HW

R X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F

X-HW (ABANDONED)

X-HW (140°F)

X-HW (180°F)

X-

HW

(1

°F

X-HW (180°F)

X-HW (140°F)

X-

HW

(1

°F

X-HW (140°F)

X-HWR

X-CW

X-

HW

(1

°F

X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F )X-

HW

R

X-

CW

X-

HW

X-

HW

X-2" HW

X-HW (180°F)

X-HW

X-HW

X-HW

X-HW

X-

HW

(1

°F

X-

HW

R X-

HW

X-

HW

X-HW

(140°F)

X-

HW

R

X-CW

X-HW

X-HW

X-

HW

X-

HW

X-

HW

X-2" HW

X-2" HW

X-2" HW

X-HWR

X-AHU

X-HW

X-HW

X-FIRE PROTECTION

RISER ASSEMBLY

X-FP PIPING TO

BUIDLING

X-6" CW DN

M

X-WATER METER

ASSEMBLY

X-

CW

X-3"

X-3"

X-CW

X-CW

X-HW (110°F)

X-HW (110°F)

X-HWR

X-HWR

X-CW

X-CWX-HW (110°F)

X-HWR

X-HW (11

0°F

X-HWR

X-HWR

X-HWR

X-HW (11

0°F

X-HW

(ABANDONED)

X-1-1/2" HW (140°F)

X-1-1/2" HW (140°F)

X-1-1/4" HW (110°F)

X-2" HW (110°F)

X-CP

X-MIXING

VALVE

X-CW, HW, AND HWR

TO UNIT 'B'

X-SCW, HW, AND

HWR TO UNIT 'A'

X-HW AND HWR

TO/FROM LAUNDRY

X-CW FROM

BUILDING

X-HWR FROM

KITCHEN

X-1" HW (140°F &

180°F) TO KITCHEN

X-DRAIN DOWN TO

SERVICE SINK

X-HW DN FROM

PENTHOUSE

X-HW DN FROM

PENTHOUSE

X-1"

X-1"

X-1"

X-1"

X-1"

X-1"

X-1"

X-1"

X-3/4" X-2"

X-3/4" X-1-1/2"

X-1" X-3/4" X-1-1/2"

X-2" CW

X-2" X-1" X-1-1/2"

X-3/4"

X-2"

X-2"

X-1"

NCNC

X-2"

X-2"

X-1" X-2"

X-2"

X-3" X-1"

X-3"

X-2-1/2"

X-2" X-1-1/4"

X-3/4"

X-1-1/2"

X-2"

X-2"

X-2"

CW

NC

X-2-1/2" CW

X-2"

X-1" HWR

X-1"

X-1-1/4" HWR

X-2" X-2-1/2"

HW

X-3/4" X-2"

X-3"

X-2" X-3/4"

X-3"

X-3"

PLUMBING KEY NOTES

2" HOT WATER (140°F) DOWN TO STORAGE TANK.

MODIFY EXISTING HOT WATER PIPING AS REQUIRED TO

CONNECT TO NEW PIPING.

MODIFY EXISTING HOT WATER RETURN PIPING AS

REQUIRED TO CONNECT TO NEW PIPING.

MODIFY EXISTING COLD WATER PIPING AS REQUIRED TO

CONNECT TO NEW PIPING.

INSTALL NEW DOMESTIC WATER BOOSTER HEATER UNDER

EXISTING KITCHEN COUNTERTOP AT LOCATION SHOWN.

MODIFY EXISTING HOT WATER PIPING AS REQUIRED.

INTERLOCK BOOSTER HEATER WITH EXISTING

DISHWASHER OPERATION. EXTEND T&P RELIEF VALVE TO

NEAREST FLOOR SINK.

INSTALL NEW HOT WATER PIPING BELOW DISHWASHER &

EXISTING KITCHEN COUNTERTOP.

2DWH-1

DWH-2

ST-1 ST-2 ST-3

GENERAL NOTES

1. REFER TO PHASING NOTES ON SHEET MP-100 FOR

PHASING / SYSTEM SHUT DOWN REQUIREMENTS.

2. REFER TO SHEET P-802 FOR PHASE 2 NEW PIPING

DIAGRAM.

XT-1

X-3" CW

X-3" CW

X-1" HW

X-1" HW

X-1" HW

X-3/4"

HWR

HW

(1

°F

HW

HW

R

HW (140°F)

HW

HWR

HW (140°F)

HW

HWR

HW

HWR

HW (140°F)

3" HW (140°F)

1" HW (140°F)

2" HW & HWR

DN TO ST-3

2" HW & HWR

DN TO ST-2

2" HW & HWR

DN TO ST-1

4"

2" 4"

4" 2"

1 1 12" 3"

2-1/2"2-1/2"

4"

1"

3/4"

3/4"

4" 2"

3/4" HWR

1" HWR1-1/2" HWR

CP-1

HWR

3/4"

1-1/2" HWR

4" 2"

4" 2"

2" HW (140°F)

4" HW

4" HWR

HW

HWR HWR

4"

1-1/2"

2-1/2" HW

& HWR DN

TO DWH-1

2-1/2" HW

& HWR DN

TO DWH-2

2" HW

(140°F)

2" HW

(140°F)

2" HW (140°F)

3" CW

1-1/2" HWR

1-1/2"

HWR

X-CP

(TYP. 2)

P-802

3" CW

X-DISHWASHER

X-

HW

(1

°F

X-1"

X-1" HW (180°F)

FROM BUILDING

X-3/4"

X-FS

X-FD

DBWH-1 5

HW

HW

3/4" 6

3/4" HW DN

TO DWBH-1

AREA OF WORK

KEY PLAN

M A

T R

I X

N PARTIAL FLOOR PLAN - PHASE 2 - PLUMBING NEW

SCALE: 1/2" = 1'-0"

0 1 5

N PARTIAL KITCHEN FLOOR PLAN - PHASE 2 - PLUMBING NEW

X-PUMP

EXISTING ELECTRICAL

EXISTING ELECTRICAL

X-BOILER-1

X-

HW

R

X-

HW

R X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F

X-

HW

(1

°F

X-AHU

X-HW

X-HW

X-FIRE PROTECTION

RISER ASSEMBLY

X-FP PIPING TO

BUIDLING

X-6" CW DN

M

X-WATER METER

ASSEMBLY

X-

CW

X-3"

X-3"

X-CW

X-CW

X-HW (110°F)

X-HW (110°F)

X-HWR

X-HWR

X-CW

X-CWX-HW (110°F)

X-HWR

X-HW (11

0°F

X-HWR

X-HWR

X-HWR

X-HW (11

0°F

X-HW

(ABANDONED)

X-1-1/2" HW (140°F)

X-2" HW (110°F)

X-CP

X-CW, HW, AND HWR

TO UNIT 'B'

X-SCW, HW, AND

HWR TO UNIT 'A'

X-HW AND HWR

TO/FROM LAUNDRY

X-CW FROM

BUILDING

X-HWR FROM

KITCHEN

X-1" HW (140°F &

180°F) TO KITCHEN

X-DRAIN DOWN TO

SERVICE SINK

X-HW DN FROM

PENTHOUSE

X-HW DN FROM

PENTHOUSE

X-1"

X-3/4" X-3/4" X-1-1/2"

X-3"

X-3"

X-2-1/2"

X-2" X-1-1/4"

X-3/4"

X-1-1/2"

X-2"

X-2"

NC

X-2-1/2" CW

X-1-1/4" HWR

X-2-1/2"

HW

X-3/4" X-2"

X-3"

X-2" X-3/4"

X-3"

X-3"

X-DWH-1

X-DWH-2

X-ST-1

X-XT-1

X-3" CW

X-3" CW

X-1" HW

X-1" HW

X-1" HW

X-3/4"

HWR

X-

HW

(1

°F

X-

HW

X-

HW

R

X-HW (140°F)

X-HW

X-HWR

X-HW (140°F)

X-HW

X-HWR

X-HW

X-HWR

X-HW (140°F)

X-3" HW

(140°F)

X-1" HW (140°F)

X-2" HW & HWR

DN TO X-ST-3

X-2" HW & HWR

DN TO X-ST-2

X-2" HW & HWR

DN TO X-ST-2

X-4"

X-2" X-4"

X-4" X-2"

X-2" X-3"

X-2-1/2"X-2-1/2"

X-4"

X-1"

X-3/4"

X-3/4"

X-4" X-2"

X-3/4" HWR

X-1" HWR1-1/2" HWR

X-CP-1

X-HWR

X-3/4"

X-1-1/2" HWR

X-4" X-2"

X-4" X-2"

X-2" HW (140°F)

X-4" HW

X-4" HWR

X-HW X-HWR X-HWR

X-4"

X-1-1/2"

X-2-1/2" HW

& HWR DN

TO DWH-1

X-2-1/2" HW

& HWR DN

TO DWH-2

X-2" HW

(140°F)

X-2" HW

(140°F)X-3" CW

X-1-1/2" HWR

X-1-1/2"

HWR

X-CP

(TYP. 2)

X-ST-2 X-ST-3

X-2" HW (140°F)

WS-1

WS-1

BRINE TANK

CW

CW

3"

CW CW

3"

2" CW

3" CW

2" CW DN

TO WS-1

2" CW DN

TO WS-1

3"

PLUMBING KEY NOTES

INSTALL NEW WATER SOFTENER SYSTEM AT LOCATION

SHOWN. MODIFY EXISTING COLD WATER PIPING AS

REQUIRED.

INSTALL NEW DIGITAL THERMOSTATIC MIXING VALVE AT

LOCATION SHOWN. MODIFY EXISTING PIPING AS REQUIRED.

GENERAL NOTES

1. REFER TO PHASING NOTES ON SHEET MP-100 FOR

PHASING / SYSTEM SHUT DOWN REQUIREMENTS.

2. REFER TO SHEET P-804 FOR PHASE 3 NEW PIPING

DIAGRAM.

P-804

TMV-12

2" HW (110°F)

AREA OF WORK

KEY PLAN

M A

T R

I X

N PARTIAL FLOOR PLAN - PHASE 3 - PLUMBING NEW

X-MIXING

VALVE

X-STORAGE TANK

(DOMESTIC AND

LAUNDRY)

X-DWH

(LAUNDRY)

X-STORAGE TANK

(KITCHEN)

X-DWH

(KITCHEN)

X-DWH

(BACKUP

KITCHEN)

X-DWH

(DOMESTIC)

X-XT-1 X-XT-2 X-XT-3 X-XT-4

X-

HW

(1

°F

X-CW

X-HW

X-HWR

X-HWR

X-CW

X-HWR

X-

CW

X-HW

X-HW

X-2" HW

X-T&P RELIEF

VALVE, TYP.

X-SHUT OFF

VALVE, TYP.

NC NC

X-2"

X-CHECK

VALVE, TYP.

X-UNION, TYP.

X-

HW

X-

HW

X-

HW

X-

HW

NC

X-HW

X-HW

X-2"

X-2"

X-HW

X-2"

X-2"

THERMOMETER, TYP.

X-HW (180°F)

X-PUMP, TYP.

X-HW

X-HW

X-HWR X-HWR

X-HWR

X-HWR

X-HWR

X-HW

X-HW

X-HW

X-

HW

X-T&P RELIEF

VALVE, TYP.

X-SHUT OFF

VALVE, TYP.

X-2"

X-PUMP, TYP.

X-

HW

R X-

HW

X-2" HW

X-

HW

X-2" X-2"

X-2"

X-2"X-2"

X-1" X-1"

X-1"X-3/4"

X-1"X-1"

X-2"

X-2" X-1" X-

HW

NC

X-HW

X-HW

X-

HW

NC

X-

HW

X-

HW

X-

HW

X-

CW

X-2" HW

X-1" X-1"

X-1"

X-HW (140°F)

X-1" X-1"

X-HW (140°F)

X-1-1/2"

X-HW (140°F)

X-1"

X-HW (140°F)

X-1-1/2"

X-1"

X-1-1/2"

X-HW (140°F)

X-

HW

(1

°F

X-1"

X-1"

NC

X-HW (140°F)

X-HW

(ABANDONED)

X-1"

X-

HW

(1

°F

X-1-1/2"

X-2"

X-1"

X-1-1/2"

X-1"

X-HW (140°F)

X-HW (110°F)

X-HWR

X-

HW

(1

°F

X-

HW

X-

HW

(1

°F

X-

CW

X-HW

X-CW

X-HW

X-HW

X-HW

X-

HW

X-

CW

X-

HW

R

X-

HW

R

X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F

X-CW

X-CW

NC

X-3" CW TO

UNIT 'A' AND

UNIT 'B'

X-HW TO/FROM

X-STORAGE TANK

(ABANDONED)

X-3/4" HWR

FROM UNIT 'A'

AND UNIT 'B'

X-2" HW (110°F)

TO UNIT 'A' AND

UNIT 'B'

X-3" CW FROM

BUILDING

X-3"

X-2-1/2"

X-2-1/2"

X-3" CW

X-2"

X-1-1/4"

X-3/4"

X-2"

X-CHECK VALVE (TYP.)

X-BUTTERFLY

VALVE (TYP.)

X-1-1/4"

X-1-1/4"

X-1-1/4"

X-2-1/2"

X-2"

X-2-1/2"X-2"

X-2"

X-1"

X-2"

X-2"

X-2"

X-CP

X-CIRCUIT

SETTER (TYP.)

X-1-1/4"

X-2"

X-2"

X-CP (TYP.)

X-CIRCUIT

SETTER (TYP.)

X-HW (140°F &

180°F) TO

KITCHEN

X-HW (140°F)

TO LAUNDRY

X-HWR FROM

KITCHEN

X-HWR FROM

LAUNDRY

X-SCW FROM

BUILDING

X-CONCRETE

PAD (TYP.)

X-FLOOR

X-CW

X-WATER

SOFTENER

X-BRINE TANK

X-WATER

SOFTENER

X-1" CW TO X-AIR

SEPARATOR

X-1" CW

X-3"

X-CW

X-CW

X-2-1/2" X-2-1/2"

X-

CW

X-

CW

X-

CW

X-

CW

X-3"

X-2-1/2"

X-BYPASS

VALVE

X-CW

X-

CW

X-3"

X-3"

X-FLOOR

2 2

X-1-1/2"

X-1-1/2"

DEMOLITION NOTES

CONTRACTOR SHALL OPEN VALVE TO BYPASS EXISTING

WATER SOFTENERS.

DISCONNECT, REMOVE, AND DEMO EXISTING WATER

SOFTENERS, BRINE TANK, AND ALL ASSOCIATED

ACCESSORIES.

DISCONNECT, REMOVE, AND DEMO COLD WATER PIPING TO

EXTENTS SHOWN AND CAP.

DISCONNECT, REMOVE, AND DEMO COLD WATER PIPING TO

EXTENTS SHOWN. MODIFY EXISTING PIPING AS REQUIRED

TO INSTALL NEW SHUT OFF VALVE AND CAP AS SHOWN ON

NEW PHASE 1 DRAWINGS.

DISCONNECT, REMOVE, AND DEMO EXISTING HOT WATER

RETURN PIPING AS REQUIRED TO INSTALL NEW SHUT OFF

VALVE(S) AND CAP AS SHOWN ON NEW PHASE 1

DRAWINGS.

DISCONNECT, REMOVE, AND DEMO EXISTING HOT WATER

PIPING AS REQUIRED TO INSTALL NEW SHUT OFF VALVE(S)

AND CAP AS SHOWN ON THE NEW PHASE 1 DRAWINGS.

DISCONNECT, REMOVE, AND DEMO COLD WATER PIPING TO

EXTENTS SHOWN. MODIFY EXISTING COLD WATER PIPING

AS REQUIRED TO INSTALL NEW VALVES AS SHOWN ON THE

PHASE 1 NEW DRAWINGS.

GENERAL NOTES

1. REFER TO PHASING NOTES ON SHEET MP-100 FOR

PHASING / SYSTEM SHUT DOWN REQUIREMENTS.

M A

T R

I X

1 PIPING DIAGRAM - PHASE 1 DEMOLITION

SCALE: NTS

X-STORAGE TANK

(DOMESTIC AND

LAUNDRY)

X-DWH

(LAUNDRY)

X-STORAGE TANK

(KITCHEN)

X-DWH

(KITCHEN)

X-DWH

(BACKUP

KITCHEN)

X-DWH

(DOMESTIC)

X-XT-1 X-XT-2 X-XT-3 X-XT-4

X-

HW

(1

°F

X-CW

X-HW

X-HWR

X-HWR

X-CW

X-HWR

X-

CW

X-HW

X-HW

X-2" HW

X-T&P RELIEF

VALVE, TYP.

X-SHUT OFF

VALVE, TYP.

NC NC

X-2"

X-CHECK

VALVE, TYP.

X-UNION, TYP.

X-

HW

X-

HW

X-

HW

X-

HW

NC

X-HW

X-HW

X-2"

X-2"

X-HW

X-2"

X-2"

THERMOMETER, TYP.

X-HW (180°F)

X-PUMP, TYP.

X-HW

X-HW

X-HWR X-HWR

X-HWR

X-HWR

X-HWR

X-HW

X-HW

X-HW

X-

HW

X-T&P RELIEF

VALVE, TYP.

X-SHUT OFF

VALVE, TYP.

X-2"

X-PUMP, TYP.

X-

HW

R X-

HW

X-2" HW

X-

HW

X-2" X-2"

X-2"

X-2"X-2"

X-1" X-1"

X-1"X-3/4"

X-1"X-1"

X-2"

X-2" X-1" X-

HW

NC

X-HW

X-HW

X-

HW

NC

X-

HW

X-

HW

X-

HW

X-

CW

X-2" HW

X-1" X-1"

X-1"

X-HW (140°F)

X-1" X-1"

X-HW (140°F)

X-1-1/2"

X-HW (140°F)

X-1"

X-HW (140°F)

X-1-1/2"

X-1"

X-1-1/2"

X-HW (140°F)

X-

HW

(1

°F

X-1"

X-1"

NC

X-HW (140°F)

X-HW

(ABANDONED)

X-1"

X-

HW

(1

°F

X-1-1/2"

X-2"

X-1"

X-1-1/2"

X-1"

X-HW (140°F)

X-HW (110°F)

X-HWR

X-

HW

(1

°F

X-

HW

X-

HW

(1

°F

X-

CW

X-HW

X-CW

X-HW

X-HW

X-HW

X-

HW

X-

CW

X-

HW

R

X-

HW

R

X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F

X-CW

X-CW

NC

X-3" CW TO

UNIT 'A' AND

UNIT 'B'

X-HW TO/FROM

X-STORAGE TANK

(ABANDONED)

X-3/4" HWR

FROM UNIT 'A'

AND UNIT 'B'

X-2" HW (110°F)

TO UNIT 'A' AND

UNIT 'B'

X-3" CW FROM

BUILDING

X-3"

X-2-1/2"

X-2-1/2"

X-3" CW

X-2"

X-1-1/4"

X-3/4"

X-2"

X-CHECK VALVE (TYP.)

X-BUTTERFLY

VALVE (TYP.)

X-1-1/4"

X-1-1/4"

X-1-1/4"

X-2-1/2"

X-2"

X-2-1/2"X-2"

X-2"

X-1"

X-2"

X-2"

X-2"

X-CP

X-CIRCUIT

SETTER (TYP.)

X-1-1/4"

X-2"

X-2"

X-CP (TYP.)

X-CIRCUIT

SETTER (TYP.)

X-HW (140°F &

180°F) TO

KITCHEN

X-HW (140°F)

TO LAUNDRY

X-HWR FROM

KITCHEN

X-HWR FROM

LAUNDRY

X-SCW FROM

BUILDING

X-CONCRETE

PAD (TYP.)

X-FLOOR

X-CW

X-1" CW TO X-AIR

SEPARATOR

X-1" CW

X-3"

X-CW

X-3"

X-CW

X-

CW

X-3"

X-3"

X-FLOOR

X-1-1/2"

X-1-1/2"

GLOBE

VALVE 1-1/2"

HWR

3" CW

1" HW

1" HW VALVE AND CAP

FOR FUTURE, TYP. 2

VALVE AND CAP

FOR FUTURE

3" CW

VALVE AND CAP

FOR FUTURE

1 1

VALVE AND CAP

FOR FUTURE

1-1/2" HW

VALVE AND CAP

FOR FUTURE

VALVE AND CAP FOR

FUTURE

3/4" HWR

3/4" HWR

1-1/2" HW

VALVE AND CAP FOR

FUTURE, TYP. 3

PLUMBING KEY NOTES

MODIFY EXISTING HOT WATER RETURN PIPING AS

REQUIRED TO INSTALL NEW SHUT OFF VALVE AND FUTURE

CONNECTION. INSTALL SHUT OFF VALVE FOR FUTURE

CONNECTION AND CAP.

MODIFY EXISTING HOT WATER PIPING AS REQUIRED TO

INSTALL NEW SHUT OFF VALVE AND FUTURE CONNECTION.

INSTALL SHUT OFF VALVE FOR FUTURE CONNECTION AND

CAP.

MODIFY EXISTING COLD WATER PIPING AS REQUIRED TO

INSTALL NEW SHUT OFF VALVE(S). INSTALL SHUT OFF

VALVE(S) FOR FUTURE CONNECTION AND CAP.

GENERAL NOTES

1. REFER TO PHASING NOTES ON SHEET MP-100 FOR

PHASING / SYSTEM SHUT DOWN REQUIREMENTS.

M A

T R

I X

1 PIPING DIAGRAM - PHASE 1 NEW

X-STORAGE TANK

(DOMESTIC AND

LAUNDRY)

X-DWH

(LAUNDRY)

X-STORAGE TANK

(KITCHEN)

X-DWH

(KITCHEN)

X-DWH

(BACKUP

KITCHEN)

X-DWH

(DOMESTIC)

X-XT-1 X-XT-2 X-XT-3 X-XT-4

X-

HW

(1

°F

X-CW

X-HW

X-HWR

X-HWR

X-CW

X-HWR

X-

CW

X-HW

X-HW

X-2" HW

X-T&P RELIEF

VALVE, TYP.

X-SHUT OFF

VALVE, TYP.

NC NC

X-2"

X-CHECK

VALVE, TYP.

X-UNION, TYP.

X-

HW

X-

HW

X-

HW

X-

HW

NC

X-HW

X-HW

X-2"

X-2"

X-HW

X-2"

X-2"

THERMOMETER, TYP.

X-HW (180°F)

X-PUMP, TYP.

X-HW

X-HW

X-HWR X-HWR

X-HWR

X-HWR

X-HWR

X-HW

X-HW

X-HW

X-

HW

X-T&P RELIEF

VALVE, TYP.

X-SHUT OFF

VALVE, TYP.

X-2"

X-PUMP, TYP.

X-

HW

R X-

HW

X-2" HW

X-

HW

X-2" X-2"

X-2"

X-2"X-2"

X-1" X-1"

X-1"X-3/4"

X-1"X-1"

X-2"

X-2" X-1" X-

HW

NC

X-HW

X-HW

X-

HW

NC

X-

HW

X-

HW

X-

HW

X-

CW

X-2" HW

X-1" X-1"

X-1"

X-HW (140°F)

X-1" X-1"

X-HW (140°F)

X-1-1/2"

X-HW (140°F)

X-1"

X-HW (140°F)

X-1-1/2"

X-1"

X-1-1/2"

X-HW (140°F)

X-

HW

(1

°F

X-1"

X-1"

NC

X-HW (140°F)

X-HW

(ABANDONED)

X-1"

X-

HW

(1

°F

X-1-1/2"

X-2"

X-1"

X-1-1/2"

X-1"

X-HW (140°F)

X-HW (110°F)

X-HWR

X-

HW

(1

°F

X-

HW

X-

HW

(1

°F

X-

CW

X-HW

X-CW

X-HW

X-HW

X-HW

X-

HW

X-

CW

X-

HW

R

X-

HW

R

X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F

X-CW

X-CW

NC

X-3" CW TO

UNIT 'A' AND

UNIT 'B'

X-HW TO/FROM

X-STORAGE TANK

(ABANDONED)

X-3/4" HWR

FROM UNIT 'A'

AND UNIT 'B'

X-2" HW (110°F)

TO UNIT 'A' AND

UNIT 'B'

X-3" CW FROM

BUILDING

X-3"

X-2-1/2"

X-2-1/2"

X-3" CW

X-2"

X-1-1/4"

X-3/4"

X-2"

X-CHECK VALVE (TYP.)

X-BUTTERFLY

VALVE (TYP.)

X-1-1/4"

X-1-1/4"

X-1-1/4"

X-2-1/2"

X-2"

X-2-1/2"X-2"

X-2"

X-1"

X-2"

X-2"

X-2"

X-CP

X-CIRCUIT

SETTER (TYP.)

X-1-1/4"

X-2"

X-2"

X-CP (TYP.)

X-CIRCUIT

SETTER (TYP.)

X-HW (140°F &

180°F) TO

KITCHEN

X-HW (140°F)

TO LAUNDRY

X-HWR FROM

KITCHEN

X-HWR FROM

LAUNDRY

X-SCW FROM

BUILDING

X-CONCRETE

PAD (TYP.)

X-FLOOR

X-CW

X-1" CW TO X-AIR

SEPARATOR

X-1" CW

X-3"

X-CW

X-3"

X-CW

X-

CW

X-3"

X-3"

X-FLOOR

X-1-1/2"

X-1-1/2"

ST-2

DWH-1 DWH-2

ST-3 ST-1

2" HW

HW (140°F)HW (140°F)

2"3"3"

UNION, TYP.

BUTTERFLY

VALVE, TYP.

REDUCER, TYP.

X-CONCRETE

PAD (TYP.)

HW

HW

HWR

HW

HWR

HWHW

R

HWHW

R

HWHW

R

HW

HWR

HWHW

R

HWHW

R

G

G 2"2"2"

2"

4"

UNION, TYP.

REDUCER, TYP.

G

2"

HWR

4"

GAS SHUT OFF VALVE, TYP.

CONDENSATE

NEUTRALIZING KIT, TYP.

1-1/2" DRAIN VALVE PIPE

TO FLOOR DRAIN, TYP.

DRIP LEG, TYP.

2-1/2"

2-1/2"

FLOW SWITCH, TYP.

T&P RELIEF VALVE, TYP.

CHECK VALVE, TYP.

CONCRETE PAD

BUTTERFLY VALVE, TYP.

STRAINER, TYP.

BOILER PUMP, TYP.

EXTEND TO NEAREST

FLOOR SINK, TYP.

2-1/2"

4"4"

THERMOMETER, TYP.

BUTTERFLY

VALVE (TYP.)

2" HW

2" HW

UNION, TYP.T&P RELIEF VALVE, TYP.

EXTEND TO NEAREST

FLOOR SINK, TYP.

1" HOSE END

DRAIN VALVE,

TYP.

1-1/2" HWR

HWR

1-1/2"

HW

R

1-1/2"

HWR

1-1/2"

CHECK VALVE, TYP.

3" CW

CW

3"3"

3" CW

HW

(1

°F

2"

HW (140°F)

2"2"

HW (140°F)

HWR HWRHWR

HW

(1

°F

HW

R

1-1/2"3"

3"

HWR

HW (140°F)

1-1/2"

3" HW

3"

X-1-1/2"

HWR

X-GLOBE

VALVE

X-3" CW

X-3" CW

X-1" HW

X-1" HW

1" HW (140°F)

X-1-1/2" HW

1-1/2" HW (140°F)

X-3/4" HWR

X-3/4" HWR

CIRCUIT SETTER

STRAINER

1-1/2" HW (140°F)

CP-1

3/4"

LOCK OPEN

CONNECT TO

SIDE OF MAIN

1"

HOSE END

DRAIN VALVE

P

XT-1

PRESSURE

GAUGE, TYP.

AUTOMATIC AIR

VENT, TYP.

1" HWR

2-1/2"

1-1/2"

1-1/2" 1-1/2" 1-1/2"

1-1/2" HWR

X-1-1/2" HW

1-1/2" 1-1/2"

2" 2" G FROM

BUILDING

22 3

PLUMBING KEY NOTES

MODIFY EXISTING COLD WATER PIPING AS REQUIRED TO

CONNECT TO NEW PIPING.

MODIFY EXISTING HOT WATER PIPING AS REQUIRED TO

CONNECT TO NEW PIPING.

MODIFY EXISTING HOT WATER RETURN PIPING AS

REQUIRED TO CONNECT TO NEW PIPING.

GENERAL NOTES

1. REFER TO PHASING NOTES ON SHEET MP-100 FOR

PHASING / SYSTEM SHUT DOWN REQUIREMENTS.

M A

T R

I X

1 PIPING DIAGRAM - PHASE 2 NEW

X-STORAGE TANK

(DOMESTIC AND

LAUNDRY)

X-DWH

(LAUNDRY)

X-STORAGE TANK

(KITCHEN)

X-DWH

(KITCHEN)

X-DWH

(BACKUP

KITCHEN)

X-DWH

(DOMESTIC)

X-XT-1 X-XT-2 X-XT-3 X-XT-4

X-

HW

(1

°F

X-CW

X-HW

X-HWR

X-HWR

X-CW

X-HWR

X-

CW

X-HW

X-HW

X-2" HW

X-T&P RELIEF

VALVE, TYP.

X-SHUT OFF

VALVE, TYP.

NC NC

X-2"

X-CHECK

VALVE, TYP.

X-UNION, TYP.

X-

HW

X-

HW

X-

HW

X-

HW

NC

X-HW

X-HW

X-2"

X-2"

X-HW

X-2"

X-2"

THERMOMETER, TYP.

X-HW (180°F)

X-PUMP, TYP.

X-HW

X-HW

X-HWR X-HWR

X-HWR

X-HWR

X-HWR

X-HW

X-HW

X-HW

X-

HW

X-T&P RELIEF

VALVE, TYP.

X-SHUT OFF

VALVE, TYP.

X-2"

X-PUMP, TYP.

X-

HW

R X-

HW

X-2" HW

X-

HW

X-2" X-2"

X-2"

X-2"X-2"

X-1" X-1"

X-1"X-3/4"

X-1"X-1"

X-2"

X-2" X-1" X-

HW

NC

X-HW

X-HW

X-

HW

NC

X-

HW

X-

HW

X-

HW

X-

CW

X-2" HW

X-1" X-1"

X-1"

X-HW (140°F)

X-1" X-1"

X-HW (140°F)

X-1-1/2"

X-HW (140°F)

X-1"

X-HW (140°F)

X-1-1/2"

X-1"

X-1-1/2"

X-HW (140°F)

X-

HW

(1

°F

X-1"

X-1"

NC

X-HW (140°F)

X-HW

(ABANDONED)

X-1"

X-

HW

(1

°F

X-1-1/2"

X-2"

X-1"

X-1-1/2"

X-1"

X-HW (140°F)

X-HW (110°F)

X-HWR

X-

HW

(1

°F

X-

HW

X-

HW

(1

°F

X-

CW

X-HW

X-CW

X-HW

X-HW

X-HW

X-

HW

X-

CW

X-

HW

R

X-

HW

R

X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F

X-CW

X-CW

NC

X-3" CW TO

UNIT 'A' AND

UNIT 'B'

X-HW TO/FROM

X-STORAGE TANK

(ABANDONED)

X-3/4" HWR

FROM UNIT 'A'

AND UNIT 'B'

X-2" HW (110°F)

TO UNIT 'A' AND

UNIT 'B'

X-3" CW FROM

BUILDING

X-3"

X-2-1/2"

X-2-1/2"

X-3" CW

X-2"

X-1-1/4"

X-3/4"

X-2"

X-CHECK VALVE (TYP.)

X-BUTTERFLY

VALVE (TYP.)

X-1-1/4"

X-1-1/4"

X-2-1/2"

X-2"

X-2-1/2"X-2"

X-2"

X-1"

X-2"

X-2"

X-2"

X-CP

X-CIRCUIT

SETTER (TYP.)

X-1-1/4"

X-2"

X-2"

X-CP (TYP.)

X-CIRCUIT

SETTER (TYP.)

X-HW (140°F &

180°F) TO

KITCHEN

X-HW (140°F)

TO LAUNDRY

X-HWR FROM

KITCHEN

X-HWR FROM

LAUNDRY

X-SCW FROM

BUILDING

X-CONCRETE

PAD (TYP.)

X-FLOOR

X-CW

X-1" CW TO X-AIR

SEPARATOR

X-1" CW

X-3"

X-CW

X-3"

X-CW

X-

CW

X-3"

X-3"

X-FLOOR

X-ST-2

X-DWH-1 X-DWH-2

X-ST-3 X-ST-1

X-2" HW

X-HW (140°F)X-HW (140°F)

X-2"X-3"

X-UNION, TYP.

X-REDUCER, TYP.

X-CONCRETE

PAD (TYP.)

X-HW

X-HW

X-HWR

X-HW

X-HWR

X-

HW

X-

HW

R

X-

HW

X-

HW

R

X-

HW

X-

HW

R

X-HW

X-HWR

X-

HW

X-

HW

R

X-

HW

X-

HW

R

X- G

X-G X-2"X-2"X-2"

X-2"

X-4"

X-UNION, TYP.

X-REDUCER, TYP.

X- G

X-2"

X-HWR

X-4"

X-GAS SHUT OFF VALVE, TYP.

X-CONDENSATE

NEUTRALIZING KIT, TYP.

X-1-1/2" DRAIN VALVE

PIPE TO FLOOR DRAIN,

TYP.

X-DRIP LEG, TYP.

X-2-1/2"

X-2-1/2"

X-FLOW SWITCH, TYP.

X-T&P RELIEF VALVE, TYP.

X-CHECK VALVE, TYP.

X-CONCRETE PAD

X-BUTTERFLY VALVE, TYP.

X-STRAINER, TYP.

X-BOILER PUMP, TYP.

X-EXTEND TO NEAREST

FLOOR SINK, TYP.

X-2-1/2"

X-4"X-4"

-XTHERMOMETER, TYP.

X-BUTTERFLY

VALVE (TYP.)

X-2" HW

X-2" HW

X-UNION, TYP.X-T&P RELIEF VALVE, TYP.

X-EXTEND TO NEAREST

FLOOR SINK, TYP.

X-1" HOSE END

DRAIN VALVE,

TYP.

X-1-1/2"

HWR

X-HWR

X-1-1/2"

X-

HW

R

1-1/2"

X-HWR

X-1-1/2"

X-CHECK VALVE, TYP.

X-3" CW

X-CW

X-3"X-3"

X-3" CW

X-

HW

(1

°F

X-2"

X-HW (140°F)

X-2"X-2"

X-HW (140°F)

X-HWR X-HWRX-HWR

X-

HW

(1

°F

X-

HW

R

X-1-1/2"X-3"

X-HWR

X-HW (140°F)

X-1-1/2"

X-3" HW

X-3"

X-1-1/2"

HWR

X-GLOBE

VALVE

X-3" CW

X-3" CW

X-1" HW

X-1" HW

X-1" HW (140°F)

X-1-1/2" HW (140°F)

X-3/4" HWR

X-3/4" HWR

X-1-1/2"

X-CIRCUIT SETTER

X-STRAINER

1-1/2" HW (140°F)

X-CP-1

X-3/4"

X-LOCK OPEN

CONNECT TO

SIDE OF MAIN

X-1"

X-HOSE END

DRAIN VALVE

P

X-XT-1

X-PRESSURE

GAUGE, TYP.

X-AUTOMATIC AIR

VENT, TYP.

X-1" HWR

X-2-1/2"

X-1-1/2" X-1-1/2"

X-1-1/2" HWR

X-1-1/2"X-3"

X-3"

X-BUTTERFLY

VALVE, TYP.

X-1-1/2"

X-2-1/2"

X-1-1/4"

X-1-1/2"

X-1-1/2"

X-1-1/4"

X-1-1/4"

GENERAL NOTES

1. REFER TO PHASING NOTES ON SHEET MP-100 FOR

PHASING / SYSTEM SHUT DOWN REQUIREMENTS.

DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC

WATER HEATER AND ALL ASSOCIATED ACCESSORIES.

DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC

WATER STORAGE TANK AND ALL ASSOCIATED

ACCESSORIES.

DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC

WATER EXPANSION TANK IN ITS ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING HOT WATER

RETURN PIPING TO EXTENTS SHOWN AND CAP.

DISCONNECT, REMOVE, AND DEMO EXISTING COLD WATER

PIPING TO EXTENTS SHOWN AND CAP.

DISCONNECT, REMOVE, AND DEMO EXISTING HOT WATER

PIPING TO EXTENTS SHOWN AND CAP.

DISCONNECT, REMOVE, AND DEMO EXISTING

THERMOSTATIC MIXING VALVE. MODIFY EXISTING PIPING

AS REQUIRED TO CONNECT TO NEW MIXING VALVE. DEMO

HOT WATER PIPING TO EXTENTS SHOWN.

DISCONNECT, REMOVE, AND DEMO EXISTING COLD WATER

PIPING BACK TO MAIN AND CAP.

M A

T R

I X

1 PIPING DIAGRAM - PHASE 2 DEMOLITION

X-HWR

X-HWR

X-HWR

X-3/4"

X-1"

X-1-1/2"

X-HW (140°F)

X-HW (140°F)

X-HWR

X-

HW

(1

°F

X-

CW

X-

CW

X-

HW

R

X-

HW

R

X-

HW

R

X-

HW

(1

°F

X-

HW

(1

°F

NC

X-3" CW TO

UNIT 'A' AND

UNIT 'B'

X-HW TO/FROM

X-STORAGE TANK

(ABANDONED)

X-3/4" HWR

FROM UNIT 'A'

AND UNIT 'B'

X-2" HW (110°F)

TO UNIT 'A' AND

UNIT 'B'

X-3" CW FROM

BUILDING

X-3"

X-2-1/2"

X-2-1/2"

X-3" CW

X-2"

X-3/4"

X-2"

X-CHECK VALVE (TYP.)

X-BUTTERFLY

VALVE (TYP.)

X-CP

X-CIRCUIT

SETTER (TYP.)X-2"

X-2"

X-CP (TYP.)

X-CIRCUIT

SETTER (TYP.)

X-HW (140°F &

180°F) TO

KITCHEN

X-HW (140°F)

TO LAUNDRY

X-HWR FROM

KITCHEN

X-HWR FROM

LAUNDRY

X-CONCRETE

PAD (TYP.)

X-FLOOR

X-CW

X-1" CW TO X-AIR

SEPARATOR

X-1" CW

X-3"

X-CW

X-3"

X-CW

X-

CW

X-3"

X-3"

X-FLOOR

X-ST-2

X-DWH-1 X-DWH-2

X-ST-3 X-ST-1

X-2" HW

X-HW (140°F)X-HW (140°F)

X-2"X-3"

X-UNION, TYP.

X-REDUCER, TYP.

X-CONCRETE

PAD (TYP.)

X-HW

X-HW

X-HWR

X-HW

X-HWR

X-

HW

X-

HW

R

X-

HW

X-

HW

R

X-

HW

X-

HW

R

X-HW

X-HWR

X-

HW

X-

HW

R

X-

HW

X-

HW

R

X- G

X-G X-2"X-2"X-2"

X-2"

X-4"

X-UNION, TYP.

X-REDUCER, TYP.

X- G

X-2"

X-HWR

X-4"

X-GAS SHUT OFF VALVE, TYP.

X-CONDENSATE

NEUTRALIZING KIT, TYP.

X-1-1/2" DRAIN VALVE

PIPE TO FLOOR DRAIN,

TYP.

X-DRIP LEG, TYP.

X-2-1/2"

X-2-1/2"

X-FLOW SWITCH, TYP.

X-T&P RELIEF VALVE, TYP.

X-CHECK VALVE, TYP.

X-CONCRETE PAD

X-BUTTERFLY VALVE, TYP.

X-STRAINER, TYP.

X-BOILER PUMP, TYP.

X-EXTEND TO NEAREST

FLOOR SINK, TYP.

X-2-1/2"

X-4"X-4"

-XTHERMOMETER, TYP.

X-BUTTERFLY

VALVE (TYP.)

X-2" HW

X-2" HW

X-UNION, TYP.X-T&P RELIEF VALVE, TYP.

X-EXTEND TO NEAREST

FLOOR SINK, TYP.

X-1" HOSE END

DRAIN VALVE,

TYP.

X-1-1/2"

HWR

X-HWR

X-1-1/2"

X-

HW

R

1-1/2"

X-HWR

X-1-1/2"

X-CHECK VALVE, TYP.

X-3" CW

X-CW

X-3"X-3"

X-3" CW

X-

HW

(1

°F

X-2"

X-HW (140°F)

X-2"X-2"

X-HW (140°F)

X-HWR X-HWRX-HWR

X-

HW

(1

°F

X-

HW

R

X-1-1/2"X-3"

X-HWR

X-HW (140°F)

X-1-1/2"

X-3" HW

X-3"

X-1-1/2"

HWR

X-GLOBE

VALVE

X-3" CW

X-3" CW

X-1" HW

X-1" HW

X-1" HW (140°F)

X-1-1/2" HW (140°F)

X-3/4" HWR

X-3/4" HWR

X-1-1/2"

X-CIRCUIT SETTER

X-STRAINER

1-1/2" HW (140°F)

X-CP-1

X-3/4"

X-LOCK OPEN

CONNECT TO

SIDE OF MAIN

X-1"

X-HOSE END

DRAIN VALVE

P

X-XT-1

X-PRESSURE

GAUGE, TYP.

X-AUTOMATIC AIR

VENT, TYP.

X-1" HWR

X-2-1/2"

X-1-1/2" X-1-1/2"

X-1-1/2" HWR

X-1-1/2"X-3"

X-3"

X-BUTTERFLY

VALVE, TYP.

X-1-1/2"

X-1-1/2"

X-1-1/2"

X-1-1/4"

X-1-1/4"

CW

3"

CW

CW

CW

CW

CW

3"

3"

CW

FS FS

3"

2"

3"

3"

BUTTERFLY

VALVE (TYP.)

UNION, TYP.

FLOW SENSOR

PROVIDED BY WATER

SOFTENER MANU., TYP.

3"

2"

2"

WS-1

BRINE TANK

WS-1

1-1/2"

DRAIN

3/4" BRINE

1-1/2"

DRAIN

3/4" BRINE

1-1/2"

DRAIN

3/4" BRINE

EXTEND 1-1/2"

DRAIN TO NEAREST

FLOOR DRAIN

TMV-1

HW (110°F)

HW

(1

°F

2"

2"

2"

1-1/2"

SHUT OFF VALVE

THERMOMETER, TYP.

UNION, TYP. 1-1/4"

PLUMBING KEY NOTES

INSTALL NEW WATER SOFTENER SYSTEM AT LOCATION

SHOWN. MODIFY EXISTING COLD WATER PIPING AS

REQUIRED.

INSTALL NEW DIGITAL THERMOSTATIC MIXING VALVE AT

LOCATION SHOWN. MODIFY EXISTING PIPING AS REQUIRED.

GENERAL NOTES

1. REFER TO PHASING NOTES ON SHEET MP-100 FOR

PHASING / SYSTEM SHUT DOWN REQUIREMENTS.

M A

T R

I X

1 PIPING DIAGRAM - PHASE 3 NEW

M A

T R

FCPS

V

M C

VI

AV

B

C

DC

M

B

KP

SSCP

CR

SS

AS

TS

G

NCC

M P

E

A L B1 B2

S

SRS

X

X

X

CB

EMERGENCY PUSH STATION

CODE BLUE STATION

TVSS

VFD

TRANSIENT VOLTAGE SURGE SUPPRESSION

VARIABLE FREQUENCY DRIVE

GLASS BREAK

DS

DUPLEX RECEPTACLE

TEACHER STATION

ADMINISTRATION STATION

STUDENT STATION

CARD READER

CARBON MONOXIDE DETECTOR

H

DOCK LIGHT FIXTURE

CONTROL MODULE

S

TELEPHONE / DATA OUTLET

DUTY STATION

STAFF STATION

STAFF REGISTER STATION

DOME LIGHT

DUAL BED STATION

SINGLE BED STATION

BED / LIGHT INTERFACE

PENDENT INTERFACE

EMERGENCY PULL STATION

MASTER STATION

NURSE CALL CONTROLLER

NURSE CALL

ADDENDUM NOTE

PLAN NOTE

DEMOLITION NOTE

THREE PHASE MOTOR

BELL

AUDIO / VIDEO INPUT

VIDEO INPUT

WALL MOUNTED SPEAKER / CLOCK COMBO

WALL MOUNTED SPEAKERS

DUAL FACE CLOCK

CCTV CONTROL PANELCCTV

SECURITY SYSTEM CONTROL PANEL

KEY PAD

BEAM DETECTOR

MOTION DETECTOR

DOOR CONTACT

CAMERA

MONITOR MODULE

FIRE CONTROL POWER SUPPLY

VISUAL ONLY UNIT

ELECTRICAL SYMBOLS LEGEND

DH

V

S

C

M

I

J

SINGLE RECEPTACLE (120 VOLT)

EMERGENCY RECEPTACLE

DOUBLE DUPLEX RECEPTACLE

SINGLE FACE CLOCK

FLUSH FLOOR BOX

SURFACE FLOOR BOX

SPECIAL EQUIPMENT RECEPTACLE

TELEPHONE OUTLET

DATA OUTLET

POWER POLE

JUNCTION BOX

WALL JUNCTION BOX

PULL (JUNCTION) BOX

UNDERFLOOR JUNCTION BOX

OUTLETS

LIGHT FIXTURE

STRIP FIXTURE

IN-GRADE LIGHT FIXTURE

SPOTLIGHT (number of heads shown) EXIT SIGN (face & direction as shown)

WALL MOUNT LIGHT FIXTURE

CEILING LIGHT FIXTURE

TRACK & FIXTURE

STREET TYPE POLE FIXTURE

POLE MOUNTED LIGHT FIXTURE

EXTERIOR WALL MOUNT LIGHT FIXTURE

WALLPACK LIGHT FIXTURE

SPECIAL PURPOSE LIGHT FIXTURE

HIGH BAY LIGHT FIXTURE

EMERGENCY EGRESS LIGHT FIXTURE

(number of heads shown)

EMERGENCY LIGHT FIXTURE

FIXTURES

SWITCHES

SINGLE-POLE SWITCH

DIMMER SWITCH

TIME SWITCH

KEY SWITCH

MANUAL MOTOR SWITCH

THERMAL OVERLOAD SWITCH

SWITCH WITH PILOT LIGHT

FOUR-WAY SWITCH

THREE-WAY SWITCH

CIRCUITRY and RACEWAYS

UNDERFLOOR DUCT

BUS DUCT

PLUGMOLD AS SPECIFIED

WIREMOLD AS SPECIFIED

FLEXIBLE PIGTAILS/CONNECTIONS

"CONDUIT RUN CONTINUES" INDICATION

END OF CONDUIT RUN, CAP AND STAKE

END OF CONDUIT RUN

HOME RUN (with circuit numbers)

CONDUIT STUB DOWN

CONDUIT STUB UP

CONDUIT INSTALLED

CONDUIT INSTALLED

MECHANICAL

ELECTRIC WATER HEATER

ELECTRIC UNIT HEATER

PIPE TRACE HEATER

RESISTANCE HEATER, KW SHOWN

SINGLE PHASE MOTOR

SOUND and SIGNAL

INTERCOM OUTLET

MICROPHONE OUTLET

TELEVISION OUTLET

CHIME

BUZZER

VOLUME CONTROL

SPEAKER

SERVICE and EQUIPMENT

THERMOSTAT

CAPACITOR

ENCLOSED CIRCUIT BREAKER

TRANSFER SWITCH

WIREWAY

GROUND CONNECTION PER N.E.C.

TELEPHONE TERMINAL BOARD

GENERATOR, KW SHOWN

CURRENT TRANSFORMERS

UTILITY METER, AS REQUIRED

WEATHERHEAD

PANELBOARD, FLUSH MOUNTED

PANELBOARD, SURFACE MOUNTED

COMB. STARTER

MAGNETIC STARTER

FUSED DISCONNECT SWITCH

TRANSFORMER

CONTROL

xxVA connection by x/C) IRRIGATION CONTROLLER (120 volt

LIGHTING CONTACTOR

CONTROL TRANSFORMER

buttons indicated) PUSHBUTTON STATION (number of TIME CLOCK (24 hour U.O.N.)

PHOTOCELL (voltage as required)

HUMIDISTAT

FIRE ALARM

TAMPER SWITCH (furnished by FP/C) FLOW SWITCH (furnished by FP/C)

FIREFIGHTER COMMUNICATION JACK

MAGNETIC DOOR HOLDER

REMOTE INDICATING LIGHT, CLG. MTD.

REMOTE INDICATING LIGHT, WALL MTD.

END OF LINE DEVICE

ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

PULL STATION

SPEAKER & LIGHT

SPEAKER

HORN

DUCT SMOKE DETECTOR

HEAT DETECTOR

SMOKE DETECTOR

HORN & LIGHT

DESIGNATIONS

(by E.C.)

(by others)

TT

FACP

ANN

EOL

G

WW

PC

CT

TS

T

H

TC

IC

F

FC

F

T

1,3

OR

PM

WM

BD

UFD

B

F S

J

J

D

WH

PP

J

SWITCH STYLE OCCUPANCY SENSOROC

DIGITAL TIME SWITCH

POWER PACK

DUAL TECHNOLOGY SENSOR - 360° - 500 SQ FT

DUAL TECHNOLOGY SENSOR - 360° - 1000 SQ FT

ULTRASONIC SENSOR - 360° - 2 CIRCUIT

OCCUPANCY SENSOR / PHOTOCELL

WALL MOUNT DUAL TECHNOLOGY SENSOR

OS5

OS4

T

OS2

OS3

OS1

PP

DUCT SMOKE DETECTORF/S

CEILING MOUNTED WIFI

DIGITAL EQUIPMENT METER, AS REQUIRED

M

1. ALL WALL AND FLOOR PENETRATIONS ARE TO BE SEALED TO MAINTAIN ORIGINAL

RATING.

2. ALL CONDUITS TO BE FIELD ROUTED ALONG EXISTING PIPING AND STRUCTURAL

STEEL.

3. THE DIVISION 26 CONTRACTORS SHALL VISIT THE PROJECT AND DETERMINE THE

EXACT EXTENT OF THE DEMOLITION WORK REQUIRED BEFORE BIDDING THE PROJECT.

4. REMOVE ALL EXISTING OBSOLETE EXPOSED CONDUIT, WIRE AND UNUSED EQUIPMENT

WHERE WORK IS BEING DONE EXCEPT ITEMS NOTED OTHERWISE.

5. WHERE BUILDING SURFACES ARE DAMAGED BY THE REMOVAL OF OLD WORK,

SURFACES SHALL BE PATCHED TO MATCH ADJACENT.

6. EXISTING WORK WHICH IS PRESENTLY CONCEALED AND WHICH WILL REMAIN

CONCEALED AND DOES NOT INTERFERE WITH ANY NEW WORK OF ANY TRADE NEED

NOT BE REMOVED. HOWEVER, ALL CONDUIT SHALL BE CAPPED BELOW FINISH

SURFACE AND THEN PATCHED TO MATCH, OR AS NOTED.

7. EXISTING OPENINGS, WHICH ARE TO BE REUSED, SHALL BE MODIFIED OR ENLARGED

TO SUIT THE NEW SYSTEMS AS REQUIRED. PROVIDE ALL REQUIRED CUTTING AND

PATCHING.

8. IF ASBESTOS IS PRESENT, IT WILL BE REMOVED OR RENDERED HARMLESS UNDER

SEPARATE CONTRACT BY THE OWNER.

9. THE DIVISION 26 CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING THE EXISTING

WALLS TO MATCH THE ADJACENT SURFACES BEHIND ALL SURFACE MOUNTED

EQUIPMENT.

10. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT VOLTAGES AND LOADS PRIOR TO

INSTALLING SERVICE TO EQUIPMENT.

11. DRAWINGS ARE BASED ON EXISTING RECORD DOCUMENT AND CASUAL FIELD

OBSERVATION. REPORT ANY DISCREPANCIES TO ENGINEER FOR CLARIFICATION.

GENERAL ELECTRICAL NOTES

POLE

PUMP

PANEL

P

PNL

PVC

PRV-

P-

PB

POLY VINYL CLORIDE

POWER ROOF VENTILATOR

PULL BOX

GENERAL CONTRACTOR

GROUND

HUMIDIFIERH-

GND

GFI

GC

GROUND FAULT INTERRUPTER

ABBREVIATIONS LEGEND

POWER

SWITCH

RECEPT

SF-

SWBD

TCC

SPEC

SW

RGC

RTU-

PWR

VOLTS

WATTS

UF

V

W

UL

VL

UNO

UH-

TS

TYP

TR

ROOF TOP UNIT

RECEPTACLE

SWITCHBOARD

UNDER FLOOR

SPECIFICATIONS

RIGID GALVANIZED STEEL CONDUIT

UNLESS NOTED OTHERWISE

UNDERWRITERS' LABORATORIES, INC.

TAMPER PROOF RECEPTACLE

TAMPER PROOF SWITCH

TEMPERATURE CONTROL CONTRACTOR

VERIFY LOCATION WITH OWNER

TYPICAL

UNIT HEATER

SUPPLY FAN

WITH

WITHOUT

W/

XFMR

W/O

WP

TRANSFORMER

WEATHER PROOF

HOUR

LIGHT

JUNCTION BOX

LIGHT CONTROL

ISOLATED GROUND

HORSEPOWER

MINIMUM

MOUNT

MAKE-UP AIR UNIT

MOTOR CONTROL CENTER

MAIN LUG ONLY

MOUNTED

MOUNTING

MAXIMUM

LIGHTING

LT FLEX

MTD

MUAU-

MTG

MLO

MIN

MT

MC

MAX

MCC

LTG

IG

LC

LT

IMC

JB

HR

HVAC

HOA

HP

NORMALLY CLOSED

NOT IN CONTRACT

NORMALLY OPEN

NOT TO SCALE

NIGHT LIGHTNL

NTS

NO

NIC

NC

HAND-OFF-AUTO SELECTOR SWITCH

HEATING/VENTILATING/AIR CONDITIONING

INTERMEDIATE METAL CONDUIT

LIQUID TIGHT FLEXIBLE METAL CONDUIT

MECHANICAL CONTRACTOR

HID HIGH INTENSITY DISCHARGE

A

AC

AFF

ACU-

AHJ

AHU-

AS

B-

BC

AIC

ATS

BLDG

CHLR-

CND (C)

CKT BKR

CKT

CUH-

CU-

DISC

DFU-

EF-

EC

DWH-

EBB-

DWG

CT-

EXIST./EX.

EWC

FLEX

FLA

FLR

FSES

FLUOR

EMT

ABOVE FINISHED FLOOR

AIR CONDITIONING UNIT

AMPS

ABOVE COUNTER

AIR HANDLING UNIT

AUTOMATIC TRANSFER SWITCH

AMPS INTERRUPTING CAPACITY

AUTHORITY HAVING JURISDICTION

ABOVE SHELF

BOILER

BUILDING

BELOW COUNTER

CHILLER

DOMESTIC WATER HEATER

CABINET UNIT HEATER

CIRCUIT

CIRCUIT BREAKER

CONDUI…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .