Attachment 7 - Attachment B to SOW - PEA periodic inspection requirements letter.pdf

PDF 155 KB Posted

Attached to
Z1DA--534-24-905 - Repair Exterior Balcony (VA-24-00014664)
Solicitation number
36C24724Q0533
Issued by

About this file

This document is a letter providing visual inspection requirements for the Green Space Balcony at the Ralph H. Johnson VA Medical Center in Charleston, South Carolina. The letter outlines the specific inspection procedures to be performed on the balcony's hanging connections, including inspecting the stainless steel plates and welds for corrosion, inspecting the surrounding concrete for cracks, and taking photographs to document the findings. The letter also includes a table detailing the location, bolt size, embedment depth, and number of bolts for each connection. The visual inspection is being conducted as part of VA Contract 534-24-905 for the Repair of Exterior Balcony at the Ralph H. Johnson VA Medical Center.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PO Box 8836 ● Greenville, South Carolina 29604 ● 864.242.4373 ● www.peaofsc.com

June 2, 2021

Mr. Ryan James Ralph H. Johnson VAMC 109 Bee Street Charleston, SC 29401

Ref: Green Space Balcony (534-13-105) Ralph H. Johnson VAMC Charleston SC PE Project 2013-041 Visual Inspection Requirements

Ryan:

This procedure is to be used to inspect the Green Space Balcony hanging connections. It was originally anticipated that the inspection would be done yearly for a couple of years, then transition to every five years. It is now five years since the completion of the work. The following should be done as a visual inspection. Only if there are problems that are documented from the inspection should a consultation be made to determine a different testing procedure. Below is a table of the connections and their location and size and number of bolts.

Location Mark Bolt Size Embed Number

4th C-1 TP102 3/4 6” 12

4th D-1 TP101 3/4 8” 18

4th E-1 TP100 3/4 6” 12

5th C-1 TP25 3/4 4” 4

5th D-1 TP30 1 8” 8

5th E-1 TP32 3/4 4” 4

Roof C-1 TP105 3/4 11” 24

Roof D-1 TP104 3/4 6” 14

Roof E-1 TP103 3/4 6” 14

Totals 9 - - -

Green Space Balcony (534-13-105)

Ralph H. Johnson VAMC

Charleston SC

PE Project 2013-041

Visual Inspection Requirements June 2, 2021

Visual Inspection Procedure For Each Connection:

1. Inspect the stainless steel plates and welds for corrosion.

2. Inspect the concrete that is around (or covered by if accessible) the plates for cracks.

3. At the three connections at the corner of the building, inspect the return concrete for cracks as well.

4. Photograph all the inspected materials.

5. Provide a written report and photographs documenting all that has been done at this inspection.

Let me know if you have any comments.

Respectfully, Richard H Kapp, PE SE Principal Engineer rhkapp@peaofsc.com Professional Engineering Associates, Inc 110 Edgeworth Street, Greenville SC 29607