This document is a Life Safety Risk Assessment Tool and related assessment templates used to evaluate and manage life safety code deficiencies in buildings during construction or maintenance activities.

The Initial Life Safety Risk Assessment Tool (Attachment 3) provides a framework for identifying and scoring building deficiencies based on two primary factors: severity of occurrence and impact of the deficiency. Severity is categorized into four levels, from Category 1 (deficiency likely to cause major injury or death) to Category 4 (minimal safety impact). Impact is assessed across four scopes: Facility Wide, Multiple Units/Floors, Local/Single Unit, or Short Duration. By cross-referencing these two factors in a matrix, assessors determine a Risk Tolerance Score of HIGH (requires specific remediation actions), MEDIUM (requires remedial action), LOW (no ILSM required), or No ILSM Required. If a HIGH or MEDIUM score is assigned, a Full Interim Life Safety Measures Assessment (Attachment A.1) must be completed.

Attachment A.1 identifies specific life safety code deficiencies that may trigger the need for Interim Life Safety Measures (ILSM), including issues such as lacking code-complying smoke barriers, improper fire exit stair discharge, excessive travel distances to exits, lacking two remote exits, nonconforming building construction, improperly protected vertical openings, large fire barrier penetrations, unprotected hazardous areas, non-functioning fire/smoke dampers, blocked exits, rerouted emergency room traffic, occupied floor renovations, and disconnected alarm devices. Attachment A.2 provides a decision matrix mapping specific deficiencies to appropriate ILSM interventions, which include posting alternative exit signage, daily egress inspections, temporary fire alarm systems, additional firefighting equipment, temporary construction partitions, hazard surveillance, combustible load control, firefighting training, and quarterly fire drills. Attachment A.3 finalizes the implementation plan by identifying which ILSM measures will be executed and designating responsible parties, requiring sign-off from the Contracting Officer's Representative, Engineering Service Chief, and Construction Safety Committee Chair.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3 Initial Life Safety Risk Assessment Tool

Building: Floor: Date:

Specific Location:

Brief Description of Deficiency

Identify the Severity of the Occurrence Identify the Impact of the Deficiency

Category 1 (1) Deficiency likely to cause major injury or death

Facility Wide (1) Impacts the entire facility

Category 2 (2) Deficiency likely to cause minor injury

Multiple Unit/Floors (2) Impacts multiple smoke compartments

Category 3 (3) Deficiency not likely to cause injury

Local/Single Unit (3) Impacts a single smoke compartment or area

Category 4 (4) Deficiency likely has minimal impact to safety

Short Duration (4) Correction can be performed during shift identified

Plot the Severity of the Occurrence and the Impact of the Deficiency to determine Risk Tolerance Score:

Risk Tolerance

Severity of Occurrence Category 1

(1) Deficiency likely to cause major injury or death

Category 2 (2) Deficiency likely to cause minor injury

Category 3 (3) Deficiency not likely to cause injury

Category 4 (4) Deficiency likely has minimal impact to safety

Im p ac t o f

D ef ic ie n cy

Facility Wide (1) Impacts the entire facility

HIGH Needs Specific

Remediation Actions

HIGH Needs Specific

Remediation Actions

MEDIUM

Needs

Remedial Action

LOW No ILSM Required

Multiple Units / Floors (2) Impacts multiple smoke compartments

HIGH Needs Specific

Remediation Actions

HIGH Needs Specific

Remediation Actions

MEDIUM

Needs

Remedial Action

LOW No ILSM Required

Local/Single Unit

(3) Impacts a single smoke compartment or area

HIGH Needs Specific

Remediation Actions

MEDIUM Needs Remedial Action

MEDIUM

Needs

Remedial Action

LOW No ILSM Required

Short Duration

(4) Correction can be performed during shift identified

No ILSM Required

Completed by: Signature:

Risk Tolerance Score: HIGH MEDIUM LOW No ILSM Required

Full ILSM Assessment Required: YES* NO

*If YES is marked above, complete a Full Interim Life Safety Measures Assessment (AttachmentA.1)

Attachment A.1 Full Interim Life Safety Measures Assessment

Building: Floor: Date:

Specific Location:

Assessment for Life Safety Code Deficiency Assessment for Renovation Project

Complete this Assessment FIRST to determine if Interim Life Safety Measures required to mitigate the risk posed by the Life Safety deficiency.

YES NO

a. Lacking a code complying smoke barrier.

b. Fire exit stairs discharge improperly

c. Excessive travel distance to an approved exit.

d. Lack of two remote exits.

e. Nonconforming building construction type.

f. Improperly protected vertical openings.

g. Large penetrations in fire barriers.

h. Hazardous areas not properly protected.

i. Fire /smoke damper(s) not operating properly or are inaccessible for inspection

j. Blocking of an approved exit.

k. Rerouting of traffic to emergency room.

l. Renovation on an occupied floor.

m. Replacing fire alarm system (out of service)

n. Installing sprinkler system (out of service)

o. Disconnecting alarm devices.

p. Other Life Safety Deficiency not identified above Description of Other Life Safety Deficiency not identified above:

Are ILSM required? YES NO (NOTE: ILSM are required if any question above is marked YES).

Use the Interim Life Safety Measures Decision Matrix (Attachment A.2) to determine necessary mitigating activities to be implemented.

Person(s) Participating in the Assessment:

Signature

X

Project # (if applicable):

Attachment A.2 Interim Life Safety Measures Decision Matrix

Existing Significant Life Safety Code Deficiencies or Conditions as a Result of Construction or Maintenance

P os t a lte rn at iv e ex it si gn ag e

In sp ec t e gr es s da ily in a ffe ct ed a re a

P ro vi d e te m po ra ry bu t e qu iv a le nt fi re al ar m de te ct io n sy st em

P ro vi d e ad di tio na l fir ef ig ht in g eq u ip m e nt vi d e te m po ry co ns tr uc tio n pa rt iti on s

In cr ea se h az ar d su rv ei lla nc e

C on tr o l c om bu st ib le lo di g vi d e ad di tio na l fir ef ig ht in g eq u ip m e nt tr ai ni g

C on du ct a d di tio na l qu ar te rl y fir e dr ill s pe r sh ift p er q u ar te r in a ffe ct ed a as

In sp ec t te st te m po ra ry fi sy st em s m th ly b as is

T in p er so nn e l i n af fe ct ed a as

T in th os e w h o w or k in th e h os pi ta l to c om pe ns at e fo r im pa ir ed s tr uc tu ra l or c om pa rt m e n ta l fir e sa fe ty f ea tu re s

1.

2.

3.

4.

5.

6.

7.

8.

9.

a. Lacking a code complying smoke barrier. X X X X X X

b. Fire exit stairs discharge improperly X X

c. Excessive travel distance to an approved exit. X X X X

d. Lack of two remote exits. X X X

e. Nonconforming building construction type. X X X X X X

f. Improperly protected vertical openings. X X X

g. Large penetrations in fire barriers. X X X

h. Hazardous areas not properly protected. X X X X

i. Fire /smoke damper(s) not operating properly or inaccessible to inspection

X X

j. Blocking of an approved exit. X X X X X

k. Rerouting of traffic to emergency room. X

l. Renovation on an occupied floor. X X X X X X X X

m. Replacing fire alarm system (out of service) Follow Fire Watch Procedures

n. Installing sprinkler system (out of service) Follow Fire Watch Procedures

o. Disconnecting alarm devices. X X X

p. Other Life Safety Deficiency not identified above* *for Other Life Safety Deficiency not identified above, determine the ILSM to be implemented and mark them in the appropriate box(es) above.

** if it is deemed necessary to install temporary fire alarm or detection systems for any of the deficiencies above, mark it in the matrix as an additional requirement.

This form provides guidance for ILSM to be implemented, however, based on the project scope and/or life safety code deficiency, the ILSM to be implemented may be expanded or reduced from what this table says. The final ILSM to be implemented will be identified in Attachment A.3 ILSM to be Implemented.

Attachment A.3 ILSM to be Implemented

Based on the review of the ILSM Decision Matrix (Attachment A.2), please, list the ILSM to be implemented to maintain a safe environment during the lifespan of the Life Safety Code deficiency.

Place an X for applicable ILSM ILSM to be Implemented Responsible party

1. Post alternative exit signage

2. Inspect egress daily in affected area

3. Provide temporary but equivalent fire alarm / detection system

4. Provide additional firefighting equipment

5. Provide temporary construction partitions

6. Increase hazard surveillance

7. Control combustible loading

8. Provide additional firefighting equipment training

9. Conduct additional quarterly fire drills per shift per quarter in affected areas

10. Inspect / test temporary fire systems on a monthly basis

11. Train personnel in affected areas

12. Train those who work in the hospital to compensate for impaired structural or compartmental fire safety features

1.

Signature – Contracting Officer’s Representative

Date

2.

Signature – Engineering Service, Chief Date

3.

Signature – Chair Construction Safety Committe Date