Attachment 7 1M20-A Mixer Grinder Systems.docx

DOCX document 89 KB Posted

Attached to
Preventive Maintenance and Unscheduled Repairs of Miscellaneous Food Processing Equipment Commissary Group 22
Solicitation number
HQC00423Q0018
Issued by

About this file

This document outlines specifications for mixer/grinder systems and provides details for a related federal contract opportunity for preventive maintenance and unscheduled repairs of food processing equipment. The specifications require a floor model grinder/mixer with a 200-pound hopper capacity and 35-pound per minute output. Key components like mixing arms, screws, and seals must be removable for cleaning. Standards include UL listing and NSF certification. The warranty is 12 months and covers parts, service, and labor. Electrical specifications are provided for both U.S. and Pacific theater stores. The related solicitation is from the Defense Commissary Agency for preventive maintenance and unscheduled repairs of miscellaneous food processing equipment under Commissary Group 22. Installation, training, and long-term parts support are required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INITIATED

04/12/16

CED

MEAT

DEPARTMENT

Minimal Acceptable Standards

REVISION

11/13/18

1M20-A
Mixer / Grinder Systems
PAGE 2 of 3

Purpose of this Equipment: To thoroughly grind and mix fresh or hard-chilled muscle meat, lean trimmings, fat, and or chub ground beef into other products in a high volume meat room operation.

1 Federal Supply Class: 7320

2 General Operating Specifications:

2.1 Dimensions:

2.1.1 Dimensions not to exceed 35 inches long / wide, 60 inches deep, and 60 inches high. This equipment must be an upright floor model.

2.2 Salient Characteristics that shall be provided:

2.2.1 Minimum hopper product capacity of 200 pounds.

2.2.2 Minimum ground meat output of 35 pounds per minute.

2.2.3 Auger and mixing arms powered by separate motors.

2.2.4 Mixing arm, conveyor screw, conveyor screw drive shaft seal, mix-arm seal and cylinder removable for cleaning.

2.2.5 Motor overload protection.

2.2.6 Sealed push button control panel with heater system to protect from condensation

2.2.7 Water resistant foot control pedal.

2.2.8 Side feed inlet and connector for tandem option.

2.2.9 Height adjustable legs.

2.2.10 Legs equipped with locking casters.

2.2.11 3 each #32, #42 or #52 knives and plates.

2.3 Industry Standards / Requirement(s):

2.3.1 Industry Standards: Underwriters Laboratory (UL) listed and National Sanitation Foundation (NSF) 8 certification, or approved equivalent. Conformité Européene (CE) is not acceptable for a standard.

2.3.2 Warranty period shall be for 12 months from date of delivery against defective material and workmanship and shall include parts, service and labor.

2.4 Information Technology requirements: N / A

2.5 Color Requirement(s): N / A

3 Electrical Requirements:

3.1 _____ Standard U.S.A. electrical specifications: 200 to 220 Volts, 60 Hertz, 3 Phase.

3.2 _____ Pacific Theater stores 200V to 220V / 50 HZ / 3 PH (Applies to these stores only: Atsugi, Misawa, Sagami, Sagamihara, Yokosuka, Yokota, Camp Zama, and Kanto Plains CDC. All other stores are standard U.S.A. 60 Hertz).

3.3 _____ Minimum 8 foot cord with a NEMA Standard plug, or a manufacturer’s equivalent to comply with the equipment plug in requirements.

3.4 Maximum operating amperage not to exceed 31 amps.

Standard Contractor Requirements:

3.5 Must be shipped ready to plug in and use.

3.6 De-installation of old equipment is required.

3.7 This equipment requires disposal: Store Director shall designate the area in the store. Place the equipment item in the designated area until disposition instructions are received from HQ. The contractor is not responsible for the disposition of this equipment item.

3.8 Installation required by an authorized service technician.

3.9 Operational testing is required.

3.10 Startup assistance required.

3.11 Provide familiarization training.

3.12 Information to be provided by the Contractor to the commissary at the time of delivery:

3.12.1 Point of Contact for Service

3.12.2 Installation and Operating Instructions

3.12.3 Parts List

3.13 Maintenance Sustainability Requirements: Continued parts support is required for the projected life cycle of the equipment plus 5 years.

Special Coordinating / Safety Instructions: Grinder will not operate when lid is open.

STORE ORDER REQUEST

STORE NAME: __________________________ DODAAC: ____________________

_______ (ea) 1M20-A (Single)

1) LEFT TO RIGHT CONFIGURATION: __________

2) RIGHT TO LEFT CONFIGURATION: __________

FY16r.05 image1.png

File details come from the government source that posted it. Updated .