Attachment 3 1B20 Proofer Roll-In.docx
DOCX document 53 KB Posted
- Solicitation number
- HQC00423Q0018
- Issued by
-
Defense Commissary Agency
About this file
This document is a technical specification for a roll-in proofer for use in bakery departments. The specification calls for a stainless steel interior and exterior proofer not exceeding 100 inches high, 39 inches wide, and 44 inches deep for a single door model or 100 inches high, 79 inches wide, and 44 inches deep for a double door model. The proofer must have magnetic door gaskets, be insulated with interior bumpers, and have electronic controls for temperature and humidity as well as an interior light and reversible door. It must be flush with the floor with water inlet and drain connections. Additional requirements include UL listing, NSF certification, a one-year parts and labor warranty, and compatibility with various U.S. and Pacific theater voltage specifications. The related solicitation is for preventive maintenance and unscheduled repairs of miscellaneous food processing equipment for Commissary Group 22 from the Defense Commissary Agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 7 1M20-A Mixer Grinder Systems.docx | DOCX document | |
| Attachment 9 4SMA Slicer Meat Automatic.docx | DOCX document | |
| Attachment 11 MFP Group 22 CLIN Pricing.xlsx | XLSX spreadsheet | |
| Attachment 8 1M34 Tenderizer Meat.docx | DOCX document | |
| Attachment 4 1D09 Rotisserie Oven.docx | DOCX document | |
| Attachment 6 1M18 Band Saw Meat.docx | DOCX document | |
| Attachment 1 MFP Group 22 Equipment Listing.pdf | ||
| Attachment 2 1B15 Oven Mini-Rotary with Proofer.docx | DOCX document | |
| Attachment 10 Performance Work Statement.pdf | ||
| Attachment 5 1M16 Molder-bulker meat.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INITIATED
11/29/17
CED
BAKERY
DEPARTMENT
Minimal Acceptable Standards
REVISION
xx/xx/xx
| 1B20 | |
| Proofer, roll-in | |
| PAGE 3 of 3 |
Purpose of this Equipment: To provide optimum atmosphere (temperature and humidity) for proofer stage of production of bakery products.
1 Federal Supply Class: 7310
2 General Operating Specifications:
2.1 Dimensions:
2.1.1 1B20-A (1 door): Not to exceed 100 inches high, 39 inches wide, 44 inches deep.
2.1.2 1B20-B (2 doors): Not to exceed 100 inches high, 79 inches wide, 44 inches deep.
2.2 Salient Characteristics that shall be provided:
2.2.1 Stainless steel construction interior and exterior (aluminum top acceptable).
2.2.2 One rack per door only.
2.2.3 Magnetic door gaskets.
2.2.4 Insulated.
2.2.5 Interior bumpers.
2.2.6 Electronic controls for adjusting temperature and humidity.
2.2.7 Interior Light.
2.2.8 Reversible door.
2.2.9 Must be flush and level with floor.
2.2.10 Water inlet and drain connections.
2.3 Industry Standards / Requirement(s):
2.3.1 Industry Standards: Underwriters Laboratory (UL) listed and National Sanitation Foundation (NSF) certification, or approved equivalent. Conformité Européene
2.3.2 Warranty period shall be for (1) year from date of delivery against defective material and workmanship and shall include parts, service and labor.
2.4 Information Technology requirements: N / A
2.5 Color Requirement(s): N / A
3 Electrical Requirements:
3.1 _____Standard U.S.A electrical specifications: 208 V/ 60 HZ/ 3 PH and
120 V/ 60 HZ/ 1 PH
3.2 _____U.S.A. electrical specifications: 240 V/ 60 HZ/ 3 PH and
120 V/ 60 HZ/ 1 PH
3.3 _____U.S.A. electrical specifications: 480 V/ 60 HZ/ 3 PH and
120 V/ 60 HZ/ 1 PH
3.4 _____ Pacific Theater stores 208/230 V / 50 HZ / 1 PH (Applies to these stores only: Atsugi, Misawa, Sagami, Sagamihara, Yokosuka, Yokota, Camp Zama, and Kanto Plains CDC. All other stores are standard U.S.A. 60 cycle voltages.)
3.5 NOTE: the operating range for 120 volts is 110 to 120 volts; the operating range for 220 volts is 208 to 230 volts.
Standard Contractor Requirements:
3.6 Must be shipped split, ready to assemble, able to fit through a 36 inch opening, make utility connections, and use.
3.7 De-installation of old equipment is required.
3.8 This equipment requires disposal: Contractor to remove from commissary and dispose.
3.9 Installation required by an authorized service technician.
3.10 Operational testing is required.
3.11 Startup assistance required.
3.12 Provide familiarization training.
3.13 Information to be provided by the Contractor to the commissary at the time of delivery:
3.13.1 Point of Contact for Service
3.13.2 Installation and Operating Instructions
3.13.3 Parts List
3.14 Maintenance Sustainability Requirements: Continued parts support is required for the projected life cycle of the equipment plus 5 years.
Special Coordinating / Safety Instructions: De-installation of existing proofer and removal from premises for disposal is requested.
STORE ORDER REQUEST
STORE NAME: __________________________ DODAAC: ____________________
SINGLE OR DOUBLE: _________ QUANTITY: _______
1. DOOR: RIGHT HAND____________________, LEFT HAND________________
1. DRAIN LOCATED FRONT________________, REAR_______________________
1. ADDITIONAL RACKS: ___________________
1. CURRENT PROOFER TO BE REMOVED:
MANUFACTURER______________________ BARCODE____________________
SERIAL NUMBER_______________________ MFR YEAR___________________