Attachment 7 1B20 Proofer Roll-In.docx

DOCX document 53 KB Posted

Attached to
Preventive Maintenance and Unscheduled Repairs of Miscellaneous Food Processing Equipment Commissary Group 16
Solicitation number
HQC00423Q0019
Issued by

About this file

This document is a specification for a roll-in proofer for a bakery department. It provides requirements for two models of a roll-in proofer including dimensions of no more than 100 inches high, 39 inches wide, 44 inches deep for a single door model and 100 inches high, 79 inches wide, 44 inches deep for a double door model. It specifies stainless steel interior and exterior construction, magnetic door gaskets, insulation, interior lighting, electronic controls for temperature and humidity, reversible doors, water connections, UL and NSF certification. Installation, start-up assistance and training by an authorized technician are required. Maintenance and parts support for the projected lifecycle plus five years must be provided. The related federal contract opportunity is for preventive maintenance and unscheduled repairs of miscellaneous food processing equipment for Commissary Group 16 under solicitation number HQC00423Q0019 issued by the Defense Commissary Agency.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INITIATED

11/29/17

CED

BAKERY

DEPARTMENT

Minimal Acceptable Standards

REVISION

xx/xx/xx

1B20
Proofer, roll-in
PAGE 3 of 3

Purpose of this Equipment: To provide optimum atmosphere (temperature and humidity) for proofer stage of production of bakery products.

1 Federal Supply Class: 7310

2 General Operating Specifications:

2.1 Dimensions:

2.1.1 1B20-A (1 door): Not to exceed 100 inches high, 39 inches wide, 44 inches deep.

2.1.2 1B20-B (2 doors): Not to exceed 100 inches high, 79 inches wide, 44 inches deep.

2.2 Salient Characteristics that shall be provided:

2.2.1 Stainless steel construction interior and exterior (aluminum top acceptable).

2.2.2 One rack per door only.

2.2.3 Magnetic door gaskets.

2.2.4 Insulated.

2.2.5 Interior bumpers.

2.2.6 Electronic controls for adjusting temperature and humidity.

2.2.7 Interior Light.

2.2.8 Reversible door.

2.2.9 Must be flush and level with floor.

2.2.10 Water inlet and drain connections.

2.3 Industry Standards / Requirement(s):

2.3.1 Industry Standards: Underwriters Laboratory (UL) listed and National Sanitation Foundation (NSF) certification, or approved equivalent. Conformité Européene

2.3.2 Warranty period shall be for (1) year from date of delivery against defective material and workmanship and shall include parts, service and labor.

2.4 Information Technology requirements: N / A

2.5 Color Requirement(s): N / A

3 Electrical Requirements:

3.1 _____Standard U.S.A electrical specifications: 208 V/ 60 HZ/ 3 PH and

120 V/ 60 HZ/ 1 PH

3.2 _____U.S.A. electrical specifications: 240 V/ 60 HZ/ 3 PH and

120 V/ 60 HZ/ 1 PH

3.3 _____U.S.A. electrical specifications: 480 V/ 60 HZ/ 3 PH and

120 V/ 60 HZ/ 1 PH

3.4 _____ Pacific Theater stores 208/230 V / 50 HZ / 1 PH (Applies to these stores only: Atsugi, Misawa, Sagami, Sagamihara, Yokosuka, Yokota, Camp Zama, and Kanto Plains CDC. All other stores are standard U.S.A. 60 cycle voltages.)

3.5 NOTE: the operating range for 120 volts is 110 to 120 volts; the operating range for 220 volts is 208 to 230 volts.

Standard Contractor Requirements:

3.6 Must be shipped split, ready to assemble, able to fit through a 36 inch opening, make utility connections, and use.

3.7 De-installation of old equipment is required.

3.8 This equipment requires disposal: Contractor to remove from commissary and dispose.

3.9 Installation required by an authorized service technician.

3.10 Operational testing is required.

3.11 Startup assistance required.

3.12 Provide familiarization training.

3.13 Information to be provided by the Contractor to the commissary at the time of delivery:

3.13.1 Point of Contact for Service

3.13.2 Installation and Operating Instructions

3.13.3 Parts List

3.14 Maintenance Sustainability Requirements: Continued parts support is required for the projected life cycle of the equipment plus 5 years.

Special Coordinating / Safety Instructions: De-installation of existing proofer and removal from premises for disposal is requested.

STORE ORDER REQUEST

STORE NAME: __________________________ DODAAC: ____________________

SINGLE OR DOUBLE: _________ QUANTITY: _______

1. DOOR: RIGHT HAND____________________, LEFT HAND________________

1. DRAIN LOCATED FRONT________________, REAR_______________________

1. ADDITIONAL RACKS: ___________________

1. CURRENT PROOFER TO BE REMOVED:

MANUFACTURER______________________ BARCODE____________________

SERIAL NUMBER_______________________ MFR YEAR___________________

FY16r.05 image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .