Attachment 6 - Sustainable Products.pdf

PDF 28 KB Posted

Attached to
OCO Dining Hall Walk-in Freezer Replacement
Solicitation number
12441926Q0033
Issued by

About this file

This is a brief solicitation document for the OCO – B9 Walk-In Freezer Replacement project. The procurement requires the replacement of a walk-in freezer with sustainable, energy-efficient equipment. All products specified must meet Energy Star certification, ASHRAE 90.1 standards, Department of Energy (DOE) requirements, and Federal Energy Management Program (FEMP) designation criteria. The document emphasizes environmental sustainability and operational efficiency as primary requirements for the equipment to be procured. No additional details regarding pricing, timelines, response deadlines, or specific technical specifications are provided in this document excerpt.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OCO – B9 Walk-In Freezer Replacement

Sustainable Products: Energy star, ASHRAE 90.1, DOE, and FEMP designated products are specified.

File details come from the government source that posted it. Updated .