About this file

The document is a Project Price Breakdown template for a construction project, detailing cost allocation across 34 construction divisions. The template allows for granular cost tracking, with separate columns for labor costs, material costs, and total costs across categories including General Requirements, Concrete, Masonry, Metals, Wood and Plastic, Thermal & Moisture Protection, Doors and Windows, Specialties, Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, and Utilities.

The template includes sections for calculating Division Subtotals, with provisions for entering Overhead percentage, Profit percentage, and Bond percentage. The bottom of the document features a "Total Base Offer Cost" row, allowing for comprehensive project cost compilation. However, all monetary fields are currently blank, indicating this is a standard pricing breakdown form awaiting specific project cost details to be filled in by the offeror.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number: Date:

Project Title Project Location Offeror Name Offeror Street Offeror City State Zip

Item Labor Cost Material Cost Total Cost Division 1 $ - $ - $ - Division 2 - - - Division 3 - - - Division 4 - - - Division 5 - - - Division 6 - - - Division 7 - - - Division 8 - - - Division 9 - - - Division 10 - - - Division 11 - - - Division 12 - - - Division 13 - - - Division 14 - - - Division 21 - - - Division 22 - - - Division 23 - - - Division 26 - - -

Description

Project Price Breakdown

Masonry Metals Wood and Plastic

General Requirements Existing Conditions Concrete

Specialties Equipment Furnishings

Thermal & Moisture Protect Doors and Windows Finishes

Plumbing

HVAC

Electrical

Special Construction Conveying Equipment Fire Suppression

Division 27 - - - Division 28 - - - Division 31 - - - Division 32 - - - Division 33 - - - Division 34 - - -

Overhead % - Profit % - Bond % -

Exterior Improvements Utilities Transportation Subtotal

Communications Electronic Safety & Security Earthwork

Total Base Offer Cost

Overhead/Profit Subtotals :

Division Subtotals :

0.00% 0.00% 0.00%

Base Offer

File details come from the government source that posted it. Updated .