Attachment 6 - Pricing Template_CLIN Structure.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
Night Vision Device - Next (NVD-N) Federal contract opportunity
Solicitation number
W91CRB-24-NVDN
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This document provides details for a draft Request for Prototype Proposal (RPP) from the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. The RPP seeks prototype development of the Night Vision Device - Next (NVD-N) through the use of a competitive Other Transaction agreement. Respondents are requested to design NVD-N systems, develop manufacturing processes, fabricate prototype systems according to the design and processes, and test prototypes to validate the design and processes with respect to the NVD-N Performance Specification and Statement of Work. Industry feedback on the RPP and associated documents is requested via email submission of comments in a Microsoft Word document by the specified deadline. Access to several RPP attachments must be requested from the points of contact provided.

View the file

Other files for this federal contract opportunity

Other files attached to Night Vision Device - Next (NVD-N), newest first.
File Type Posted
Attachment 9 - Technical Evaluation Tables.xlsx XLSX spreadsheet
Attachment 5 - DRAFT OTA NVD-N.docx DOCX document
DRAFT NVD-N RPP (29Feb24).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLINs

Please complete yellow highlighted cells. Do not modify. *Note that pricing can not exceed (2) two decimal places.
CLINNameCommentsTotal Evaluated Price (TEP)Cost TypeQuantityUnit of MeasureUnit PriceTotal Price
0001Systems 1 DeliveryDelivery of FY24 systems (Max Quantity)FFPEachERROR:#DIV/0!$439,000.00
0001Systems 1 DeliveryDelivery of FY24 systems (1 Each Price)XFFP1EachERROR:#DIV/0!ERROR:#DIV/0!*
0002Systems 1 TestingEDT-C for FY24 systems (Equals Qty CLIN 0001)XFFP0Lot$0.00*
0003Systems 1 RefurbishmentRefurb of FY24 systems prior to STP1CPFF /NTE1LotNA$220,000.00
0004Systems 2 DeliveryDelivery of FY25 systems (Qty 1 to 60)Optional CLINXFFP60Each$0.00*
0005Systems 2 TestingEDT-C for FY25 systems (Minimum Test Qty XX)Optional CLINXFFPEach$0.00*
0006Systems 2 RefurbishmentRefurb of systems prior to LUTOptional CLINCPFF /NTE1LotNA$200,000.00
0007PDR/PACProgram management, engineering labor, required documentationXFFP1LotNA*
0008CDRProgram management, engineering labor, required documentationXFFP1LotNA*
0009TRRProgram management, engineering labor, required documentationXFFP1LotNA*
0010PRRProgram management, engineering labor, required documentationXFFP1LotNA*
0011PVS-14 Optics effortsInspection and minor refurb of GFP PVS-14 opticsCPFF /NTE1LotNA$50,000.00
0012On site tech support, troubleshooting, training supportYear 1: To inclue STP, LUT, EAD, and MDOptional CLINCPFF /NTE1LotNA$65,000.00
0013On site tech support, troubleshooting, training supportYear 2: To inclue STP, LUT, EAD, and MDOptional CLINCPFF /NTE1LotNA$65,000.00
0014On site tech support, troubleshooting, training support6 Month: To inclue STP, LUT, EAD, and MDOptional CLINCPFF /NTE1LotNA$65,000.00
0015QRGDelivery of contractor format QRGXFFP1LotNA*
0016TM 100%Delivery of contractor format TMXFFP1LotNA*

Total Contract Price ERROR:#DIV/0!

Note: CLIN 0001 appears twice on Attachment 6. Once for the max quantity and unit price at the maximum price of $439,000.00. The second time to capture the unit price in the TEP only for the purpose of determining the lowest priced offer.
* Total Evaluated Price (TEP) CLINsERROR:#DIV/0!

CLIN 0002

Instructions to Company:
Please complete yellow highlighted cells.
Insert rows and columns as necessary, but please maintain the format as much as possible.
CLIN 0011 -0015Fringe Rate:Sub-TotalOverhead Rate:Sub-TotalG&A Rate:Sub-TotalProfit Rate:
30%20%8%7%
Labor CategoryDirect Labor RateFringeOverheadG&AProfitTotal price / FBLR
Example$ 25.25$ 7.57$ 32.83$ 6.57$ 39.39$ 3.15$ 42.54$ 2.98$ 45.52
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0

CLIN 0006

Instructions to Company:
Please complete yellow highlighted cells.
Insert rows and columns as necessary, but please maintain the format as much as possible.
CLIN 0011 -0015Fringe Rate:Sub-TotalOverhead Rate:Sub-TotalG&A Rate:Sub-TotalProfit Rate:
30%20%8%7%
Labor CategoryDirect Labor RateFringeOverheadG&AProfitTotal price / FBLR
Example$ 25.25$ 7.57$ 32.83$ 6.57$ 39.39$ 3.15$ 42.54$ 2.98$ 45.52
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0

CLIN 0012

Instructions to Company:
Please complete yellow highlighted cells.
Insert rows and columns as necessary, but please maintain the format as much as possible.
CLIN 0012Fringe Rate:Sub-TotalOverhead Rate:Sub-TotalG&A Rate:Sub-TotalProfit Rate:
30%20%8%7%
Labor CategoryDirect Labor RateFringeOverheadG&AProfitTotal price / FBLR
Example$ 25.25$ 7.57$ 32.83$ 6.57$ 39.39$ 3.15$ 42.54$ 2.98$ 45.52
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0

CLIN 0013

Instructions to Company:
Please complete yellow highlighted cells.
Insert rows and columns as necessary, but please maintain the format as much as possible.
CLIN 0013Fringe Rate:Sub-TotalOverhead Rate:Sub-TotalG&A Rate:Sub-TotalProfit Rate:
30%20%8%7%
Labor CategoryDirect Labor RateFringeOverheadG&AProfitTotal price / FBLR
Example$ 25.25$ 7.57$ 32.83$ 6.57$ 39.39$ 3.15$ 42.54$ 2.98$ 45.52
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0

CLIN 0014

Instructions to Company:
Please complete yellow highlighted cells.
Insert rows and columns as necessary, but please maintain the format as much as possible.
CLIN 0014Fringe Rate:Sub-TotalOverhead Rate:Sub-TotalG&A Rate:Sub-TotalProfit Rate:
30%20%8%7%
Labor CategoryDirect Labor RateFringeOverheadG&AProfitTotal price / FBLR
Example$ 25.25$ 7.57$ 32.83$ 6.57$ 39.39$ 3.15$ 42.54$ 2.98$ 45.52
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0

Option CLIN 0004

0004Systems 2 DeliveryDelivery of FY25 systems (Qty 1 to 60)Optional CLINStep Ladder Range 1Step Ladder Range 2Step Ladder Range 3Step Ladder Range 4Step Ladder Range 5
FromToFromToFromToFromToFromTo
PricePricePricePricePrice
Doing Step Ladder pricing is optional.

File details come from the government source that posted it. Updated .