Attachment_6_-_Pile_Driving_Report_Form.pdf

PDF 117 KB Posted

Attached to
Navigational Aid Repair Project
Solicitation number
2026-QQ-644
Issued by
Sarasota County, Siesta Key CDP, Florida

About this file

This is a Pile Driving Report Form attachment related to Sarasota County, Florida's Navigational Aid Repair Project. The form serves as the official documentation template for contractors to record detailed information about pile driving installations associated with navigational aid marker replacements within County waterways. The form captures project-specific data including the project name, contractor information, and installation date, along with detailed specifications for each marker installation such as marker identification numbers, geographic coordinates (latitude/longitude), piling type and length, driving methodology, pile embedment depth, substrate composition, water depth at installation location, equipment utilized, and the length of excess pile material removed. The form requires certification by the responsible party, affirming the accuracy and completeness of all recorded information. The document was last updated on March 24, 2023.

The form is designed to accommodate multiple marker installations through repeating rows for data entry, allowing contractors to document up to three separate pile driving operations within a single report submission. Each entry row maintains the same comprehensive data fields to ensure consistent and standardized documentation across all navigational aid installations. The form includes a signature line and date field for contractor certification, establishing accountability for the accuracy of reported pile driving specifications and installation parameters. This documentation serves as the official record-keeping instrument for the County's navigational aid marker replacement project that requires completion within thirty days of the Notice to Proceed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pile Drive Report Project Name

Contractor

Installation Date

Marker ID Lat/Long Piling Type/Length Driving Method Pile Embedment

Depth

Substrate Water Depth Equipment Used Length of Excess Pile Removed

Marker ID Lat/Long Piling Type/Length Driving Method Pile Embedment

Depth

Substrate Water Depth Equipment Used Length of Excess Pile Removed

Marker ID Lat/Long Piling Type/Length Driving Method Pile Embedment

Depth

Substrate Water Depth Equipment Used Length of Excess Pile Removed

I certify that all the information above is to the best of my knowledge and belief true, correct, and complete.

Signature Date

Last Updated: March 24, 2023

Project Name:
Contractor:
Installation Date:
Marker IDRow1:
LatLongRow1:
Piling TypeLengthRow1:
Driving MethodRow1:
Pile Embedment DepthRow1:
SubstrateRow1:
Water DepthRow1:
Equipment UsedRow1:
Length of Excess Pile RemovedRow1:
Marker IDRow1_2:
LatLongRow1_2:
Piling TypeLengthRow1_2:
Driving MethodRow1_2:
Pile Embedment DepthRow1_2:
SubstrateRow1_2:
Water DepthRow1_2:
Equipment UsedRow1_2:
Length of Excess Pile RemovedRow1_2:
Marker IDRow1_3:
LatLongRow1_3:
Piling TypeLengthRow1_3:
Driving MethodRow1_3:
Pile Embedment DepthRow1_3:
SubstrateRow1_3:
Water DepthRow1_3:
Equipment UsedRow1_3:
Length of Excess Pile RemovedRow1_3:
Date:

File details come from the government source that posted it. Updated .