This is a Performance Work Statement (PWS) for testing and inspection services of fire extinguishers, fire-rated doors, and panic hardware at USAG Italy DMC in Livorno, Italy, effective February 4, 2026.

The Contractor shall provide non-personal services including personnel, equipment, supplies, facilities, transportation, tools, materials, and supervision necessary to perform semi-annual and scheduled maintenance services on fire safety equipment in compliance with UNI 9994-1/2 and NFPA standards. For fire extinguishers, the Contractor must perform semi-annual inspections (Controllo periodico), scheduled services (Revisione programmata), supply replacement units for expired or damaged equipment, and provide waste disposal documentation. Fire-rated doors require inspection of hinge tightness, seal integrity, crack verification, and magnetic unlocking system efficiency per UNI 11473-1 and NFPA standards. Panic hardware must be inspected for device integrity, calibrated and lubricated for smooth operation, and certified for compliance per UNI EN 1125 and UNI EN 179 standards. The Contractor must submit a digital Check Log (Registro dei Controlli) within seven working days after each inspection identifying all items by serial number or location, noting discrepancies and work completed. Contractor personnel must be qualified per D.M. 01.09.2021 "Decreto Controlli." The Government will provide electricity and water at no cost. Performance standards require 100% compliance for all three service categories. The contract structure includes a base year plus four option years, with work performed at Camp Darby and PASA Area near Livorno/Pisa and Depot Area. Key deliverables include a Quality Control Plan (within 10 days), Work Plan (within 60 days), Installation Pass Log, safety documentation per Italian D.Lgs. n.81/2008, Anti-Terrorism and OPSEC training certifications, and periodic progress meeting minutes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version – September 2024 Page 1 of 36

PERFORMANCE WORK STATEMENT (PWS)

Testing and Inspection of fire extinguishers, fire rated doors and panic hardware

O&M Building and Grounds

USAG Italy DMC Livorno

4 February 2026

Version – September 2024 Page 2 of 36

Part 1

General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personal service contract to provide technical assistance services for Testing and Inspection of Fire Extinguisher, Fire Rated Door and Panic Hardware at USAG Italy DMC.

1.2 Background: The contract has been performed by a contractor over the past three years under a base year + two option years structure. This is necessary to ensure that Fire Extinguisher, Fire Rated Door and Panic Hardware at USAG Italy DMC remain in compliance with both Italian and U.S. regulations.

1.3 Scope: The Contractor shall provide non-personal service. The contractor shall provide personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in this PWS and associated contract document.

1.4 Objectives: The contractor shall perform the service in strict compliance with the terms and conditions of this contract, the PWS and any attachments and technical exhibits, and the latest applicable Italian, NFPA and European Standards, Laws and Regulations.

1.5 General Information:

1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.

The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within recommend ten (10) days after the date of contract award (Deliverable # A.001).

The Government (COR, Quality Assurance Specialist, and KO) will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within ten (10) days. If the Government has provided comments, the Contractor shall then have ten

(10) days to submit a Final QCP. After receipt of the Final QCP, the Contractor will receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the KO (through the COR) no later than 30 days prior to the anticipated change and before implementation by the Contractor. The timeline noted

Version – September 2024 Page 3 of 36 above will apply for review and acceptance for proposed changes. At a minimum, the QCP shall include and answer the following to be acceptable:

a. A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.

b. How the Contractor will monitor work to ensure that performance complies with all deliverables (timelines, deadlines, goals, etc.)

c. How the Contractor will monitor work to ensure that performance complies with all specifications and requirements of the contract, including clauses.

d. How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance.

e. How the Contractor will ensure all keys issued will remain controlled items (Paragraph 1.15 Key Control).

f. How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future.

g. How the Contractor will file and save all Quality Control related documents for the life of the contract period of performance. (Base Year + 4 Option years)

1.5.1.1 Optional addendum to the QCP: Reserved

1.5.1.2 Quality Issues: The Contractor shall inform the COR of issues or potential issues that might affect the performance within 5 working hours of identifying those issues. Verbal reports shall be followed up by written reports within 2 workdays. (Deliverable # A.002).

1.5.1.3 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.6 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)

deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.

1.6.1 U.S. Holidays: Work shall not be performed on U.S. holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S holiday occurs on

Version – September 2024 Page 4 of 36 a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1st M. L. King Da 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Labor Day 1st Monday in September Independence Day July 4th Veteran’s Day November 11th Columbus Day 2nd Monday in October Thanksgiving Day 4th Thursday in November Christmas Day December 25th

1.6.2 Host Nation Holidays: Work shall not be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.

New Year’s Day January 1st Epiphany (Three Kings Day) January 6th Easter Sunday Easter Monday Liberation Day April 25th International Worker’s Day May1st Republic Day June 2nd Assumption Day August 15th All Saints’ Day November 1st Immaculate Conception December 8th Christmas Day December 25th St Stephen’s Day December 26th

1.7 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

Version – September 2024 Page 5 of 36

1.7.1 Government Facility Office Hours: The Government facility office hours are hours 07:00 to 17:00, and days Monday through Friday except U.S. holidays identified in paragraph 1.6.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.7.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 08:00 to 17:00, Monday through Friday. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.

1.7.3 Contractor Support Hours: The Contractor shall provide support between the hours of 08:00 17:00, Monday through Friday. The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. For other than firm fixed price contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons.

1.8 Contractor Work Plan: Prior to commencing and executing the required testing and inspection services the Contractor shall prepare and maintain a Work Plan for the scheduled activities under PWS Part 5. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.) The Contractor’s proposed Work Plan shall be submitted to the Contracting Officer through the COR for review within 60 days after the obtaining of entry passes (Deliverable A.003). The Government will review and either accept or return their comments to the Contractor within ten days. The Contractor shall then have 3 days to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted to the COR for review and acceptance by the Contracting Officer at a minimum thirty (30) days prior to implementation. The timeline noted above shall apply for review and acceptance for proposed changes.

1.9 Military Work Schedule: The military work schedule may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants (through the COR) will be necessary or the work in affected facilities shall be rescheduled.

1.10 Place of Performance: The work to be performed under this contract will be performed at Camp Darby USAG Italy DMC located in Livorno/Pisa in Depot Area, Camp Darby Area and Pasa Area.

1.11 Security Requirements: The following information is provided on security related matters.

1.11.1 Security Program: Reserved

1.11.2 Personnel Security Clearance Requirements: Reserved

1.11.3 Background Checks: Reserved

Version – September 2024 Page 6 of 36

1.11.4 United States Citizen: Reserved

1.11.5 Local Nationals and Third Country Nationals: Reserved

1.12 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13)

1.12.1 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the general public.

1.13 Installation Access: Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with Army in Europe (AE) Regulation 190-16 (AE Reg 190-16) Installation Access Control or (AE) Regulation 604-1 for Italy specific contracts, will be grounds for denying access to U.S. installations and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. Should anything in this paragraph conflict with AE Reg 190-16 or (AE) Regulation 604-1, the regulation takes precedent.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.

The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

AE Reg 190-16 can be found on the following website:

https://media.defense.gov/2017/Apr/27/2001921546/-1/-1/0/AER190-16.pdf

1.13.1 Installation Pass Log: The Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within 10 calendar days after contract award. The log must at a minimum contain the data of any person (Name, Surname) and the related expiration date.

The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log (Deliverable # A.004).

1.13.2 Installation Pass Collection: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within 10 calendar days (Deliverable # A.005).

https://media.defense.gov/2017/Apr/27/2001921546/-1/-1/0/AER190-16.pdf

Version – September 2024 Page 7 of 36

1.14 Common Access Cards (CAC): Reserved

1.14.1 CAC Log: Reserved

1.15 Key Control: Reserved

1.16 Post Award Conference: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5 and Army Regulation 70-13. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the Contractor of how the Government has assessed the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.16.1 Periodic Progress Meetings: The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.

Meetings may end outside of regular duty hours. The Contractor shall submit meeting minutes notes to the COR for review within ten (10) days after the day of the meeting, (Deliverable # A.006). The COR will review and either notify the Contractor in writing of acceptance of the meeting minutes or return with their comments to the Contractor within ten (10) days. If the Government has provided comments, the Contractor shall have ten (10) days to submit a Final meeting minutes.

1.17 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the KO, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the KO. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel. To ensure proper oversight, the Contracting Officer (KO) may appoint multiple Contracting Officer Representatives

Version – September 2024 Page 8 of 36

(CORs). In cases where multiple CORs are appointed, each will receive an appointment letter specifying their unique roles and responsibilities.

1.18 Key Personnel: The following personnel are considered key personnel by the Government:

Program/Contract Manager/Alternate. The Contractor shall provide a Contract Manager (CM) who shall be responsible for the performance of the work. The name of this person and an Alternate Contract Manager (ACM), who shall act for the Contractor when the CM/ACM is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be submitted in writing to the KO via the COR, no later than ten (10) days after contract award. (Deliverable # A.007). The CM and ACM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The CM or ACM shall be available between Mondays through Friday 0800-1700 HRS. The contractor shall submit thirty (30) calendar days' written notice to the KO, through the COR, before removing or replacing any key personnel on this contract. Proposed substitutes shall have the same equivalent characteristics, experience, and credentials. The contractor shall notify (in writing) the KO through the COR no later than ten (10) days after change of personnel (Deliverable # A.008) calendar days prior to any scheduled substitution. The written notification shall include a justification. Qualifications for all key personnel are listed below:

a. Contract Manager and Alternate Contract Manager: The CV provided by the Contract Manager and Alternate Contract Manager must demonstrate English LEVEL 1 Knowledge and 4 years of specialized experiences within the technical skills object of this service.

1.19 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.19.1 Contractor’s Workspace: Reserved

1.19.2 Contractor Identification: The Contractor shall provide each of their employees an easily readable identification. The badge shall include the employee’s name, the contractor’s company name, the functional area of assignment. Companies with U.S. Government contracts shall require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee.

A listing of issued ID cards shall be furnished to the COR prior to the contract performance date and updated as needed to reflect Contractor personnel changes, (Deliverable # A.009).

1.20 Contractor Travel: Reserved

1.21 Other Direct Costs (ODCs): Reserved

Version – September 2024 Page 9 of 36

1.22 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.23 Non-Disclosure Requirements: Reserved

1.23.1 Non-Disclosure Statements: Reserved

1.24 DoD Commercial Use of Imagery Guidelines: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/, the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.

1.25 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI (Deliverable # A.010). The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.26 Phase In /Phase Out Period: Reserved

1.27 Safety: The following provides information pertaining to Safety and Accident Prevention:

Contractor shall be aware of local safety requirements and ensure that all reasonable efforts are made to protect all persons from harm and U.S. Government property from damage. The contractor shall furnish all equipment, safety clouting and PPEs to protect workers during all work phases. As per D.Lgs n.81/2008 requirements, the contractor shall provide to the COR the following documents:

- copy of DUVRI/Safety Plan (in accordance with D.Lgs n.81-2008);

- C.C.I.A.A. Certificate;

- Declaration which attest the use of equipment and tools “CE” marked, included their list;

- List of DPIs provided to the workers;

- Operator’s qualifications: in accordance with D.M. 01.09.2021 “Decreto controlli”;

http://www.dimoc.mil/resources/limitations/

Version – September 2024 Page 10 of 36

- DURC;

- Copy of owner’s certification about “Dichiarazione di non essere oggetto di provvedimenti di sospensione o interdittivi di cui all’art.14 del D.Lgs n.81-2008”.

The above documents shall be provided to the COR within 10 days after contract award (Deliverable # A.011).

1.27.1 Host Nation Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S.

Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)), and applicable Host Nation Safety Laws and Regulations.

The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:

a. Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel The above documents shall be provided to the COR within 10 days after contract award (Deliverable # A.012). Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.

b. Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1).

c. The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.

d. The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within 15 calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than 15 calendar days prior to initiation of work on each major phase.

e. In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:

i. Short sleeve shirt.

ii. Long trousers.

iii. Steel-toed safety boots.

Version – September 2024 Page 11 of 36

iv. Hard hat.

1.27.2 Accident Prevention: In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal, State and Local requirements governing safety and health protection on construction sites and any other applicable occupational safety codes. The Contractor shall coordinate all work at the site, including development of plans and providing advance notices.

The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For the compliance with host nation laws and regulations, the Contractor shall comply with the non-exclusive list of duties described in this paragraph. If the Contractor determines that additional activities are required to fully comply, the Contractor shall ensure that compliance with the laws is complete. The duties include:

a. Conditions of construction and operational activities to be considered include but are not limited to:

i. For all construction activities meeting the following criteria: the work is scheduled to last longer than 30 working days and more than 20 workers are occupied simultaneously, or the volume of work is scheduled to exceed 500 person days, or the work presents particular tasks, e.g. excavations deeper than 5 meters, falls from a height of greater than 7 meters, exposures to hazardous chemical or biological substances, work at less than 5 meters from high voltage lines, underground earth works or tunnels, danger of drowning, diving, use of compressed air, work with ionizing radiation, explosives, or work involving assembly or dismantling of heavy prefabricated components (10 tons or greater).

b. The Contractor shall prepare a Safety and Health Protection Plan (SIGE) as required. The SIGE shall be submitted two weeks prior to mobilization. In addition, the Contractor shall appoint a qualified Safety Coordinator who will ensure that safety measures are implemented during construction. The Safety Coordinator must meet minimum training and experience requirements required under Host Nation laws.

c. The SIGE will be written in a comprehensive form and explained in language the workers understand and shall contain the following minimum information:

i. Maintenance of tools and equipment.

ii. Provisions for the storage and disposal of materials and waste, particular hazardous materials and substances.

iii. Modifying performance periods for such work, taking into consideration the site conditions.

iv. Organizing cooperation between different employers and Contractors without employees.

Version – September 2024 Page 12 of 36

v. Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed and taking into consideration the instructions and advice of the coordinator as well as safety and health plans.

1.27.3 Safety Notifications: Reserved

1.27.4 Italian Safety Law Decreto Legislativo (DLGS) 81/2008 art 26: This project falls under the provisions of Italian Safety Law DLGS 81/2008 art.26. The Contractor shall submit to the COR all the information “Suitability of contractor for service contracts – MD0266”, paragraph B2 and B3, within fifteen (15) days after award, for the preparation of the DUVRI by the Italian Safety Office, in accordance with the Italian regulation above. (Deliverable # A.013).

1.28 Environmental Compliance Plan and Program: Reserved

1.28-1 Hazardous Material / Substances: Reserved

1.28-2 Contract Completion: Reserved

1.28-2 Contract Clean-up: Reserved

1.29 Required Training:

1.29.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within ten

(10) days (Deliverable # A.014) after contract award date or effective date of incorporation of this requirement into the contract, whichever applies, or ten (10) days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion (Deliverable # A.015) for each affected Contractor employee and subcontractor employee to the COR (or to the KO, if a COR is not assigned) within ten (10) days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training (Deliverable # A.016) every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies.

If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be submit to the COR within ten

(10) days after completion of the training (Deliverable # A.017)

1.29.2 OPSEC Training: IAW AR 530-1, All Contractor employees, including subcontractors, shall complete Level I OPSEC training within ten (10) days of employment under this contract (Deliverable # A.018) after contract award date. Verification of the training shall be submitted https://jkodirect.jten.mil/

Version – September 2024 Page 13 of 36 to the COR within ten (10) days after completion of the training (Deliverable # A.019). OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel shall complete refresher training (IAW AR) (Deliverable # A.020) Verification of the training shall be submitted to the COR within ten (10) days after completion of the training (Deliverable # A.021).

If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training.

Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be submitted to the COR within ten (10) days after completion of the training (Deliverable # A.022).

1.29.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Anti-Terrorism Officer). This training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within ten (10) days after the contract is awarded and within ten (10) days after new employees commence contract performance, with the results reported to the COR within ten (10) days after the contract is awarded and within ten (10) days after new employees commence contract performance (Deliverable # A.023). Verification of the training shall be submit to the COR within ten (10) days after completion of the training (Deliverable # A.024).

Training slides can be found on the

Defense Visual Information Distribution Service website:

https://www.dvidshub.net/video/583923/iwatch-2018.

1.29.4 Information Assurance (IA) Training: Reserved

1.29.4.1 Cyber Awareness Training: Reserved

1.29.4.2 Information Technology (IT)/IA: Reserved

1.29.4.3 Army Training Certification Tracking System (ATCTS): Reserved

1.29.4.4 Network Access Training: Reserved

1.29.5 Personally Identifiable Information (PII): Reserved

1.29.6 Threat Awareness and Reporting Program (TARP): Reserved

1.30 Notice to Proceed: Reserved

1.31 Electromagnetic Compatibility Directive: The Contractor certifies that all electrical and electronic equipment and appliances furnished are in compliance with the Electromagnetic Compatibility Directive 2014/30/EC. Any penalties for noncompliance imposed by the Government of the European country where the equipment or appliances are delivered, or http://www.cdse.edu/catalog/elearning/GS130.html https://www.dvidshub.net/video/583923/iwatch-2018

Version – September 2024 Page 14 of 36 product liability claims caused by interference generated by furnished appliances or equipment are the sole responsibility of the Contractor.

1.32 Government Property and Services: Reserved

1.32.1 Incidental Property: Reserved

1.33 Conventional Forces Europe (CFE) Treaty Verification Inspection: Reserved

Version – September 2024 Page 15 of 36

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms:

2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.

Contracting Officer (KO) – means a person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government.

Note: The only individual who can legally bind the Government.

Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. Department of Defense Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, contracting officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line-item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2- 2g, states, in part, the following when providing support personnel to assist the COR, “These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the KO as alternate CORs.”

Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

Contractor-acquired property – means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract, and to which the Government has title.

Day – means, unless otherwise specified, a calendar day.

Defective Service – means service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable – means anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

Government-furnished property – means property furnished to the contractor the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes https://www.acquisition.gov/dfars/part-202-definitions-words-and-terms#DFARS_202.101

Version – September 2024 Page 16 of 36

Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

Government property – means all property owned or leased by the Government. Government property includes both Government-furnished property and Contractor-acquired property.

Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Industrial Property Management Specialist (Property Administrator) – means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.

Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.

Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.

Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however, they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.

Version – September 2024 Page 17 of 36

Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

Workday – The number of hours per day the Contractor provides services in accordance with the contract.

Work Week – Monday through Friday, unless otherwise specified.

2.2 Acronyms: Although not inclusive of every term used within this PWS, the following provides a list of acronyms used throughout this PWS or commonly used in the acquisition field.

ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AQL Acceptable Quality Level AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf CS/KS Contracting Specialist DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DISS Defense Information Security System DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IACS Installation Access Control System IACO Installation Access Control Office ID Identification IGE Independent Government Estimate IT Information Technology

Version – September 2024 Page 18 of 36

JTR Joint Travel Regulation KO/CO Contracting Officer MP ICAM Mission Partner Identity and Access Management OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PDF Portable Document Format PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SETAF-AF Southern European Task Force, Africa SIGE Safety and Health Protection Plan STD Standard TE Technical Exhibit USAREUR-AF U.S. Army Europe - Africa UOM Unit of Measure

Version – September 2024 Page 19 of 36

PART 3

GOVERNMENT PROPERTY (GP) AND SERVICES

3. Government Property and Services:

3.1 Services: Reserved

3.2 Facilities: Reserved

3.3 Utilities: The Government will provide all utilities in the facility that will be available for the contractor’s use in performance of the tasks outlined in the PWS. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves, light switches, etc. after using the required amount to accomplish tasks requiring the use of the utilities.

3.4 Equipment: Reserved

3.5 Special Tooling and Test Equipment: Reserved

3.6 Materials: Reserved

Version – September 2024 Page 20 of 36

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Property and Services

4.1 General: The Contractor shall furnish all personnel, supplies, facilities, transportation, tools, material, supervision, and other items necessary to perform services as described in the PWS and associated contract documents.

4.2 Secret Facility Clearance: Reserved

4.3 Materials: Reserved

4.4 Vehicles and Equipment: Reserved

Version – September 2024 Page 21 of 36

PART 5

SPECIFIC TASKS

5.1 Basic Services: The Contractor shall provide services in accordance with this specific task as detailed at below points, providing test and inspection of fire extinguisher, fire rated door and panic hardware at USAG Italy DMC.

5.2. Tasks:

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract document. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.

5.2.1 Description of Service

5.2.1.1 Fire Extinguishers: This requirement consists of managing and performing the maintenance and recharge services of fire extinguishers, consisting of powder fire extinguishers, carbon dioxide fire extinguishers, kitchen foam fire extinguishers and wheeled foam fire extinguishers, for the above-mentioned sites.

5.2.1.1.1 When performing the scheduled Inspection and Testing Services on the Fire Extinguishers listed in the inventory (Attachment 1) the contractor shall obey UNI 9994-1/2 norm and correlated regulations or NFPA regulations. UNI 9994-1/2 provides for three phases to be accomplished:

5.2.1.1.1.1 First check (Controllo)

5.2.1.1.1.2 Semi-annual service (Controllo periodico)

5.2.1.1.1.3 Scheduled Service (Revisione programmata)

5.2.1.1.1.4 Supply (Fornitura)

5.2.1.1.2 The contractor shall perform the Semi-annual service (Controllo periodico), Scheduled Service (Revisione programmata) and Supply (Fornitura) upon need. If the fire extinguisher must be disposed of, because expired or damaged and/or recharged, the Contractor will provide the disposal in accordance with the Regional and National Regulation according to the typology of the related material and the replacement of it. The fourth copy of Waste Manifest (Formulario dei rifiuti) used for the disposal to the landfill shall be submitted to COR.

Included in the maintenance service are the extra fire extinguishers stored at DPW Supply, Bldg.5156 Depot area (see Inventory, Attachment 1).

After verifying the number, serial number, model, date, and location of the fire extinguishers through the creation of a detailed list following the initial inspection, the contractor shall supply replacement units for all fire extinguishers that have reached end of life, ensuring their proper

Version – September 2024 Page 22 of 36 installation in place of the existing ones. For discharged fire extinguishers, Scheduled Service (Revisione programmata) shall be carried out, including full maintenance and refilling.

During the above services no location/building can be left without fire extinguisher.

5.2.1.2 Fire Rated Doors: While performing the Scheduled Inspection and Testing Services on the Fire Rated Doors listed in the inventory (Attachment 1) the contractor shall obey manufacturer’s instructions, as prescribed by UNI 11473-1 norm, NFPA Norms and correlated regulations. In particular he/she shall as a minimum:

5.2.1.2.1 Check the tightness of the hinges;

5.2.1.2.2 Verify the tightness of the seals;

5.2.1.2.3 Verify the absence of cracks;

5.2.1.2.4 Check the efficiency of the magnetic unlocking systems and the correct self-closing.

5.2.1.3 Panic Hardware: When performing the Inspection and Testing Services on the Panic Hardware listed in the inventory (Attachment 1) the contractor shall obey manufacturer’s instructions, as prescribed by UNI EN 1125 and UNI EN 179 norms, NFPA norms and correlated regulations. In particular, he/she shall as a minimum:

5.2.1.3.1 Check the integrity of the device in all its parts;

5.2.1.3.2 Calibrate and lubricate the Hardware in order to obtain a smoothly operating procedure;

5.2.1.3.3 Check the presence of the certification of compliance.

5.2.1.4 Check Log: at the completion of the first semi-annual inspection/testing service the contractor shall provide the digital copy of Check Log (Registro dei Controlli) for each building within at least seven (7) working days after the testing/inspection is completed (Deliverable # A.025). The database shall identify the number of fire extinguishers / fire rated doors / panic hardware, their serial number or location, report any discrepancies, impairments or work accomplished for each item and the description of condition in which items are left after inspection.

This logbook shall be updated with each semi-annual inspection/testing services and a digital copy provided to the COR.

5.2.1.5 Note: In the event that the check log reports a deficiency, the Government will accomplish the repair and consequently, during the week following the repair work, Contractor shall perform a second check of the repaired item.

5.2.1.6 Attachment 1 – Inventory provides the location by building number, the type and the quantity of the fire extinguishers, fire rated doors and panic hardware to be serviced under this contract. This information is provided to allow the contractor to properly estimate the size of the

Version – September 2024 Page 23 of 36 equipment installed for each building. The buildings involved in the service are located at Camp Darby and PASA Area, Via Vecchia Livornese, 788, 56128 Pisa (Tirrenia), Italy and at Depot, Via Aurelia, Tombolo 57128 Pisa.

For increases or decreases within 10% of the total fire extinguishers, fire rated door and panic hardware which are related to this inventory, no modification of the contract will be issued.

5.2.2 If the FFDD identifies any deficiencies or non-compliance with the applicable laws during its inspections, the contractor shall take corrective action within two (2) working days following the notification of the deficiency by COR mail.

5.3 Qualifications:

The contractor shall provide qualified personnel who meet the minimum…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .