Attachment 6 KTR Surveillance Checklist for Placement and Removal of a ROB.pdf
PDF 45 KB Posted
- Solicitation number
- SP4500-22-R-0022
- Issued by
-
Defense Logistics Agency
About this file
This solicitation seeks proposals for hazardous and nonhazardous waste removal, transportation, and disposal services for the Defense Logistics Agency in the Great Lakes region. Offerors must be 8(a) small businesses. Services include pickup from locations listed in Attachment 3. The base period of performance is 30 months from January 2023 to July 2025 with an optional 30-month extension. Proposals are due by October 31, 2022 and shall be emailed to the points of contact listed. Pricing details are in Attachment 2 and the performance work statement is in Attachment 1. The incumbent contractor(s) are not identified. Questions are due by October 16, 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Price Schedule.xlsx | XLSX spreadsheet | |
| Evaluation Factors.pdf | ||
| Instructions to Offerors.pdf | ||
| Attachment 1 Great Lakes PWS.docx | DOCX document | |
| Attachment 2 Price Schedule.xlsx | XLSX spreadsheet | |
| Contract Terms and Conditions.pdf | ||
| Attachment 4 Past Performance Questionnaire.pdf | ||
| Attachment 5 KTR Work Surveillance Checklist - ICS Work.pdf | ||
| Attachment 3 Pick-up Points.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Work Surveillance Checklist
Placement or Removal of Empty Rented Rolloff Box (ROB) or Vacuum Box
Date(s) of Work Surveillance: _________________ Start Time: ___________ Stop Time: ___________
Contract Number: SP4500-______-D-___________ TO #: ________________ CLIN: ______________
Name of Designated Government Representative: ___________________________________________
Title of Designated Government Representative: ____________________________________________
Phone Number of Designated Government Representative: (______) _______-___________ Ext.______
Yes No N/A Description of Contractor Work Surveillance: [ROB] or [Vac Box] (Circle one)
Did the Contractor arrive on site at the scheduled time and date?
Did the Contractor arrive on site with all of the requisite equipment, including
- One ROB or Vacuum Box container of the appropriately ordered size, with
- One plastic liner of sufficient size and thickness to adequately contain the waste for which it was intended (ROB only), and
- One watertight tarp cover that was generally free of rips and tears (ROB only)?
Does the Contractor have an approved weight ticket showing the empty (tare) weight of the container?
Was the container inspected by a Designated Government Representative upon arrival at the designated location?
Was the container of acceptable appearance and integrity, with minimal evidence of corrosion, visibly void of waste residue and legible/offensive graffiti upon delivery?
Was the ROB, bows and cover free of any defects or damage, other than those attributable to normal wear and tear, and determined acceptable for Government use? Please document below any noteworthy defects or damage and have driver initial for acknowledgment.
Note: Failure of the driver to acknowledge any existing noteworthy defects or damage will be cause for rejection of the ROB and liner.
Did the equipment operate properly without causing a delay in work?
Was the work performed safely and did the equipment meet the satisfaction of the Designated Government Representative?
Comments:
Signature of Designated Government Representative Date
File details come from the government source that posted it. Updated .