Attachment 6 - HAFB Environmental Analysis.pdf
PDF 3 MB Posted
- Attached to
- Hill AFB, UT CMCC Demolition services Federal contract opportunity
- Solicitation number
- W9123822Q0030
About this file
This solicitation is seeking demolition services at Hill Air Force Base in Utah. Offerors must submit all questions by September 5th, 2022. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Sacramento for demolition work at the CMCC facility on Hill AFB. Seven appendices are included to provide additional relevant details for offerors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Photos_ Building 522.pdf | ||
| Photos_ Building 521.pdf | ||
| Photos_ Building 526.pdf | ||
| Photos_ Building 483.pdf | ||
| Photos_ Building 1229.pdf | ||
| Photos_ Building 1836.pdf | ||
| Attachment 2 - Technical Specifications.pdf | ||
| Attachment 1 - HAFB Fugitive Dust Control Plan.pdf | ||
| Attachment 4 - Architectural Demolition Drawings.pdf | ||
| Solicitation.pdf | ||
| Attachment 3 - Civil Demolition Drawings.pdf | ||
| Attachment 5 - Required Airfield and MSA Seed Mix.pdf | ||
| Attachment 7 - HAFB Facility Design Standard.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIGNATURE:
PREPARED BY: Casey Devlin (ASB#-6734, PB#-2550)
DEMOLISH FACILITY
ORGANIZATION:
REQUESTED:
10960380
JAMES MORRIS
THE QUANTITIES WITHIN THIS REPORT ARE ESTIMATES AND SHOULD
NOT BE USED FOR BIDDING PURPOSES
75 CEG
FACILITY CONSTRUCTION DATE:
DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
LEAD BASED PAINT
ASBESTOS
INSPECTION REPORT
Utah Certified State Inspector: Taylor Brimberry
(ASB#-6727: Expires-17 September 2022, PB#-2546: Expires-6 Nov. 2022)
INSPECTION DATE: 07 February 2022
Reference UDAQ R307-807-6
WORK TASK/CAPITAL PROJECT #:
FACILITY:
REQUESTER:
31 January 2022
(This inspection is valid for three years from the inspection date regardless of Exp. Date of inspector cert. If past this date, a visual or additional assessment will then be required)
ASBESTOS
Assumed to
Contain
Asbestos
Assumed to
Contain
Asbestos
Assumed to
Contain
Asbestos
Assumed to
Contain
Asbestos
Assumed to
Contain
Asbestos
Assumed to
Contain
Asbestos
Assumed to
Contain
Asbestos
Assumed to
Contain
Asbestos
Throughout Building
Carpet Over 9" Floor
Tile Over Adhesive, Black
Non-Friable Category I 12,585 Throughout Building
Carpet Over 12"
Floor Tile Over
Adhesive, Black
Non-Friable Category I 1,490 Square
Feet Throughout Building
12" Floor Tile Over
Adhesive, Black Non-Friable Category I
640 Square
Feet Throughout Building
12" Floor Tile Over
9" Floor Tile Over
Adhesive, Black
Non-Friable Category I 65 Square
Feet Northeast Entry
Carpet Over
Adhesive, Yellow
Over Adhesive, Black
Non-Friable Category I 45 Square
Feet
Under Ground
Transite Pipe Non-Friable Category II Unknown Possible Under Ground Utilities
DEPARTMENT OF THE AIR FORCE
75 CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
MATERIAL TYPE
Throughout Building
*RACM
*Category I
*Category II
FRIABILITY QUANTITY
4,170 Square
Feet
ASBESTOS INSPECTION REPORT INFORMATION
This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by The Science and Engineering Laboratory (AIHA Acc.#-
101572) at Hill Air Force Base, Utah (R307-801-10.8.a-b).
9" Floor
Tile/Adhesive, Black
*LOCATIONS FOUND
Category INon-Friable
Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing materials (ACM) that could potentially be encountered in the proposed area/areas. The information gathered from all current and previous inspections is shown below by homogenous area (R307-801-9-4).
The quantities within this report are estimates and are not to be used for bidding purposes.
SUMMARY OF ASBESTOS CONTAINING MATERIALS FOUND
Thermal System Pipe
Fitting Insulation Friable RACM
131 Linear
Feet
Under Ground Utilities/Steam
Vault
DEMOLISH BUILDINGStatement of Work:
Assumed to
Contain
Asbestos
24%
Chrysotile
3%
Chrysotile
3%
Chrysotile
2%
Chrysotile
24%
Chrysotile/A mosite
Category I Non-Friable ACM: Asbestos-containing packings, gaskets, resilient floor coverings, or asphalt roofing products containing more than 1% asbestos as determined by using the method specified in 40 CFR Part
763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM).
Thermal System Pipe
Insulation, Cloth, White
Friable RACM 30 Linear Feet Attic Above North Half Men's and Women's Restroom
*Per UDAQ definition.
Per EPA requirements, all materials analyzed as containing ≤10% asbestos are point counted utilizing EPA method 600/R-93/116 this information is summarized in Table 2.
Table 1
Roof Flashing, Black Non-Friable Category I 20 Linear Feet Fire Riser Roof
Heavy Paint, Tan
Over Concrete Non-Friable Category II
15,100
Square Feet Building Exterior
Fire Door Insulation, White Friable RACM
80 Square
Feet Fire Break Door
Heavy Paint, Tan
Over Brick Non-Friable Category II
2000 Square
Feet Building Exterior
Heavy Paint, Brown
Over Concrete Non-Friable Category II
2,175 Square
Feet Building Exterior
RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.
Locations found: Locations of building materials as described in this report indicate where they were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project.
Category II Non-Friable ACM: Any material, excluding Category I non- friable ACM, containing more than 1% asbestos as determined by using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Roof Decking, BlackRoof Sealant, Grey
Wall Batt Insulation, Foil Over Pink Wall Batt Insulation, Yellow
2'x4' Ceiling Tile, Wormygrooves/Pinholes Pattern, White
Table 3.
Ceiling Batt Insulation, Pink
Ceiling Batt Insulation, Brown Over Pink Ceiling Batt Insulation, Foil Over Yellow
Flex Duct Insulation, Black Over Pink Flex Duct Insulation, Black Over Yellow
Plaster Ceiling System, White Over Tan
Wall Board, White Over Brown Drywall/Joint Compound Wall System
MATERIAL TYPE
Per Hill AFB requirements, all materials containing any detectable amount of asbestos shall be handled as Asbestos Containing Material (ACM). Table 2 shows the summary of materials containing ≤1% that were identified via "Point Counting". Per EPA/UDAQ
≤1% is not considered to be an asbestos containing material, but special handling/packaging requirements are necessary per OSHA 29CFR 1926.1101 and
29CFR 1910.1001
QUANTITY
Drywall/Joint Compound Ceiling System
The following is a list of the "Suspect Materials" that were sampled as part of this inspection:
≤1% Chrysotile
Thermal System Pipe Insulation, Lagging White Over Yellow Thermal System Pipe Insulation Saddle, White, Thermal System Pipe Insulation, Cloth Over Yellow Thermal System Pipe Fitting Insulation, White Over Yellow
Drywall/Joint Compound Ceiling System, Multiple Locations Fire Door Insulation, White
Roof Batt Insulation, Foil Over Pink
Roof Shingle, Brown Over Paper, Black Roof Flashing, Black
Table 2.
ASBESTOS
Duct Insulation, Foil Over Yellow Thermal System Pipe Insulation, White Over Yellow
Plaster Wall System, Off-White Over Tan
2'x4' Ceiling Tile, Wormygrooves/Pinholes Pattern, Off-White
2'x4' Ceiling Tile, Pockmarks/Pinholes Pattern, White, 2'x4' Recessed Ceiling Tile, Pockmarks/Pinholes Pattern, White
2'x2' Ceiling Tile, Pockmarks Pinholes, White, 2'x2' Recessed Ceiling Tile, White, 2'x2', Ceiling Tile, Smooth Pattern, White Wood Over Fire Door Insulation
12" Acoustical Ceiling Tile, Wormygrooves/Pinholes Pattern, White Over Puck, Black
Heavy Paint, Tan Over Concrete Heavy Paint, Tan Over Brick
Heavy Paint, Brown Over Concrete Wall Coating, Black
Dock Sealant, Grey Over Yellow, Window Sealant, Black
Duct Sealant, Yellow Duct Sealant, Grey
Duct Sealant, Green, Vibration Collar, Black
Drywall/Joint Compound Wall System ≤1% Chrysotile 34,650
Square Feet Multiple Locations
*LOCATIONS FOUND
550 Square
Feet Multiple Locations
A total of 186 43
GM220562 Northeast None-Detected
GM220563 Southeast None-Detected
GM220560 Northwest
GM220559
North Center, North Fire
Riser Shed 17% Chrysotile
The following table summarizes the sampling data.
Homogenous Building Material, Description, Location, Quantity.
GM220555
GM220557
Northeast, North Fire
Riser Shed 24% Chrysotile
GM220549 Northeast, North Half None-Detected
GM220550 Northeast, North Half None-Detected
GM220551 North Center, North Half None-Detected
None-Detected
GM220552 North Center, North Half None-Detected
East Center, North Half None-Detected
Southwest, South Half None-Detected GM220554
GM220564
ResultsSample Location
Northeast None-Detected
GM220553
GM220558
Northeast, South Fire
Riser Shed 21% Chrysotile
GM220556
Southeast, North Fire
Riser Shed 23% Chrysotile
Southeast, South Half
GM220567 Southeast, HTC2 1% Chrysotile VIA
Point Count
GM220568
1% Chrysotile VIA
Point Count suspect materials assessed as part of the inspection.
Sample # samples reference the
North Center, HTC4
GM220565 East Center, HTC1 2% Chrysotile VIA
Point Count
None-Detected
GM220561
GM220566 South Center, HTC3 3% Chrysotile VIA
Point Count
West Center, HTC7 1% Chrysotile VIA
Point Count
Roof Decking, Black, South Fire Riser Shed 130
Square Feet
Heavy Paint, Tan Over Concrete, Exterior
Building, 13,100 Square Feet
Roof Flashing, Black, Multiple Roof Locations, 20 Linear Feet
Roof Sealant, Grey, South Fire Riser Shed Roof, 20 Linear Feet
GM220571 Northeast, HTB3 3% Chrysotile VIA
Point Count
GM220572 Southeast, HTB2 3% Chrysotile VIA
Point Count
Roof Shingle, Brown Over Paper, Black, Roof, 24,180 Square Feet
Northeast, HTC5 2% Chrysotile VIA
Point Count
GM220569 South Center, HTC6 2% Chrysotile VIA
Point Count
GM220570
GM220573 East Center, HTB1 3% Chrysotile VIA
Point Count
GM220574 Southeast, HBC1 2% Chrysotile VIA
Point Count
GM220575 Southeast, HBC2 2% Chrysotile VIA
Point Count
GM220576 Southwest, HBC3 1% Chrysotile VIA
Point Count
Heavy Paint, Tan Over Brick, Exterior
Building, 2,000 Square Feet
Heavy Paint, Brown Over Concrete, Exterior
Building, 2,175 Square Feet
GM220577 Northwest, Room 4 None-Detected
Dock Sealant, Grey Over Yellow, Exterior
Building, 1,200 Linear Feet
GM220578 Northeast, South Half None-Detected
GM220579 Southeast, North Half None-Detected
GM220580 Northeast, DS1 None-Detected
Wall Coating, Black, Multiple Locations, 10,400
Square Feet
GM220581 East Center, DS2 None-Detected
GM220582 Southeast, DS3 None-Detected
GM220583 Northeast, WS1 None-Detected
Duct Sealant, Yellow, Multiple Locations, 700
Linear Feet
GM220587 Southwest, WS3 None-Detected
GM220588 Northeast, Room 10 None-Detected
GM220589 Southeast, Room 10 None-Detected
Window Sealant, Black, Exterior Building, 800
Linear Feet
GM220584 Northwest, WS5 None-Detected
GM220585 East Center, WS2 None-Detected
GM220586 West Center, WS4 None-Detected
GM220590 East Center, Room 10 None-Detected
GM220591 Northeast, Room 20 None-Detected
GM220592 North Center None-Detected
Duct Sealant, Green, South Half Upper
Mechanical Room, 400 Linear Feet
GM220593 South Center None-Detected
GM220594 East Center None-Detected
GM220595 Southeast None-Detected
Duct Sealant, Grey, South Half Upper
Mechanical Room, 400 Linear Feet
GM220596 South Center None-Detected
GM220597 East Center None-Detected
GM220598 Center None-Detected
Flex Duct Insulation, Black Over Pink, Multiple
Locations, 600 Linear Feet
GM220599 Center None-Detected
GM220600 Northeast None-Detected
GM220601 Center, Room 14, D1 None-Detected
Vibration Collar, Black, South Half, Upper
Mechanical Room 80 Linear Feet
GM220602
South Center, Room 11, D3 None-Detected
GM220603 Center, Room 13, D2 None-Detected
GM220604
Southeast, South Half
Cubical Area None-Detected
Duct Insulation, Foil Over Yellow, Multiple
Locations, 2,500 Square Feet
GM220605
Northwest, South Half
Cubical Area None-Detected
GM220606
Southwest, South Half
Upper Mechanical Room None-Detected
GM220607
West Center, South Half
Upper Mechanical Room None-Detected
Flex Duct Insulation, Black Over Yellow, Multiple Locations, 600 Linear Feet
GM220608
South Center, South Half
Upper Mechanical Room None-Detected
GM220609
Southeast, South Half
Upper Mechanical Room None-Detected
GM220610 Northeast, Room 20 None-Detected
Southeast, South Cubical
Area None-Detected
GM220613
Northeast, South Half upper Mechanical Room None-Detected
Thermal System Pipe Insulation, White Over
Yellow, Multiple Locations, 3,500 Linear Feet
GM220617 West Center, Room 13, P4 None-Detected
GM220618 East Center Room 12, P5 None-Detected
GM220619
Northeast, South Half upper Mechanical Room None-Detected
GM220614 Southeast, Room 19, P1 None-Detected
GM220615 North Center, Hall, P2 None-Detected
GM220616 West Center, Room 20, P3 None-Detected
GM220611
Southeast, South Half
Upper Mechanical Room None-Detected
GM220612
GM220620
Southeast, South Half
Cubical Area None-Detected
GM220621
Center, Hall Outside Room
None-Detected
GM220622
Southeast, South Half
Upper Mechanical Room None-Detected
Thermal System Pipe Insulation, Lagging White
Over Yellow, Multiple Locations, 100 Linear
Feet
Thermal System Pipe Insulation Saddle, White, Multiple Locations, 150 Linear Feet
GM220626 South Center, Room 11A None-Detected
GM220627
Southeast, South Cubical
Area None-Detected
GM220628
Southeast, South Half upper Mechanical Room None-Detected
Thermal System Pipe Fitting Insulation, White
Over Yellow, Multiple Locations, 60 Linear
Feet
GM220623
Northeast, South Half upper Mechanical Room None-Detected
GM220624
Southeast, South Cubical
Area None-Detected
GM220625 West Center, Room 20, P3 None-Detected
GM220629
Northeast, South Half upper Mechanical Room None-Detected
GM220630
North Center, Main Hall, North Half None-Detected
GM220631 North Center, Room 21, None-Detected
Plaster Wall System, Off-White Over Tan
Multiple Locations, 1,500 Square Feet
GM220632
Northeast, North Men's
Restroom, PC1 None-Detected
GM220633
South Center, North
Men's Restroom, PC2 None-Detected
GM220634
Center, North Women's
Restroom, PC3 None-Detected
Plaster Ceiling System, White Over Tan, Multiple Locations. 570 Square Feet
GM220635
Northeast, North Men's
Restroom, PW1 None-Detected
GM220636
South Center, North
Men's Restroom, PW2 None-Detected
GM220637
East Center, North
Women's Restroom, PW3 None-Detected
Wall Board, White Over Brown, Multiple
Locations, 640 Square Feet
GM220638
North Center, North Fire
Riser Shed, WB1 None-Detected
GM220639
West Center, North Fire
Riser Shed, WB2 None-Detected
GM220640
Center, North Fire Riser
Shed, WB3 None-Detected
GM220641
South Center, South Fire
Riser Shed, WB4 None-Detected
GM220642
North Center, South Fire
Riser Shed, WB5 None-Detected
GM220643
West Center, South Fire
Riser Shed, WB6 None-Detected
GM220644
Southeast, North
Entrance, W1
≤1% Chrysotile VIA
Point Count
GM220645 Northwest, Room 22, W2 None-Detected
GM220646 Southeast, Room 16, W3 None-Detected
≤1% Chrysotile VIA
Point Count
GM220652
Southeast, Room 4
Hallway, W9
≤1% Chrysotile VIA
Point Count
GM220647
West Center, Room 15, W4
≤1% Chrysotile VIA
Point Count
GM220648 East Center, Room 14, W5 ≤1% Chrysotile VIA
Point Count
GM220649 South Center, Room 6, W6 ≤1% Chrysotile VIA
Point Count
Drywall/Joint Compound Wall System, Multiple Locations, 34,650 Square Feet
GM220656
Northeast, Southeast
Entry Hall, W13
≤1% Chrysotile VIA
Point Count
GM220657
South Center, Room 10, W14
≤1% Chrysotile VIA
Point Count
GM220658
West Center, Room 10, W15
≤1% Chrysotile VIA
Point Count
GM220653 Southeast, Room 6A, W10 None-Detected
GM220654 Northeast, Room 8, W11 None-Detected
GM220655 East Center, Room 9, W12 ≤1% Chrysotile VIA
Point Count
GM220650 Northwest, Room 6, W7 ≤1% Chrysotile VIA
Point Count
GM220651 Southwest, Room 4, W8
GM220659 Northwest, Room 14, W17 None-Detected
GM220660
Northeast, South
Entrance, W18
≤1% Chrysotile VIA
Point Count
GM220661
West Center, Room J1, DC1
≤1% Chrysotile VIA
Point Count
Fire Door Insulation, White, Center Hall Way, 200 Square Feet
Drywall/Joint Compound Ceiling System, Multiple Locations, 550 Square Feet
GM220662 Southeast, Room J2, DC2 None-Detected
GM220663
North Center, North
Entrance, DC3
≤1% Chrysotile VIA
Point Count
GM220664 Northeast, Entrance, DC5 ≤1% Chrysotile VIA
Point Count
GM220665 Center, Sliding Door 24%
Chrysotile/Amosite
GM220666 Center, Sliding Door 21%
Chrysotile/Amosite
GM220667 Southeast None-Detected
Ceiling Batt Insulation, Pink, South Half Upper
Mechanical Room, 200 Square Feet
GM220668 Southeast None-Detected
GM220669 Southwest None-Detected
GM220670 Southwest None-Detected
Roof Batt Insulation, Foil Over Pink, South Half
Upper Mechanical Room, 24,180 Square Feet
GM220671 Northwest None-Detected
GM220672 South Center, Room 6, W6 None-Detected
GM220673 South Center, Room 10 None-Detected
Ceiling Batt Insulation, Foil Over Yellow, South
Half Upper Mechanical Room, 200 Square Feet
GM220674 East Center, Room 11A None-Detected
GM220675 North Center, Room, 13 None-Detected
GM220676 Center, Room 21 None-Detected
Ceiling Batt Insulation, Brown Over Pink, Multiple Locations, 500 Square Feet
GM220677 Southwest None-Detected
GM220678 Southwest None-Detected
GM220679 None-Detected
Wall Batt Insulation, Foil Over Pink, Multiple
Locations, 2,400 Square Feet
GM220680 West Center, Room 10, None-Detected
GM220681 East Center, Room 15 None-Detected
GM220682 Southwest, Room 17 None-Detected
GM220683 North Center, Room 21, None-Detected
GM220684 Northeast, South Half None-Detected
None-Detected
Wall Batt Insulation, Yellow, Multiple
Locations, 6,000 Square Feet
GM220686 Southwest, Room 18 None-Detected
GM220687 South Center, Room 19 None-Detected
GM220688 Hallway Outside Room 19 None-Detected
GM220689 North Center, Room 20 None-Detected
None-Detected
GM220691 Northeast, Room 13 None-Detected
2'x4' Ceiling Tile, Wormygrooves/Pinholes
Pattern, White, Multiple Locations, 2,000
Square Feet
GM220692 West Center, Room 13 None-Detected
GM220693 South Center, Room 14 None-Detected
GM220694 West Center, Room 15 None-Detected
GM220695
Southeast, Women's
Restroom None-Detected
None-Detected
GM220700 Northeast, Room 10 None-Detected
GM220701 Center, Room 10 None-Detected
GM220696 South West, Room 6 None-Detected
GM220697 South Center, Room 6 None-Detected
GM220698 North Center, Room 10 None-Detected
GM220702 South Center, Room 10 None-Detected
GM220699 Center, Room 10
GM220690 South Center, Room 10
GM220685 Southwest, Room 17
Southwest
2'x4' Ceiling Tile, Wormygrooves/Pinholes
Pattern, Off-White, Upper Ceiling, Multiple
Locations, 1,000 Square Feet
Cell: (801)940-2970
Supervisor: Taylor Brimberry: DSN: (801)586-7094
Asbestos/LBP Shop 75 CES(CEOHA)
Asbestos/LBP Shop Personnel
DSN:(801)777-8006
CONTACT INFORMATION
Table 4.
POTENTIAL FOR ADDITIONAL MATERIALS:
This inspection report only encompasses the areas/materials designated within the scope of work that was provided at the date of inspection (see title page for inspection date). Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.
Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material
(ACM) is encountered, stop work and contact the personnel listed below for further assistance/assessment.
None-Detected
GM220706 Hallway Outside Room 6 None-Detected
GM220710 Southwest, Room 6 None-Detected
GM220703 West Center, Room 4 None-Detected
GM220704 Southwest, Room 6 None-Detected
GM220707 South Center, Room 14 None-Detected
GM220708 Southeast, Room 14 None-Detected
GM220709 North Center, Room 14
None-Detected
GM220726 None-Detected
GM220727
None-Detected
GM220713 None-Detected
GM220714 South, Main North Hall None-Detected
GM220715 Southwest, Room 17 None-Detected
None-Detected
GM220712 None-Detected North Center, Room 13
North None-Detected
GM220721 Northwest None-Detected
Southwest, Room 18 None-Detected
GM220717 Northeast, Room 19 None-Detected
GM220718 Southwest, Room 20 None-Detected
None-Detected
GM220724
GM220711 West Center, Room 13
GM220705 South Center, Room 6
2'x2' Ceiling Tile, Pockmarks/Pinholes Pattern, White, Multiple Locations, 2,040 Square Feet
South Center, Room 14
2'x4' Recessed Ceiling Tile, Pockmarks/Pinholes Pattern, White, Multiple
Locations, 400 Square Feet
GM220716
None-Detected
GM220719 Southwest, Room 22 None-Detected
GM220720
12" Acoustical Ceiling Tile, Wormygrooves/Pinholes Pattern, White Over
Puck, Black, Room 10 Storage Room, 150
Square Feet
West Center, Men's
Restroom
East Center, Men's
Restroom
2'x2', Ceiling Tile, Smooth Pattern, White, Multiple Locations, 550 Square Feet
GM220767 Room 18
GM220722 Southeast
GM220766 Room 12
East Center
GM220723
West Center, Women's
Restroom
Center Building, Main
Hallway
2'x4' Ceiling Tile, Pockmarks/Pinholes Pattern, White, Multiple Locations, 18,200 Square Feet
2'x2' Recessed Ceiling Tile, Pockmarks/Pinholes, White, South Half, Storage Room 150 Square Feet
GM220765 Room 7 None-Detected
Wood Over Fire Door Insulation, Brown, Multiple Locations, 250 Square Feet
None-Detected
GM220768 Room 22 None-Detected
GM220769
East Center, Women's
Restroom
None-Detected
GM220728 Southeast None-Detected
GM220729 Northwest None-Detected
GM220725
None-Detected
None-Detected
SCOPE OF WORK:
XL Number Substrate Component Color Lead Reading Paint
Condition
265 Metal Door Frame Brown 4.01 Good
277 Ceramic Window Sill Tile Off-White 14.17 Good
301 Ceramic 4" Wall Tile Green 5.1 Good
302 Ceramic 4" Wall Tile Green 11.33 Good
307 Metal Partition Tan 0.8 Good
313 Ceramic Sink White 8.77 Good
343 Metal Door Frame White 8.82 Fair
350 Concrete Floor Line Yellow 0.95 Poor
351 Concrete Floor Line Red 0.9 Poor
360 Metal Fire Alarm Red 1.2 Good
365 Ceramic Window Sill Tile Tan 8.87 Poor
424 Metal Fire Hydrant Brown 11.84 Poor
488 Metal Radius Vent Brown 0.95 Poor
489 Metal Radius Vent Brown 11.81 Poor
490 Metal Radius Vent Brown 9.43 Poor
491 Metal Radius Vent Brown 6.41 Poor
492 Metal Radius Vent Brown 5.57 Poor
DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
1-Table 1 below, summarizes the painted/coated building components that tested positive for Lead Based
Paint/Coating. These components should be segregated or abated prior to renovation or demolition, and a composite TCLP taken of the waste before disposal.
DEMOLISH BUILDING
XRF Analyzer Used: XRF Analyzer XL3t 300 (Serial #96588)
5-This inspection report only encompasses the areas/materials designated within the scope of work that was provided at the date of the inspection (see title page for date). This report must be modified should the scope of the project be altered in any way or additional materials not previously identified within this report are encountered. This report may not be used for any other projects within the building.
LIMITED LEAD-BASED PAINT IDENTIFICATION REPORT INFORMATION
Table 1.
2-The condition column is the condition only of the painted/coated component (See final page for all readings/samples).
3-The U.S. Department of Housing and Urban Development defines Lead-based paint as any paint, varnish, stain, or other applied coating that has 1 mg/cm² as measured by an X-ray Fluorescence (XRF) Analyzer or laboratory analysis or 0.5 percent by weight (5,000 µg/g by dry weight) by laboratory analysis, or more of lead. All other components tested were less than 0.80 mg/cm².
4-Any effort to disturb lead paint can create lead dust. Ensure that appropriate abatement, cleanup, and disposal will be accomplished and that appropriate safety measures are taken IAW 29 CFR 1926.62. If you have any questions concerning this report, contact the Asbestos/LBP Shop: Taylor Brimberry at 586-7094.
255 1.09 393 0.98
256 0.94 394 1.20
257 0.96 POS 395 1.03
Range: .8 to 1.2 Paint Range: .8 to 1.2
Side Condition Color PbL(mg/cm2) NEG/POS
North Good Off-White 0.01 NEG
South Good Off-White 0.01 NEG
South Good Varnish 0.01 NEG
South Good Off-White 0.01 NEG
South Good Off-White 0.01 NEG
North Poor Off-White 0.60 NEG
East Good Brown 0.01 NEG
North Good Brown 4.01 POS
North Good Brown 0.01 NEG
East Good White 0.01 NEG
East Good White 0.01 NEG
East Good White 0.01 NEG
East Good White 0.01 NEG
East Good White 0.01 NEG
North Good Brown 0.04 NEG
North Good Brown 0.01 NEG
South Good White 0.01 NEG
South Good Brown 0.01 NEG
East Good Brown 0.09 NEG
East Good Off-White 14.17 POS
West Good Off-White 0.01 NEG
East Good White 0.30 NEG
South Good White 0.01 NEG
South Good Green 0.01 NEG
East Good Brown 0.01 NEG
East Good White 0.63 NEG
East Good Green 0.40 NEG
East Poor Green 0.01 NEG
East Good Green 0.01 NEG
East Good Grey 0.01 NEG
Per 20
Second
Reading
Calibration
Range
Substrate
Room 11A Communication Closet
Drywall
Metal
WallRoom 11A Communication Closet
Room 21 Door Frame Wood
Post
Calibration
PbL
(mg/cm²)XRF Analyzer XL3t 300 (Serial #96588)
Per 20
Second
Reading
259 Room 22 Door Jamb Metal
258 Room 22 Wall Drywall
Pre
Calibration PbL (mg/cm²)
Calibration
Range
Model# Serial #
XL Number Room/Area Structure
264 North Entry Door Frame Metal
267 Room19A Window Sill Tile Ceramic
266 North Entry Door Metal
260 Room 22 Door Wood
263 Room 21 Wall Wood
262 Room 21 Door Trim Wood
269 Room19A Door Frame Metal
268 Room19A Wall Drywall
271 Room 16 Window Sill Tile Ceramic
270 Room 19 Heater Pipe Metal
265 North Entry Door Frame Metal
276 Room 14 Chari Rail Wood
279 Room 11B Wall Drywall
278 Room 14 Wall Drywall
273 End of North hall Door Frame Metal
272 Room 20 Chair Rail Wood
275 Room 15A Door Wood
274 Room 15A Door Frame Wood
281 Room 11B Wall Block
280 Room 11B Wall Block
283 Room 11A Communication Closet Door Frame Wood
282 Room 11A Communication Closet Door Trim Wood
277 Room 14 Window Sill Tile Ceramic
285 Room 11A Communication Closet Door Trim Wood
284 Room 11A Communication Closet Door Frame Wood
287 Water Heater
257 0.96 POS 395 1.03
Range: .8 to 1.2 Paint Range: .8 to 1.2
Side Condition Color PbL(mg/cm2) NEG/POS
East Good Green 0.01 NEG
East Good Pink 0.01 NEG
North Good Black 0.01 NEG
East Good Grey 0.01 NEG
East Good Grey 0.01 NEG
West Good White 0.01 NEG
North Fair White 0.01 NEG
East Fair Black 0.01 NEG
East Good Black 0.01 NEG
East Good White 0.01 NEG
Center Good Off-White 0.01 NEG
North Good Off-White 0.01 NEG
North Good Off-White 0.40 NEG
North Good Green 5.10 POS
East Good Green 11.33 POS
Center Good Light Green 0.01 NEG
Center Good Green 0.01 NEG
Center Good White 0.08 NEG
South Good White 0.01 NEG
South Good Tan 0.80 POS
South Good White 0.01 NEG
North Good White 0.01 NEG
East Good Varnish 0.36 NEG
East Good White 0.59 NEG
West Good Off-White 0.28 NEG
West Good White 8.77 POS
South Good Tan 0.01 NEG
West Good White 0.3 NEG
West Good Green 0.55 NEG
West Good Off-White 0.48 NEG
Pre
Calibration PbL (mg/cm²)
Calibration
Range
Model# Serial # Post
Calibration
PbL
(mg/cm²)
Calibration
RangeXRF Analyzer XL3t 300 (Serial #96588)
289 Room 12 Wall Drywall
290 Room 12 Wall Drywall
291 Room 12 Door Frame Metal
Per 20
Second
Reading
Per 20
Second
Reading
XL Number Room/Area Structure Substrate
288 Room 12 Wall Drywall
295 East Entry Door Frame Metal
296 East Entry Door Metal
297 East Entry Pipe Metal
292 Room 12 Door Metal
293 East Entry Wall Drywall
294 East Entry Heater Metal
301 Men's Restroom 4" Wall Tile Ceramic
302 Men's Restroom 4" Wall Tile Ceramic
303 Men's Restroom 1" Floor Tile Ceramic
298 Men's Restroom Ceiling Drywall
299 Men's Restroom Wall Drywall
300 Men's Restroom Pipe Metal
307 Men's Restroom Partition Metal
308 Men's Restroom Toilet Ceramic
309 Men's Restroom Urinal Ceramic
304 Men's Restroom 1" Floor Tile Ceramic
305 Men's Restroom 1" Floor Tile Ceramic
306 Men's Restroom Sink Ceramic
313 Janitors Closet J1 Sink Ceramic
314 Janitors Closet J1 Water Heater Metal
315 Janitors Closet J1 Door Metal
310 Men's Restroom Door Wood
311 Men's Restroom Door Frame Metal
312 Janitors Closet J1 Wall Block
316 Janitors Closet J1 Door Metal
317 Janitors Closet J1 Door Metal
257 0.96 POS 395 1.03
Range: .8 to 1.2 Paint Range: .8 to 1.2
Side Condition Color PbL(mg/cm2) NEG/POS
West Good Green 0.01 NEG
East Good Green 0.33 NEG
West Good Off-White 0.01 NEG
North Poor Off-White 0.01 NEG
North Poor Off-White 0.01 NEG
North Good Tan 0.11 NEG
South Good White 0.21 NEG
South Good White 0.17 NEG
South Good White 0.17 NEG
East Fair Off-White 0.01 NEG
West Good Off-White 0.11 NEG
West Good Off-White 0.01 NEG
West Good Off-White 0.01 NEG
East Good Off-White 0.01 NEG
West Good Off-White 0.01 NEG
West Good Grey 0.45 NEG
West Good Grey 0.01 NEG
West Fair Grey 0.01 NEG
West Good Off-White 0.01 NEG
Center Good Yellow 0.04 NEG
Center Good Grey 0.01 NEG
North Good Off-White 0.01 NEG
West Good Off-White 0.01 NEG
West Good Off-White 0.14 NEG
West Good Green 0.01 NEG
South Fair White 8.82 POS
South Fair White 0.01 NEG
South Fair White 0.01 NEG
South Fair White 0.01 NEG
South Fair Off-White 0.01 NEG
PbL
(mg/cm²)
Calibration
RangeXRF Analyzer XL3t 300 (Serial #96588)
Per 20
Second
Reading
Per 20
Second
Reading
XL Number Room/Area Structure Substrate
Pre
Calibration PbL (mg/cm²)
Calibration
Range
Model# Serial # Post
Calibration
321 Room 9 Ladder Metal
322 Room 9 Ladder Rung Metal
323 Room 9 Wall Ceramic
318 Room J1 Door Frame Metal
319 Room J1 Wall Block
320 Room J2 Shelves Wood
327 Room 7 Door Frame Metal
328 Room 10 Door Frame Wood
329 Room 10 Wall Drywall
324 Room 9 Door Trim Wood
325 Room 9 Door Frame Wood
326 Room 9 Door Trim Wood
333 Room 5 Roll-Up Door Metal
334 Room 5 Door Frame Metal
335 Room 5 Door Metal
330 Room 10 Chair Rail Wood
331 Room 10 Heater Metal
332 Room 7 Door Frame Wood
339 Room 5 Window Trim Wood
340 Room 6 Window Frame Wood
341 Room 6 Wall Panel Wood
336 Room 5 Wall Drywall
337 Room 5 Electrical Shed Metal
338 Room 5 Electrical Shed Metal
345 South End of Hall North Half Door Trolley Metal
346 South End of Hall North Half Wall Concrete
347 South End of Hall North Half Chair Rail Wood
342 Room 6 Door Frame Wood
343 South End of Hall North Half Door Frame Metal
344 South End of Hall North Half Door Metal
257 0.96 POS 395 1.03
Range: .8 to 1.2 Paint Range: .8 to 1.2
Side Condition Color PbL(mg/cm2) NEG/POS
East Good Off-White 0.01 NEG
North Poor Off-White 0.01 NEG
North Poor Yellow 0.95 POS
North Poor Red 0.90 POS
North Good Off-White 0.01 NEG
North Good Off-White 0.01 NEG
South Good Off-White 0.01 NEG
South Fair Black 0.01 NEG
South Fair Black 0.01 NEG
South Fair Black 0.03 NEG
West Fair White 0.01 NEG
West Good Yellow 0.01 NEG
South Good Red 1.20 POS
West Good Blue 0.01 NEG
West Good Off-White 0.01 NEG
East Good Off-White 0.01 NEG
East Good Varnish 0.01 NEG
West Good Tan 8.87 POS
South Good Tan 0.01 NEG
South Good Green 0.44 NEG
North Good Green 0.28 NEG
South Good Off-White 0.01 NEG
South Good Off-White 0.01 NEG
South Good Off-White 0.01 NEG
South Good Brown 0.01 NEG
South Good Dark Brown 0.33 NEG
North Good White 0.01 NEG
South Good Tan 0.02 NEG
South Good Brown 0.02 NEG
South Good White 0.08 NEG
Per 20
Second
Reading
Per 20
Second
Reading
XL Number Room/Area Structure Substrate
348 Room 4 Door Frame Metal
Pre
Calibration PbL (mg/cm²)
Calibration
Range
Model# Serial # Post
Calibration
PbL
(mg/cm²)
Calibration
RangeXRF Analyzer XL3t 300 (Serial #96588)
352 Room 4 Wall Block
353 Room 4 Wall Concrete
354 Room 4 Wall Drywall
349 Room 4 Floor Line Concrete
350 Room 4 Floor Line Concrete
351 Room 4 Floor Line Concrete
358 Room 4 Roll Up Door Metal
359 Room 4 Eye Wash Metal
360 Room 4 Fire Alarm Metal
355 Room 4 Ladder Metal
356 Room 4 Ladder Rung Metal
357 Room 4 Ladder Mount Metal
364 Room 8 Door Wood
365 Room 8 Window Sill Tile Ceramic
366 Room 8 Chair Rail Wood
361 South Half Hall Wall Drywall
362 South Half Hall Chair Rail Wood
363 Room 8 Door Frame Metal
370 South Half Men's Restroom Wall Drywall
371 South Half Men's Restroom 4" Wall Tile Ceramic
372 South Half Men's Restroom 4" Wall Tile Ceramic
367 Room 8A Wall Drywall
368 Room 8A Wall Block
369 Room 8A Baseboard Wood
376 South Half Men's Restroom Partition Metal
377 South Half Men's Restroom Urinal Ceramic
373 South Half Men's Restroom 4" Wall Tile Ceramic
374 South Half Men's Restroom Sink Corian
375 South Half Men's Restroom Partition Metal
257 0.96 POS 395 1.03
Range: .8 to 1.2 Paint Range: .8 to 1.2
Side Condition Color PbL(mg/cm2) NEG/POS
South Good White 0.01 NEG
South Good Tan 0.01 NEG
East Good Varnish 0.01 NEG
East Good Off-White 0.01 NEG
East Fair Off-White 0.01 NEG
East Fair Off-White 0.1 NEG
South Good White 0.01 NEG
South Good White 0.01 NEG
South Fair White 0.01 NEG
South Fair White 0.21 NEG
South Fair White 0.4 NEG
West Good White 0.01 NEG
West Good White 0.62 NEG
South Good Brown 0.01 NEG
South Good Brown 0.01 NEG
West Fair Tan 0.01 NEG
West Poor Brown 0.12 NEG
West Poor Brown 0.01 NEG
West Fair Tan 0.01 NEG
West Fair Tan 0.01 NEG
West Fair Tan 0.58 NEG
West Good Brown 0.01 NEG
West Good Black 0.01 NEG
West Poor Tan 0.01 NEG
West Fair Tan 0.01 NEG
West Fair Tan 0.01 NEG
West Fair Grey 0.01 NEG
West Fair Red 0.1 NEG
West Fair Tan 0.01 NEG
West Fair Tan 0.01 NEG
Pre
Calibration PbL (mg/cm²)
Calibration
Range
Model# Serial # Post
Calibration
378 South Half Men's Restroom Toilet Ceramic
379 South Half Men's Restroom 8" Floor Tile Ceramic
380 South Half Men's Restroom Door Wood
PbL
(mg/cm²)
Calibration
RangeXRF Analyzer XL3t 300 (Serial #96588)
Per 20
Second
Reading
Per 20
Second
Reading
XL Number Room/Area Structure Substrate
384 South Cubicle Area Wall Drywall
385 South Cubicle Area Chair Rail Wood
386 South Cubicle Area Door Wood
381 South Half Men's Restroom Door Frame Metal
382 Storage Room Ladder Metal
383 Storage Room Ladder Rung Metal
390 South Entry Pipe Metal
391 South Entry Door Frame Metal
392 South Entry Door Metal
387 South Cubicle Area Door Frame Wood
388 South Cubicle Area Door Trim Wood
389 South Entry Heater Metal
396 North West Exterior Wall Block
397 North West Exterior Double Door Frame Metal
398 North West Exterior Double Door Metal
393 North West Exterior Wall Concrete
394 North West Exterior Handrail Metal
395 North West Exterior Handrail Post Metal
402 North West Exterior Wall Brick
403 North West Exterior Motor Cover Metal
404 North West Exterior Shed Metal
399 North West Exterior Down Spout Metal
400 North West Exterior Window Frame Metal
401 North West Exterior Window Sill Concrete
405 North West Exterior Shed Frame Metal
406 North West Exterior Roll Up Door Metal
407 West Exterior Roll Up Door Channel Metal
257 0.96 POS 395 1.03
Range: .8 to 1.2 Paint Range: .8 to 1.2
Side Condition Color PbL(mg/cm2) NEG/POS
West Fair Tan 0.01 NEG
West Fair Tan 0.01 NEG
West Fair Tan 0.01 NEG
West Poor Brown 0.01 NEG
West Poor Brown 0.01 NEG
West Poor Brown 0.01 NEG
West Poor Tan 0.32 NEG
West Fair Tan 0.15 NEG
West Fair Tan 0.01 NEG
West Good Grey 0.01 NEG
West Fair Brown 0.01 NEG
West Fair Red 0.02 NEG
West Poor Grey 0.04 NEG
West Fair Grey 0.08 NEG
West Fair Brown 0.01 NEG
South Poor Green 0.01 NEG
South Poor Brown 11.84 POS
South Fair Tan 0.01 NEG
South Fair Tan 0.01 NEG
South Good Brown 0.37 NEG
South Good Brown 0.01 NEG
South Poor Brown 0.01 NEG
South Poor Brown 0.57 NEG
South Poor Brown 0.01 NEG
South Poor Black 0.01 NEG
South Poor Black 0.01 NEG
South Fair Tan 0.01 NEG
South Good Brown 0.01 NEG
South Good Brown 0.01 NEG
South Poor Brown 0.01 NEG
Pre
Calibration PbL (mg/cm²)
Calibration
Range
Model# Serial # Post
Calibration
PbL
(mg/cm²)
Calibration
RangeXRF Analyzer XL3t 300 (Serial #96588)
409 West Exterior Roll Up Man Door Metal
410 West Exterior Roll Up Door Hinge Metal
411 West Exterior Hand Rail Post Metal
Per 20
Second
Reading
Per 20
Second
Reading
XL Number Room/Area Structure Substrate
408 West Exterior Roll Up Door Angle Metal
415 West Exterior Roll Up Door Metal
416 West Exterior Roll Up Door Frame Metal
417 West Exterior HVAC Unit Metal
412 West Exterior Hand Rail Metal
413 West Exterior HVAC Unit Metal
414 West Exterior Expansion 2x8 Wood
421 South Exterior Electrical Box Metal
422 South Exterior Wall Concrete
423 South Exterior Fire Hydrant Metal
418 West Exterior HVAC Unit Stand Metal
419 West Exterior HVAC Unit Stand Metal
420 South Exterior Pipe Metal
427 South Exterior Gutter Metal
428 South Exterior Downspout Metal
429 South Exterior Awning Post Metal
424 South Exterior Fire Hydrant Metal
425 South Exterior Awning Roof Metal
426 South Exterior Awning Siding Metal
433 South Exterior Man Door Frame Metal
434 South Exterior Over Head Drip Edge Metal
435 Fire Riser Room Fire Riser Roof Metal
430 South Exterior Handrail Post Metal
431 South Exterior Handrail Metal
432 South Exterior Man Door Metal
436 Fire Riser Room Drip Edge Metal
437 Fire Riser Room Door Metal
257 0.96 POS 395 1.03
Range: .8 to 1.2 Paint Range: .8 to 1.2
Side Condition Color PbL(mg/cm2) NEG/POS
South Poor Brown 0.06 NEG
South Poor Tan 0.01 NEG
East Poor Brown 0.41 NEG
East Poor Brown 0.28 NEG
East Poor Brown 0.32 NEG
East Fair Tan 0.06 NEG
East Fair Tan 0.05 NEG
East Fair Brown 0.37 NEG
East Good Brown 0.01 NEG
East Good Brown 0.01 NEG
East Fair Brown 0.01 NEG
East Poor Brown 0.01 NEG
East Poor Brown 0.11 NEG
East Poor Brown 0.01 NEG
East Poor Brown 0.01 NEG
East Poor Brown 0.01 NEG
East Poor Brown 0.01 NEG
East Fair Brown 0.01 NEG
East Poor Tan 0.01 NEG
East Poor Tan 0.01 NEG
East Fair Tan 0.01 NEG
East Fair Tan 0.01 NEG
East Fair Tan 0.01 NEG
East Fair Brown 0.01 NEG
East Fair Brown 0.01 NEG
East Poor Black 0.08 NEG
North Poor Red 0.01 NEG
North Poor Brown 0.54 NEG
North Poor Grey 0.01 NEG
North Poor Brown 0.33 NEG
PbL
(mg/cm²)
Calibration
RangeXRF Analyzer XL3t 300 (Serial #96588)
Per 20
Second
Reading
Per 20
Second
Reading
XL Number Room/Area Structure Substrate
Pre
Calibration PbL (mg/cm²)
Calibration
Range
Model# Serial # Post
Calibration
441 East Exterior Safety Rail Metal
442 East Exterior Dock Edge Concrete
443 East Exterior Wall Brick
438 Fire Riser Room Door Frame Wood
439 Fire Riser Room Water Valve Metal
440 East Exterior Safety Rail Metal
447 East Exterior Double Door Metal
448 East Exterior Awning Post Metal
449 East Exterior Handrail post Metal
444 East Exterior Wall Concrete
445 East Exterior Wall Concrete
446 East Exterior Double Door Frame Metal
453 Center East Door Door Frame Metal
454 East Exterior Door Metal
455 East Exterior Window Frame Metal
450 East Exterior Handrail Metal
451 East Exterior Gutter Metal
452 East Exterior Down Spout Metal
459 East Exterior Awning Siding Metal
460 East Exterior Awning Roof Metal
461 East Exterior Awning Gutter Metal
456 East Exterior 2x8 Divider Wood
457 East Exterior Down Spout Metal
458 East Exterior Awing Trim Metal
465 East Exterior Stair Hand Rail Metal
466 East Exterior Stair Concrete
467 East Exterior Stair Han Rail Metal
462 East Exterior Down Spout Metal
463 East Exterior Security Bars Metal
464 East Exterior Stair Hand Rail Metal
257 0.96 POS 395 1.03
Range: .8 to 1.2 Paint Range: .8 to 1.2
Side Condition Color PbL(mg/cm2) NEG/POS
North Fair Tan 0.14 NEG
North Fair Tan 0.17 NEG
North Poor Tan 0.01 NEG
North Poor Grey 0.01 NEG
North Fair Tan 0.01 NEG
North Fair Brown 0.01 NEG
North Fair Tan 0.01 NEG
West Good Red 0.01 NEG
West Good Red 0.05 NEG
East Good Green 0.01 NEG
East Good Red 0.01 NEG
West Good Black 0.01 NEG
West Fair Grey 0.01 NEG
West Fair Green 0.01 NEG
West Fair Maroon 0.03 NEG
West Fair Red 0.70 NEG
West Fair Black 0.01 NEG
West Fair Red 0.02 NEG
Center Poor Brown 0.33 NEG
Center Poor Brown 0.32 NEG
West Poor Brown 0.95 POS
Center Poor Brown 11.81 POS
South Poor Brown 9.43 POS
North Poor Brown 6.41 POS
North Poor Brown 5.57 POS
Per 20
Second
Reading
Per 20
Second
Reading
XL Number Room/Area Structure Substrate
468 North Exterior Wall Concrete
Pre
Calibration PbL (mg/cm²)
Calibration
Range
Model# Serial # Post
Calibration
PbL
(mg/cm²)
Calibration
RangeXRF Analyzer XL3t 300 (Serial #96588)
472 North Exterior Vault Lid Metal
473 North Exterior Vault lid Metal
474 Exterior North Fire Riser Room Steam Support Post Metal
469 North Exterior Wall Brick
470 North Exterior HVAC Unit Stand Metal
471 North Exterior HVAC Unit Metal
478 South Half, North West Attic Tank Metal
479 South Half, North West Attic Support Angle Metal
480 North Half, Southwest Attic HVAC Unit Metal
475 South Half, North West Attic Tank Metal
476 South Half, North West Attic Tank Metal
477 South Half, North West Attic Pump Metal
484 North Half, Southwest Attic Angle Metal
485 North Half, Southwest Attic Beam Metal
486 Exterior Roof Roof Cap Metal
481 North Half, Southwest Attic Compressor Metal
482 North Half, Southwest Attic Compressor Metal
483 North Half, Southwest Attic Compressor Metal
490 Exterior Roof Radius Vent Metal
491 Exterior Roof Radius Vent Metal
492 Exterior Roof Radius Vent Metal
487 Exterior Roof Roof Flashing Metal
488 Exterior Roof Radius Vent Metal
489 Exterior Roof Radius Vent Metal
Reviewed on: 4/25/2022
ENVIRONMENTAL RESTORATION (AFCEC/CZOM)
AF Form 813 Review Requestor: James Morris, (777-3423) 75 CEG
813 ID: 40291
Installation Restoration Program (IRP) Comments:
There is no known surface contamination beneath or adjacent to Buildings 483. However, any construction project has the potential to uncover previously undocumented contamination. If unusual soil stains or odors are encountered during any excavation that may be required for this project, or if you have questions regarding the wells, please contact the Restoration POC, Mr.
Lindsay Burt (775-3301).
Environmental Restoration funds cannot be used to address contamination discovered during a construction project (MILCON or non-MILCON) per Section 6.4 of AFI 32-7020 (7 Nov 2014). If a construction project generates actions that result in the need to address contamination, or a need to change Environmental Restoration Program timelines to address contamination, the costs of such actions are not eligible for the use of Environmental Restoration funds and shall be funded as part of the construction project. This includes the handling, mitigation, and disposal or other disposition of contamination discovered before or during the construction activity. Excavations that result in the need for soil disposal will either dispose of clean soil at the on-base Construction and Debris landfill or use as fill for another on-base project.
Contaminated soil will be disposed of at a permitted landfill.
Environmental Restoration Reviewer: Lindsay Burt, 775-3301
HILL AIR FORCE BASE
Construction Project Water Quality Compliance Planning CHECKLIST hafb_construction_site_checklist_24march2021.docx PRINTED: 24 March 2021
Instructions - This checklist should be used by the design engineer to determine the necessary design considerations and the submittals for a Stormwater Pollution Prevention Plan (SWPPP) and/or Erosion Control Plan (ECP) review. Once submitted by the Hill AFB PM, it will be used by 75 CEG/CEIE to review and approve these documents. (**This checklist is not all inclusive; consult with CEIE for site-specific issues.)
General The attached form is a list of typical stormwater review criteria for all construction projects.
o The Design Engineer should check each item on the list; if an item is not applicable to this project, the item should be noted as N/A o Upon submittal for plan review, the Design Engineer should sign this form indicating the checklist and all required documents have been submitted o Hill Air Force Base (AFB) Project Manager (PM) must review documents from the Design Engineer and check what is included with the packet and sign this checklist prior to submittal to 75 CEG/CEIE o A copy of this checklist must accompany the plans with all subsequent reviews, 75 CEG/CEIE will not accept plans for review without this signed checklist.
o In providing approvals, 75 CEG/CEIE assumes that applicants have not made any errors and have complied with all applicable regulations. If after an approval, an error is discovered, or it is discovered that some aspect of approved drawings does not comply with applicable regulations, the applicant shall, at their own expense, revise the drawings and modify any infrastructure as necessary to correct the problem. Applicants and their design professionals shall remain responsible for their projects at all times.
The Hill AFB PM is responsible for compliance with all Department of Defense (DoD), Air Force Instruction (AFI), Unified Facilities Criteria (UFC), and State of Utah Division of Water Quality (DWQ) requirements. In addition, the Hill AFB PM is responsible for compliance with the DoD Implementation of Stormwater Requirements under Section 438 of the Energy Independence and Security Act (EISA) and obtaining all necessary permits and approvals.
Permit Requirements
• Utah Pollutant Discharge Elimination System (UPDES) Municipal Separate Storm Sewer System (MS4) Permit
(UTR090000) Part 4.2.4 and Part 4.2.5
• UPDES Construction General Permit (CGP) (UTRC00000)
PROJECT NAME:
PROJECT ADDRESS/LOCATION:
I have personally reviewed this submittal and verify that it is complete and that all items have been addressed and comply with current Base Codes and Requirements.
Design Engineer Signature:
Print Name:
Date:
Hill AFB Project Manager Signature: Date:
Hill AFB SWPPP Reviewer Signature: Date:
CEIE USE ONLY:
Municipal Industrial High Priority Area? YES NO
COMMENTS (see attached) PROCEED
HILL AIR FORCE BASE
Construction Project Water Quality Compliance Planning CHECKLIST
Suggested Resources:
• HAFB Guidance Document for Stormwater Management, 2006
• Utah DWQ Construction Activities Stormwater Permit: 801-536-4391 https://deq.utah.gov/Permits/water/updes/stormwatercon.htm
Contact Information:
• Davis Weber Canal Company: 801-774-6973
• Fife’s Ditch Company: 801-540-0571
• American Water:
o Mark Persico – 801-940-6998 o Colby Goodliffe– 801-695-9785 or 385-245-3297
• Corps of Engineers: 801-295-8380
• 75 CEG/CENM: Dave Murray – 801-777-2118
• SABER: Cody Duncan – 801-777-8489
• 75 CEG/CEIE: Michelle Cottle – 801-777-5041 https://deq.utah.gov/Permits/water/updes/stormwatercon.htm
Hill AFB Project Manager and 75 CEG/CEIE PLAN REVIEW CHECKLIST
PROJECT NAME:
DESIGN ENGINEER Hill AFB PM
USE ONLY
INCLUDED N/A
ANTICIPATED
SUBMITTAL
DATE
SUBMITTAL ITEM YES NO N/A
DESIGN
Project name/title Coordination with American Water for sanitary sewer discharges
Coordination with IWTP for industrial wastewater discharges Permit/coordination with Army Corps of Engineers, if impacting wetlands
Permit/coordination with Davis/Weber Canal Company, if impacting canal
Coordination letter from water users, if impacting Fife’s Ditch Easement/covenant documents, if needed Storm drainage calculations (separate document) for pipe system, surface route, and/or detention/retention ponds.
Stamped and certified by a Utah-licensed professional engineer (PE), with the following statement:
“I hereby certify that this report for the onsite drainage of the project was prepared by me (or under my direct supervision) in accordance with the provisions of Specification Section 01 57 20 Environmental Protection and Section 438 of the EISA, and was designed to comply with the provisions thereof. I understand that the Hill AFB project manager does not, and will not, assume liability for drainage facility designs.”
Rationale for long-term BMP selection to include an evaluation of LID methods
Final stabilization plan
STORMWATER POLLUTION PREVENTION PLAN
SWPPP prepared using the Utah DWQ Construction General Permit (CGP) template
If project is greater than 5 acres: SWPPP prepared by a PE or other certified/qualified individual (see CGP Part 7.2)
Copy of UPDES NOI (required prior to pre-construction kickoff meeting)
Vicinity map with project location identified
EROSION CONTROL PLAN
Existing contour lines (gray scale) at one-foot (1’) intervals Proposed contour lines at one-foot (1’) intervals Locations of materials/equipment/stockpile storage Storm drain system clearly identified (existing and proposed) Direction of stormwater flow Limits of disturbance Locations and details for all erosion and sediment control
BMPs
POST-CONSTRUCTION STORMWATER CONTROLS
Rationale for BMP selection Anticipated BMP pollutant removal Impacts to water quality Maintenance plan for each long-term BMP to include recommended routine maintenance, recommended inspection schedule, inspection requirements
REQUEST FOR ENVIRONMENTAL IMPACT ANALYSIS Report Control Symbol
RCS:40291
INSTRUCTIONS: Section I to be completed by Proponent; Section II and III to be completed by Environmental Planning Function. Continue on seperate sheets as necessary. Reference appropriate item number(s).
SECTION I - PROPONENT INFORMATION
1*) ENVIRONMENTAL MGT
2. FROM (Proponent organization and functional address symbo 2a. TELEPHONE NO.
75 CEG (James Morris)
1. TO (Environmental Planning Function)
3. TITLE OF PROPOSED ACTION
Demolish and remove all improvements and associated infrastructure for Building 483.
777-3423
4. PURPOSE AND NEED FOR ACTION (Identify decision to be made and need date)
5. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES (DOPAA) (Provide sufficient details for evaluation of the total action.)
See Page 2
See Page 2
14. GEOLOGY AND SOILS (Topography, minerals, geothermal, Installation Restoration Program, seismicity, etc.)
6. PROPONENT APPROVAL (Name and Grade) 6a. SIGNATURE 6b. DATE
SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY. (Check appropriate box and describe potential environmental effects Including cumulative effects.) (+ = positive effect; 0 = no effect; - = adverse effect; U = unknown
7. AIR INSTALLATION COMPATIBLE USE ZONE/LAND USE (Noise, accident potential, encroachment, etc.)
+ 0 - U
8. AIR QUALITY (Emissions, attainment status, state implementation plan, etc.)
9. WATER RESOURCES (Quality, quantity, source, etc.)
10. SAFETY AND OCCUPATIONAL HEALTH (Asbestos/radiation/chemical exposure, explosives safety quantity-distance, bird/wildlife aircraft hazard, etc.)
11. HAZARDOUS MATERIALS/WASTE (Use/storage/generation, solid waste, etc.)
12. BIOLOGICAL RESOURCES (Wetlands/floodplains, threatened or endangered species, etc.)
13. CULTURAL RESOURCES (Native American burial sites, archeological, historical, etc.)
15. SOCIOECONOMIC (Employment/population projections, school and local fiscal impacts, etc.)
16. OTHER (Potential impacts not addressed above.)
James.L.Morris James Morris 16-Feb-2022
X
X
X
X
X
X
X
X
X
X
SECTION III - ENVIRONMENTAL ANALYSIS DETERMINATION
17. PROPOSED ACTION QUALIFIES FOR CATEGORICAL EXCLUSION (CATEX) (see below for list of CATEXs); OR
PROPOSED ACTION DOES NOT QUALIFY FOR A CATEX; FURTHER ENVIRONMENTAL ANALYSIS IS REQUIRED.
X
18. REMARKS
32 CFR 989 CATEX A2.3.11 Actions similar to other actions which have been determined to have an insignificant impact in a similar setting as established in an EIS or an EA resulting in a FONSI. The EPF must document application of this CATEX on AF Form 813, specifically identifying the previous Air Force approved environmental document which provides the basis for this determination.
NEPA approval is contingent upon implementation of all other programs requirements, not just environmental requests.
19. ENVIRONMENTAL PLANNING FUNCTION CERTIFICATION
(Name and Grade)
THIS FORM CONSOLIDATES AF FORM 813 and 814.
PREVIOUS EDITIONS OF BOTH FORMS ARE OBSOLETE.
Stephen Vlaming 09-Mar-2022
AF IMT 813, 19990901, V1
19a. SIGNATURE 19b. DATE
//E-SIGNED 3- 9-22//
Vlaming, Stephen
AF IMT 813, SEP 99, CONTINUATION SHEET
4. PURPOSE AND NEED FOR ACTION (Identify decision to be made and need date)
4.1 Objective:
Demolish and remove all improvements and associated infrastructure for building 483, Hill Air Force Base, Utah.
4.2 Need Back:
3/2/2022 12:00:00AM
4.3 Who Wants the Project:
75 CEG. James Morris is the base POC (801) 777-3423
4.4 Why is the action required:
Demolish and remove all improvements and associated…