Attachment (6) Government Property Report.pdf
PDF 67 KB Posted
- Attached to
- USCG JAMES (WMSL 754) Dockside FY20 FYQ3
- Solicitation number
- 70Z08520QP4559400
About this file
This document contains a government property report template to be completed by a contractor during contract performance. It also includes details of a related federal contract opportunity with the US Coast Guard to provide dockside services for the USCGC James from July through September 2020.
The property report template requires the contractor to record all government property received under the contract, including its description, value, receipt and installation dates, current location, and disposition instructions. It must be signed by both the contractor and property administrator to certify all property has been accounted for through use, consumption or disposition.
The coastal guard contract opportunity solicitation seeks dockside maintenance for a cutter during the third quarter of fiscal year 2020. Offerors should reference the attached documents for requirements. The awarding agency is the Department of Homeland Security's US Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFC 1.pdf | ||
| 70Z08520QP4559400 A00003.pdf | ||
| RFC 1.2.pdf | ||
| RFC 1.1.pdf | ||
| RFC 2.pdf | ||
| A00003 SF30 4.8.20.pdf | ||
| A00002 SF30.pdf | ||
| A00002 Attachment (1).xlsx | XLSX spreadsheet | |
| A00003 SF30.pdf | ||
| 70Z08520QP4559400 A00001.pdf | ||
| Attachment (7) Pier PAPA Load Restriction Clarification (A).pdf | ||
| Attachment (1) Schedule.xlsx | XLSX spreadsheet | |
| Attachment (8) DHS Form 11000-6 Non-Disclosure Agreement.pdf | ||
| Attachment (4) Request for Clarification.docx | DOCX document | |
| Attachment (3) Past Performance Information Form.docx | DOCX document | |
| 70Z08520QP4559400.pdf | ||
| Attachment (5) Base Lay Down and Pier PAPA Restrictions.pdf | ||
| Attachment (7) Pier PAPA Load Restriction Clarification (B).pdf | ||
| Attachment (2) Specifications.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 5
GOVERNMENT PROPERTY REPORT
The Contractor shall complete each column throughout the contract performance period with the assistance of the Government Property Administrator, as needed.
CONTRACT NUMBER:
VESSEL:
CONTRACTOR POINT OF CONTACT:
TELEPHONE NUMBER:
CONTRACTOR’S ADDRESS:
The chart below is for use during the performance of the above listed contract. The Contractor shall complete each column of the chart with the assistance of the Government Property Administrator, as needed.
1 2 3 4 5 6
TYPE OF PROPERTY RECEIVED
(INCLUDE NAME, DESCRIPTION ,
NSN AND SERIAL #)
VALUE OF
PROPERTY
DATE
RECEIVED
INSTALLED/
CONSUMED
USE THIS BLOCK TO
RECORD :
1. CURRENT LOCATION
OF PROPERTY IN THE
POSSESSION OF THE
CONTRACTOR FOR USE
DURING THE
AVAILABILITY OR
OTHERWISE BEING
TEMPORARILY HELD
UNTIL BEING RETURNED
TO/REINSTALLED ON
CUTTER.
2. DISPOSITION
INSTRUCTIONSFOR
UNUSED, SERVICEABLE,
SALVAGE OR SCRAP
PROPERTY. STATE
WHICH APPLY.
DISPOSITION
CARRIED OUT
DESCRIPTION
NSN\SERIAL\P/N
* Definitions (all property defined below will require disposition instructions):
Serviceable - defined as property that was pre-existing in a location that was, during the course of performance, replaced and which will be turned in by the Coast Guard for future use.
Salvage – defined as property that has no serviceable value, but that has some value in excess of its scrap value.
Scrap – defined as property having no value except for it basic material content.
The undersigned hereby certify that all property provided under referenced contract has been accounted for. That is property has either been consumed in the performance of the contract or disposition instructions, as listed above, have been provided.
PROPERTY ADMINISTRATOR DATE
(Sign at time disposition instructions are given)
CONTRACTOR SIGNATURE DATE
(sign after execution of disposition instructions)
NOTE: The Contractor must carry out all disposition instructions as instructed above. This report must accompany the Contractor’s final invoice. (07/02)
| Type of property received (include name, description , nsn and serial #) |
| date |
| nsn\serial\p/n |
| description |
File details come from the government source that posted it. Updated .