Attachment (1) Schedule.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
USCG JAMES (WMSL 754) Dockside FY20 FYQ3
Solicitation number
70Z08520QP4559400
Issued by

About this file

This solicitation package includes an attachment schedule for ship maintenance and repair services for the USCGC JAMES. Definite work items include cleaning and inspecting grey water and lift station tanks, renewing deck coverings, insulation, and vent ducts, and replacing quick-acting airtight doors. Optional work items involve partially or fully preserving JP-5 storage tanks if inspections determine necessary. Bidders should provide pricing for each definite and optional work item using the composite labor hour rate of [rate] per hour applied to an estimated 1,416 hours for changes. The solicitation is issued by the U.S. Coast Guard under number 70Z08520QP4559400 for work on the USCGC JAMES (WMSL 754) during FY20 FYQ3 dockside availability.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bids

Solicitation No.: 70Z08520QP4559400, USCGC JAMES DS FY20 FYQ3
Attachment 1 - Schedule of Supplies and Services
Provide all labor, materials, and equipment, except as specified, to perform the services identified in Attachment (2).
CLIN 0001 - DEFINITE WORK ITEMS
These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
Work ItemDescriptionQTYUnitAmountRunning Total
D-001Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean1JOB$0.00
D-002Frequency Converter (400 Hz), Load Test, Perform1JOB$0.00
D-003Air Conditioning Plants, Groom1JOB$0.00
D-004Refrigeration Plant, System Groom1JOB$0.00
D-005Cargo Handling Elevator, Inspect and Repair1JOB$0.00
D-006Forward and Aft Capstans, Annual Maintenance1JOB$0.00
D-007Dual Point Davit, Biennial Maintenance, Perform1JOB$0.00
D-008Tanks (Grey Water and Lift Stations), Preserve “100 %”1JOB$0.00
D-009Talon Grid, Inspect and Test1JOB$0.00
D-010Incinerator, Clean Inspect and Test1JOB$0.00
D-011Tanks (Grey Water and Lift Stations), Clean and Inspect1JOB$0.00
D-012Tanks (Grey Water and Lift Stations), Preserve “100%”1JOB$0.00
D-013Deck Covering (Polymeric), Renew1JOB$0.00
D-014Insulation (Overhead), Renew1JOB$0.00
D-015Deck Covering (Slip-Resistant), Renew1JOB$0.00
D-016Tenting, Provide1JOB$0.00
D-017Reverse Osmosis Foundation, Preserve1JOB$0.00
D-018Vent Ducts, Renew1JOB$0.00
D-019QAATD/QAWTD, Replace (NSC5)--RemainingRemaining1JOB$0.00
D-020Quick--Acting Airtight Doors, RenewActing Airtight Doors, Renew1JOB$0.00
D-021Tanks (JP-5 Storage), Clean and Inspect5 Storage), Clean and Inspect1JOB$0.00Running Total
D-024Temporary Services, Dockside, Home Pier1JOB$0.00
$0.00$0.00
CLIN 0002 - OPTIONAL WORK ITEMS
Optional items listed below will be awarded if inspection reports reveal the necessity for activation. Evaluation of the options shall not obligate the Government to exercise the option.
D-022Tanks (JP-5 Storage), Preserve “Partial” 5 Storage), Preserve “Partial” - Optional1JOB$0.00
D-023Tanks (JP-5 Storage), Preserve “100%” 5 Storage), Preserve “100%” - Optional1JOB$0.00
$0.00$0.00
COMPOSITE LABOR HOUR RATE
The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause entitled “Composite Labor Rate.” Composite Labor Hour Rate - Provide the all inclusive mark-up/loading rate for materials and subcontractors below. This rate will be incorporated into the contract and used on change requests.
Labor Rate Per HourEstimated Quantity**Total
$0.001,416$0.00$0.00
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required.