Attachment 6-GFI NAVSEA 4340_02.pdf

PDF 1 MB Posted

Attached to
US Navy Submarine EDG Global Repair Services
Solicitation number
N6449820R4043
Issued by

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVSEA 4340/2 (Rev. Mar 2018) Page 1 of 2

GOVERNMENT FURNISHED INFORMATION

ATTACHMENT # PR#

PROGRAM TITLE: CONTRACT NUMBER: DATE:

CODE:

(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE

NAVSEA 4340/2 (Rev. Mar 2018) Page 2 of 2

NAVSEA Form 4340/2 - Government Furnished Information Instructions

ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.

PR #: Enter Purchase Request (PR) number.

PROGRAM TITLE: Enter the title of the program.

CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.

DATE: Enter the calendar date that this form was prepared.

CODE: Enter the Program Office / Requiring Activity's office code.

NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.

DOCUMENT TITLE, Column (2): Enter Document Title for each item.

DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.

DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).

GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:

DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test

PAGE __ OF __: Assign page numbers sequentially.

NAVSEA 4340/2 (Rev. Mar 2018) Page of NAVSEA 4340/2 (Rev. Mar 2018) Page of

GOVERNMENT FURNISHED INFORMATION

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

NAVSEA Form 4340/2 - Government Furnished Information Instructions

ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.

PR #: Enter Purchase Request (PR) number.

PROGRAM TITLE: Enter the title of the program.

CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.

DATE: Enter the calendar date that this form was prepared.

CODE: Enter the Program Office / Requiring Activity's office code.

NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.

DOCUMENT TITLE, Column (2): Enter Document Title for each item.

DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.

DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).

GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:

DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test

PAGE __ OF __: Assign page numbers sequentially.

11.0.1.20130826.2.901444.899636

CurrentPage:
PageCount:
TextField1: 6
TextField2:
TextField7: EDG Submarine Global Repair Services
TextField8:
DateField1:
TextField3:
DateField3:
DateField2:
TextField6:
TextField5: TBD on Task Orders
TextField4:

File details come from the government source that posted it. Updated .