ATTACHMENT 6 General Conditions Breakout.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Y1DA--Project # 596A4-24-101 - Construction to Replace Main Electrical Distribution Equipment
Solicitation number
36C24926R0073
Issued by

About this file

This file is a General Conditions cost breakout template for use in the Schedule of Values submission for a construction contract with the Department of Veterans Affairs. The template is structured to capture and itemize all general conditions costs associated with a construction project to replace main electrical distribution equipment at a Veterans Integrated Service Network 9 facility (Solicitation 36C24926R0073). The document provides line items organized into three primary cost categories: Project Management (including superintendent, safety manager, CPM scheduler, quality assurance/quality control, project managers, field office engineers, and support staff); Bonds and Insurance (builder's risk insurance, general liability insurance, and security/payment/performance bonds); and Site Conditions (temporary utilities, facilities, environmental controls, security, and documentation measures). Each line item is presented with a zero-dollar placeholder value, requiring contractors to populate actual costs during proposal submission.

The file references VAAR 852.243-70 Construction Contract Changes-Supplement, which establishes contractual restrictions stipulating that overhead and contractor fee percentages must encompass insurance (excluding subcontractor-specific policies), field and office supervision, security, small tools, incidental job burdens, and general home office expenses with no separate allowance permitted. The template serves as a compliance instrument to ensure transparent cost allocation and adherence to federal contracting requirements for the Veterans Affairs construction project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GC Breakout

GENERAL CONDITIONS BREAKOUT
When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Construction Contract Changes-Supplement, paragraph (c)(1), the following contractual restrictions apply: Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage.
General Condition DescriptionValue
Project Management:$ - 0
Superintendent(s)$ - 0
Safety Manager$ - 0
CPM Scheduler$ - 0
Quality Assurance/Quality Control$ - 0
Project Manager (s)$ - 0
Project Executive$ - 0
Field Office Engineer$ - 0
Field Office Support Staff$ - 0
Project Expeditor$ - 0
Assistant Superintendent (s)$ - 0
Project Manager Subtotal:$ - 0
Bonds and Insurance (excluding any for Subcontractors):$ - 0
Builder’s Risk Insurance$ - 0
General Liability Insurance$ - 0
Security, Payment & Performance Bonds$ - 0
Bonds and Insurance Subtotal:$ - 0
Site Conditions:$ - 0
Temporary Power Consumption (Offices)$ - 0
Temporary Power Consumption (General Site Use)$ - 0
Temporary Water and Sewer Consumption$ - 0
Temporary Water Hookup, Distribution & Meters$ - 0
Temporary Electrical Hookup, Distribution & Meters$ - 0
Temporary Telephone & Network System Installation$ - 0
Temporary Telephone & Internet Consumption Fees$ - 0
Temporary Fire Protection$ - 0
Temporary Heating & Cooling$ - 0
Temporary Fencing$ - 0
Temporary Covered Walkways$ - 0
SWPPP Measures$ - 0
Temporary Entries and Truck Washes$ - 0
Street Cleaning (by G.C.)$ - 0
Traffic Control Measures$ - 0
Temporary Barricades & Signage$ - 0
Temporary Roads & Walkways (install & maintenance)$ - 0
Temporary Lighting$ - 0
Temporary Partitions & Covered Floor Openings$ - 0
Temporary Toilets/Sanitary Measures$ - 0
Temporary Laydown (prep and restoration)$ - 0
Security System/Watchman$ - 0
Pre-construction Photo Documentation$ - 0
Progress Photos$ - 0
Temporary Protection (in place work/adjacent structures)$ - 0
$ - 0
$ - 0
$ - 0
General Conditions Total$ - 0