This document appears to be an attachment, "Attachment 6 - DwgMarkup-PVBunkhsesPartial(2001.5).pdf", that contains detailed instructions and markups related to a federal contract opportunity. The key details are:

The related federal contract opportunity is the "Phase 2 - 0412 GAOA 4FL Forest Housing Deferred Maintenance" project, Solicitation Number 1240LT24R0064, issued by the U.S. Forest Service. This is a 100% Small Business Set-Aside requirement. A site visit will be held on August 27, 2024 at 12:00 PM Mountain Time at the Krassel Yard on Payette National Forest property. The project involves various repairs and upgrades to the 4FL Forest Housing, including removing an electric on-demand water heater, running new hot water lines, replacing siding and roofing, installing spray foam insulation, and constructing a wall in the attic space.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

samuelpthompson Callout Remove electric on-demand water heater & circuit, run hot water pex line from nearest source in the attic (install insulation over line), and tie into shower, install access panel at back of posi-temp valve.

samuelpthompson Line samuelpthompson Callout Remove electric on-demand water heater & circuit, run hot water pex line from nearest source in the attic (install insulation over line), and tie into shower, install access panel at back of posi-temp valve.

Line

Remove gable vent, cover hole with plywood, building wrap, and replace all existing fiber cement siding with new in gable end to match the existing.

samuelpthompson Polygonal Line samuelpthompson Polygonal Line samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Callout Install clamp-on snow bar system in valleys following manufacturer's guidelines.

samuelpthompson Rectangle samuelpthompson Callout Remove bottom 36" of siding, repair any issues with plywood and building wrap, and install white corrugated metal wall panels w/ trim.

samuelpthompson Rectangle samuelpthompson Rectangle samuelpthompson Callout Remove bottom 36" of siding, repair any issues with plywood and building wrap, and install white corrugated metal wall panels w/ trim.

Line

Remove gable vent, cover hole with plywood, building wrap, and new siding to match the existing.

samuelpthompson Callout Remove gable vent, cover hole with plywood, building wrap, and new siding to match the existing.

samuelpthompson Callout Replace damaged standing metal roofing panels and valley metal as needed.

samuelpthompson Callout Install clamp-on snow bar system in valleys following manufacturer's guidelines.

samuelpthompson Polygonal Line samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Polygonal Line samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Callout Install clamp-on snow bar system in valleys following manufacturer's guidelines.

samuelpthompson Callout Replace damaged standing metal roofing panels and valley metal as needed.

samuelpthompson Rectangle samuelpthompson Rectangle samuelpthompson Callout Remove bottom 36" of siding, repair any issues with plywood and building wrap, and install white corrugated metal wall panels w/ trim.

samuelpthompson

Remove bottom 36" of siding, repair any issues with plywood and building wrap, and install white corrugated metal wall panels w/ trim.

Text Box Remove existing insulation in attic space & install spray foam insulation on underside of roof deck (R-49) and gable walls (R-35).

Remove existing insulation in attic space & install spray foam insulation on underside of roof deck (R-49) and gable walls (R-35).

samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Callout Install spray foam insulation (R-35) on gable walls samuelpthompson Callout Construct wall in attic space in order to spray foam insulation (R-35) on gable wall samuelpthompson Rectangle samuelpthompson Rectangle samuelpthompson

Construct wall in attic space in order to spray foam insulation (R-35) on gable wall

Rectangle

Remove electric on-demand water heater, disconnect circuit, remove circuit breaker in panel and place a filler plate in the panel.

samuelpthompson Line samuelpthompson Callout Remove electric on-demand water heater, disconnect circuit, remove circuit breaker in panel and place a filler plate in the panel.