Attachment_6_Component_Inventory_Schedule_Form.pdf

PDF 102 KB Posted

Attached to
FABRICATE AND INSTALL CULTURAL EXHIBIT Federal contract opportunity
Solicitation number
140P4321R0009
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document includes an attachment schedule form and a solicitation for fabrication and installation of a cultural exhibit. The attachment schedule form is a template for tracking component inventory and costs for an interpretive media asset inventory.

The solicitation seeks proposals for fabrication and installation of an exhibit at the Mogan Cultural Center located in the Lowell National Historical Park in Lowell, Massachusetts. The National Park Service is requesting firm-fixed price proposals due by October 7, 2021. The contractor must provide all labor, materials, and services to fabricate and install the exhibit between November 1, 2021 and August 4, 2023. The solicitation is set aside for small businesses with a NAICS code of 337212 and size standard of 500 employees. The wage determination is 2015-4035 Revision 16. Proposals should be submitted electronically to the points of contact provided.

View the file

Other files for this federal contract opportunity

Other files attached to FABRICATE AND INSTALL CULTURAL EXHIBIT, newest first.
File Type Posted
Sol_140P4321R0009_Amd_0004.pdf PDF
Sol_140P4321R0009_Amd_0003.pdf PDF
Sol_140P4321R0009_Amd_0002.pdf PDF
15c_REVISED_EE_REPORT_0002.pdf PDF
12a_part_1__FINAL_Drawings_1-36_0001.pdf PDF
Sol_140P4321R0009_Amd_0001.pdf PDF
12a_part_2_FINAL_Drawings_37-76_0001.pdf PDF
15f__Interactives_Report__(1).pdf PDF
13a__2021_06_30_LOWE_PD2_FINAL_Graphics_Schedule.pdf PDF
12a_Design_Drawings_1-76.pdf PDF
Attachment_9_Art_Documentation_Form.pdf PDF
Attachment_4_Programmatic_Accessibility_Guidelines_for_NPS_Interpretive_Media.pdf PDF
15b__CE_Report_.pdf PDF
Attachment_11_Construction_Timeline__03_21.pdf PDF
Attachment_5_NPS_Standard_Specifications_for_Planning_Design_Production_and_Installation_of_Electronic_Programs.pdf PDF
Attachment_2_Exhibit_Conservation_Guidelines.pdf PDF
Attachment_1_Exhibit_Planning_Design_and_Fabrication_Specifications.pdf PDF
Sol_140P4321R0009.pdf PDF
Attachment_7_Component_Inventory_Sample.pdf PDF
Attachment_B_US_DOL_SCA_Wage_Determination.pdf PDF
15g__Case_Report_(1).pdf PDF
Attachment_10_Descriptive_Exhibit_Tour_Installation_Equipment_Guide.pdf PDF
Attachment_8_AV_Completion_Report.pdf PDF
Attachment_3_Architectural_Barriers_Act_Standards.pdf PDF
Attachment_A_Statement_of_Work_8_15_2021.pdf PDF
15e__IM_Report.pdf PDF
15d__EP_Report.pdf PDF
15c__EE_Report_.pdf PDF
15a__AO_Report_(1).pdf PDF
14__2021_06_30_LOWE_Reference_Package_(1).pdf PDF
13b__2021_06_30_LOWE_PD2_FINAL_Graphics.pdf PDF
12b__2021_06_30_LOWE_PD2_FINAL_Drawings_77-140_(4).pdf PDF
Attachment_12_Cost_Estimate_Form.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enter data into green cells Project:

Enter total original contract price:

$0

$0

$0Exhibition Area 01

Attachment 6 - Component Inventory Schedule Form | 2018 | IDIQ Exhibit Planning & Design Contrac Interpretive Media Asset Inventory Cost Summary

Replacement Cost:

General Conditions: For each item below, enter value from original contract

Project Management, Administrative, Overhead

Pre-Production (Drawings, Samples, Mock-ups)

Shipping

(Also includes items not recoverable elsewhere, such as electrical upgrades, interior finishes, etc. included in the fabrication contract.)

Closeout

These totals are automatically calculated from individual line item replacement costs. They may be higher than the original contract costs because economies of scale are not factored in.

Wayside Exhibits

Exhibit Area or Scen

Total General Conditions:

Enter Project Name

On-site Installation

Enter Park

Fabrication Costs

Valor in the Pacific National Monument • Pearl Harbor Historic Sites, Hawaii Summary Page 1

$0

$0

$0

$0 Add more Exhibition Area rows and sheets if necessary.

$0

Calculated Total Cost — All Project Elements: $0

Total Fabrication Replacement Cost

Exhibition Area 02

Exhibition Area 03

Exhibition Area 04

Exhibition Area 05

Valor in the Pacific National Monument • Pearl Harbor Historic Sites, Hawaii Summary Page 2