FABRICATE AND INSTALL CULTURAL EXHIBIT Federal contract opportunity
Solicitation number
140P4321R0009
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document contains a solicitation for fabrication and installation services for a cultural exhibit. The National Park Service seeks a contractor to fabricate and install an exhibit at the Mogan Cultural Center in Lowell National Historical Park in Massachusetts. The period of performance is November 1, 2021 through August 4, 2023. The solicitation is set aside for small businesses under NAICS code 337212 with a size standard of 500 employees. Proposals are due by October 7, 2021 and award will be made to the offeror providing the best value based on technical factors and price. The contractor must furnish all labor, materials, and equipment necessary to complete the exhibit fabrication and installation.

The document also includes answers to questions about specific elements of interactive experiences to be included in the cultural exhibit. The questions seek clarification on audio and video elements, number of concurrent users, and content management systems.

View the file

Other files for this federal contract opportunity

Other files attached to FABRICATE AND INSTALL CULTURAL EXHIBIT, newest first.
File Type Posted
Sol_140P4321R0009_Amd_0003.pdf PDF
Sol_140P4321R0009_Amd_0002.pdf PDF
15c_REVISED_EE_REPORT_0002.pdf PDF
12a_part_1__FINAL_Drawings_1-36_0001.pdf PDF
Sol_140P4321R0009_Amd_0001.pdf PDF
12a_part_2_FINAL_Drawings_37-76_0001.pdf PDF
15f__Interactives_Report__(1).pdf PDF
13a__2021_06_30_LOWE_PD2_FINAL_Graphics_Schedule.pdf PDF
12a_Design_Drawings_1-76.pdf PDF
Attachment_9_Art_Documentation_Form.pdf PDF
Attachment_6_Component_Inventory_Schedule_Form.pdf PDF
Attachment_4_Programmatic_Accessibility_Guidelines_for_NPS_Interpretive_Media.pdf PDF
Attachment_B_US_DOL_SCA_Wage_Determination.pdf PDF
15g__Case_Report_(1).pdf PDF
Attachment_10_Descriptive_Exhibit_Tour_Installation_Equipment_Guide.pdf PDF
Attachment_8_AV_Completion_Report.pdf PDF
Attachment_3_Architectural_Barriers_Act_Standards.pdf PDF
15b__CE_Report_.pdf PDF
Attachment_11_Construction_Timeline__03_21.pdf PDF
Attachment_5_NPS_Standard_Specifications_for_Planning_Design_Production_and_Installation_of_Electronic_Programs.pdf PDF
Attachment_2_Exhibit_Conservation_Guidelines.pdf PDF
Attachment_1_Exhibit_Planning_Design_and_Fabrication_Specifications.pdf PDF
Sol_140P4321R0009.pdf PDF
Attachment_7_Component_Inventory_Sample.pdf PDF
Attachment_A_Statement_of_Work_8_15_2021.pdf PDF
15e__IM_Report.pdf PDF
15d__EP_Report.pdf PDF
15c__EE_Report_.pdf PDF
15a__AO_Report_(1).pdf PDF
14__2021_06_30_LOWE_Reference_Package_(1).pdf PDF
13b__2021_06_30_LOWE_PD2_FINAL_Graphics.pdf PDF
12b__2021_06_30_LOWE_PD2_FINAL_Drawings_77-140_(4).pdf PDF
Attachment_12_Cost_Estimate_Form.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P4321R0009 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Boston MA 02129-4543

PNN

Building I-1 Charlestown Navy Yard Boston National Historical Park

DOI, NPS, NER - NE MABO

Boston MA 02129-4543

PNN

Building I-1 Charlestown Navy Yard Boston National Historical Park

NPS, NER - NE MABO

10/08/20210004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/07/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to answer the following questions:

Question 1: Amendment 0003 answer 1, Ambient Audio EP-01-03-999: This states that NPS will identify with our community language partners other language speakers. We envision these as location-recorded at sites within the city. However Amendment 0002 answer 1 states that ambient audio is being produced for the project by faculty and students at UMass.

Can you clarify whether the selected contractor will be recording or creating any of the audio elements for this piece, including sound effects and/or dialogue?

Will UMass be providing all sound elements including dialogue, and the contractor will be providing sound mixing services only?

Or is the Ambient Audio not part of the scope of work?

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Wendy De Leon

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P4321R0009/0004

Answer 1: Ambient audio is in the scope of work.

Contractor is to provide formatting or integration of already-recorded sound, playback hardware, and installation. The principal sound recording will be by NPS with its partners at

UMass Lowell.

Question 2: Amendment 0003 answer 4 EP-02-04-99.

Can you clarify whether you envision single musicians performing their own compositions, or bands performing? The description of this interactive states that visitors will have the option to isolate the sound of the selected instrument. If this interactive features single musicians performing, then there is no audio isolation needed, and this interactive will simply be allowing users to select musicians/instruments and then playing a video of them performing.

Answer 2: Depending upon genre and instruments, music may be performed by soloists, duos, or groups. There will be performances in which more than one instrument is being played together

(e.g. sitar and tabla drum).

Question 3: EP-04-05-999 A Seat At The Kitchen

Table: Can you provide an example of one of the scenarios that might be shown, so that we can budget appropriately?

Answer 3: Scenarios are still being developed.

The concept is that of a conversation among two or three persons gathered in a household kitchen, talking about an event in their day, and so that visitors can select to hear different speakers in that conversation. See description on pages 49-50 of Electronic Program Report

Question 4: EP-04-05-999 A Seat At The Kitchen

Table: Will the park be scripting the dialogue for these scenarios and character perspectives?

Answer 4: Yes, NPS will script the dialogues for these.

Question 5: EP-04-05-999 A Seat At The Kitchen

Table: Can multiple stories be told simultaneously if multiple users come to the

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P4321R0009/0004 table?

Answer 5: No, a small group gathered around the table would still encounter one story at a time.

Question 6: EP-04-05-999 A Seat At The Kitchen

Table: How many visitors can use the table at one time? Does the table show a single story at a time, or can it show multiple simultaneously?

Answer 6: One story would be accessed at one time. Multiple visitors will observe together.

Question 7: EP-06-03-999 Storybooth: Is introductory / explanatory narration required, or will all instructions be text-based?

Answer7: Instructions should be accessible per

ADA and available in display copy and as audio for sight-impaired.

Question 8: EP-06-03-999 Storybooth: Can you clarify the connectivity restrictions and how videos will be accessed for review and transferred to the Experience Stations? The description says that videos will be available for review via a CMS for remote access and upload to the Experience Stations but then also says that files will need to be transferred via SD card or other hardware.

Answer 8: NPS is expecting fabricator to propose a content management system that can be used in each Experience station (02-xx, 04-xx, 05-xx) that is accessible locally and will allow adding new data collected in the Storybooth and edited for display. Story content is different for each station.

Question 9: EP-06-03-999 Storybooth: Should the interface work both as touchscreen AND through accessibility interface panel when required?

Answer 9: The interface must be accessible for all users, according to ADA and ABA.

Legacy Doc #: NPS

Period of Performance: 11/01/2021 to 08/04/2023

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .