Attachment 6 As-Builts Cad Files 28 APR 2020.pdf
PDF 7 MB Posted
- Attached to
- CONSTRUCT NTTC TRAINER (SHOOT HOUSE) Federal contract opportunity
- Solicitation number
- FA301620C0060
About this file
This document contains plans and specifications for a construction project. The project involves constructing a mock brig, mock ship, communications tower, and associated site work at the Navy Technical Training Center at Joint Base San Antonio - Lackland in Texas. The work includes excavating and installing a new 14-foot-wide asphalt road, building concrete foundations for the mock brig, mock ship, and tower, erecting the structures, installing fencing, and other site improvements. The plans provide details for the demolition work, site layout, building designs, structural and reinforcement requirements, and other construction elements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3 DD 1354.pdf | ||
| Attachment 2 Submittal Register.pdf | ||
| Attachment 7 -Conceptual Drawings Site Layout.pdf | ||
| Attachment 5- Physical Data 2019-2020.pdf | ||
| Attachment 1 SOW.pdf | ||
| Attachment 4 -Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N/A
12031
12039
10635
15041
12049
15060
10265
10504
12012
10802
12028
10634
15036
13028
15062
13034
1543 1604
10700
15049
P956
15024
15045
15062
13067
10055
10706
12042
15006
13032
15030
15055
12047
10650
Pavilion 3
10207
13014
10395
N/A
12038
15057
12013
10330
N/A
13020
15007
15003
10253
13000
N/A
10345
14931448
Pavilion 2
13060
N/A
13004
15060
15012
10658
N/A
10007
13052
15037
13016
7360 814
15014
15007
12003
15019
15001
12048
10670
868 832
10792
12017
15088
N/A
15004
15053
13054
15064
15088
15006
15065
10250
12046
12006
15063
15032
12008
N/A
15012
N/A
15059
10637
13023
15002
12033
13017
10656
15058
13059
13005
15000
15028
15048
13007
10390
13030
15040
N/A
16041601
15003
N/A
12004
13015
15054
13006
15005
10175
15031
15027
10900
10065
13055
13025
13027
12009
12016
12045
15051
12025
13058
12019
N/A
12024
N/A
15009
13063
12020
10708
15052
10215
15047
12043
13013
10070
N/A
13051
10060
13021
10263
15015
15009
12023
15065
P958
10251
N/A
N/A
12005
12021
15018
7563685
N/A
10904
15058
12026
12044
15010
11101
12010
15056
12040
10380
15050
15055
15009
15063
10810
13056
15033
13018
15042
13001
12014
N/A
12000
15017
15061
15043
15023
13065
12022
11102
12036
10210
13053
10701
P957
10534
15060
N/A
15007
10255
10203
15015
N/A
N/A
15046
13029
12001
15088
13057
10652
12011
15022
13002
12018
15064
10806
10205
15058
15029
15038
10375
15025
10547
15021
10230
10800
10416
12027
15001
13047
10346
Pavilion 1
10385
10201
13022
15056
15026
15005
15061
13033
10902
15010
10540
13031
12015
15012
15044
10541
12032
13061
13026
13008
10050
12050
10903
12007
10338
12034
15059
12041
11103
12002
13012
10261
12030
10804
12037
15056
N/A
N/A
15013
10075
15020
15006
15004
15002
10056
13003
10808
13019
10501
15063
13050
15057
15003
15003
N/A
130491618
15064
15034
16231623
15039
15064
12029
15007
12035
13024
13045
M
ILITAR
Y DR
Andrews Road
G
AR
Y
AV
E
TBD
Kelly Drive
SCOTT DR
Chappie James Way
Moore Street
Hof Street
TBD
ARNO
LD CIR
CLE
G
EO
R G
E AVE
CHELI LN
MC GUIRE ST
KISSLING COURT
TBD
S ec ur ity
H ill
TBD
MILITARY DR
C
ARSW
ELL AVE
GOTT ST
TBD
PATRICK ST
M
ILITAR
Y DR
KE
LL
AC
K
ST
TBD
BARNES AVE
TBD
TBD
PEASE ST
LUKE BLVD
TBD
M
ILITAR
Y DR
H
UG
HES AVE
Andrews Road
D om in gu es S tre et
PATRICK ST
TBD
La ve ne L oo p
TB
D
G
ARY AVE
TBD
TBD
KENLY AVE
ENT CIR
GOODFELLOW ST
TRUEMPER ST
MEIVOHER DR
BARNES AVE
Blake Road
H al l S tre et
HARLOW ST
G alaxy Road
TBD
TBD
BERGQUIST DR
LARSON ST
M
ILITAR
Y DR
G ro w de n R oa d
Warner Circle
G
EO
R G
E AVE
Billy Mitchell Road
H
ABY'S RD
Cha pm an C irc le
H angar W ay
W
ALKER AVE
WURTSMITH ST
ANDREW
S AVE
CONNALLY ST
SELFRIDGE BLVD
PATRICK ST
LUKE BLVD
G
EO
R G
E
AV
E
BO
NG
AVE
TBD
HUGHES AVE
W
ALKER AVE
BO
NG
AVE
ERWIN CIRCLE
PUCKET ST
KEESLER AVE
G
ARY AVE
TRUEMPER ST
MC CHORD ST
Wakkana Street
Peshawar Street
Ki rk ne wto n St re et
TBD
Kelly Drive
G af fn ey
S tre et
TBD
OLMSTED ST
M C
D
ILL DR
BERGQUIST DR
W
ALKER AVE
TIN
KE
R
ST
EA
ST
P
ER
IM
ET
ER
D
R
LADD ST
Y O
U N
T
PEPPERRELL ST
TBD
SELFRIDGE BLVD
TBD
TBD
B
IG
G S
A V
E
STEWART ST
ENT CIR
TB
D
FERSON LOOP
SARNOSKI ST
G
EO
R G
E AVE
SARNOSKI ST
TB
D
TBD
GENTILE ST
HARMON DR
M
ETZG
ER
DR
HENSLEY ST
FIVE PALM
S DR
Sarnoski Street
TB
D
FEMOYER ST
FO
STER AVE
PEASE ST
KIRTLAND ST
Bullard
C
RAW
AVE
SE
RV
IC
E
RD
R
LEMAY
TBD
M athies Court
Fegan Loop
LUKE BLVD
KELLY DR
C
LAY LO
O P
Bl ak e R oa d
D
IM
S
TE
A D
A V
E
C
ASTLE AVE
FAIR
C
H
ILD
ST
H al l S tre et
M C
DI
LL
D R
Hall S tre et
H
UG
HES AVE
TINKER AVE
TBD
PATRICK ST
TBD
B O
N G
AVE
TRUEMPER ST
BO
NG
AVE
HARM
O
N DR
TB
D
TBD
H O
LLO
W
M
AN
ST
TBD
HENSLEY ST
TB
D
TBD
Kelly Drive
GENTILE ST
C
RAW
AVE
TBD
H
UG
HES AVE
VANCE ST
NELLIS ST
RAN
GE
RD
TBD
D
IM
S
TE
A D
A V
E
Trabzon Street
SELFRIDGE BLVD
CONNALLY ST
MAXWELL ST
KNIGHT ST
SELFRIDGE BLVD
TBD
ARIZONA ST
SELFRIDGE AVE
TBD
REESE ST
FEMOYER ST
W
ILFO
RD
H
ALL LO
O
P
LACKLAND AIR FORCE BASE
HIGHWAY 90
VALLEY-HI
DRIVE
AIRMAN'S
GATE
SELFRIDGE
GATES
PROJECT
LOCATION
M
ILITARY
D
RIVE
BERGQUIST
GATE
LUKE STREET
GATE
BASE CONTRACTING
BLDG. 5450
BASE CIVIL
ENGINEERING
BLDG 5595
FIRE DEPT.
BLDG 2325
LACKLAND
AIRFIELD
W
. LO
O P 410
R E
LO
C
A
TE
T O
W E
R , S
IT
E
P R
E P
"S H
IP
IN
A B
O X
N
TT
C
, L A
C K
LA
N
D A
FB
, T
E X
A S
SHEET 1 OF 36
L A -0
LA12-0014
RELOCATE TOWER, SITE PREP "SHIP IN A BOX"
NTTC, LACKLAND AIR FORCE BASE
MPLS 11-0067
SANCHEZ
CONSTRUCTION
& DESIGN, INC.NN
NN
NN
GROWDON
GATE
COMMERCIAL/
CONTRACTOR
GATE ENTRANCE
PROJECT LOCATION MAP AND DELIVERY ROUTE3 NOT TO SCALE
VICINITY MAP2 NOT TO SCALE
VICINITY MAP1 NOT TO SCALE
1870 S. Brazos Street San Antonio, TX Ph: 210.744.6206 Fax: 210.228.9799
NN A-01
FA301620R0049 29 APR 2020 Attachment 9
GENERAL
A-01 COVER SHEET
A-02 SHEET INDEX
A-03 GENERAL NOTES
SEQUENCE
NUMBER
CIVIL
C-1 SITE DEMOLITION PLAN
C-2 PROPOSED SITE AND ROADWAY PLAN
C-3 SITE DETAILS
C-4 MOCK BRIG & MOCK SHIP FOUNDATION PLANS
C-5 TOWER FOUNDATION PLANS
ARCHITECTURAL
AT-1 MOCK BRIG INDEX & ABBREVIATIONS
AT-2 MOCK BRIG NOTES
A-1 MOCK BRIG FLOOR PLANS
A-2 MOCK BRIG FRONT AND LEFT SIDE ELEVATIONS
A-3 MOCK BRIG REAR AND RIGHT ELEVATIONS
A-4 MOCK BRIG ROOF PLAN
A-5 MOCK BRIG CROSS SECTIONS
A-6 MOCK BRIG DETAILS
A-7 MOCK BRIG DETAILS
SEQUENCE
NUMBER
ELECTRICAL
E-0 PRIMARY ELECTRICAL POWER PLAN
E-1 MOCK BRIG POWER PLAN
E-2 MOCK BRIG LIGHTING PLAN
E-3 MOCK BRIG PANEL SCHEDULE AND DETAILS
E-4 MOCK BRIG NETWORK AND FIRE PLAN
E-5 MOCK BRIG ELECTRICAL NOTES
E-6 TOWER ELECTRICAL POWER PLAN
SHEET INDEX
ARCHITECTURAL
A-8 TOWER NOTES
A-9 TOWER BASE PLATE LAYOUT
A-10 TOWER FLOOR PLAN LAYOUT
A-11 TOWER SOUTH ELEVATION LOOKING PLAN NORTH
A-12 TOWER EAST ELEVATION LOOKING PLAN WEST
A-13 TOWER LANDING ELEVATION DETAILS
A-14 TOWER STAIR AND LANDING DETAIL SHEET
A-15 TOWER STAIR GUARDRAIL AND HANDRAIL DETAILS
A-16 TOWER STAIR GUARDRAIL AND HANDRAIL DETAILS
A-17 TOWER MISCELLANEOUS DETAILS
MECHANICAL
M-1 MOCK BRIG HVAC NOTES AND SCHEDULES
M-2 MOCK BRIG MECHANICAL PLAN
R E
LO
C
A
TE
T O
W E
R , S
IT
E
P R
E P
"S H
IP
IN
A B
O X
N
TT
C
, L A
C K
LA
N
D A
FB
, T
E X
A S
SHEET 2 OF 36
L A -0
LA12-0014
A-02
SANCHEZ
CONSTRUCTION
& DESIGN, INC.
1870 S. Brazos Street San Antonio, TX Ph: 210.744.6206 Fax: 210.228.9799
PORTA-KING
Engineering Consultant / Electrical Engineering
2000 N.W. Military Hwy, Suite #4 San Antonio, Texas 78213
Tel: 210.541.0200 Fax: 210.402.5426
Email: edwardmonaco@satx.rr.com
TOWER DESIGN:
ECM
Engineering Consultant / Electrical Engineering
2000 N.W. Military Hwy, Suite #4 San Antonio, Texas 78213
Tel: 210.541.0200 Fax: 210.402.5426
Email: edwardmonaco@satx.rr.com
ELECTRICAL ENGINEER:
FALCON CONTAINERS
Engineering Consultant / Electrical Engineering
2000 N.W. Military Hwy, Suite #4 San Antonio, Texas 78213
Tel: 210.541.0200 Fax: 210.402.5426
Email: edwardmonaco@satx.rr.com
MOCK BRIG DESIGN:
10635
10504
10802
10634
10700
10706
10650
10395
10658
10670
10637
10656
10390
10900
10708 10904
10380
10810
10701
10534
10652
10806
10547
10800
10416
10385
10902
10540 10541
10338
10804
10808
10501
TBD
MEIVOHER DR
HABY'S RD
HUGHES AVE
TBD
M
C DILL DR
ENT CIRCLE
M
ETZG
ER
DR
LUKE BLVD
M C
DI
LL
D R
TBD
FEMOYER ST
ENT CIRCLE
EXISTNG PAD
TRANSFORMER
MOUNTED
EXISTING 12' FENCE
EXISTING 12' FENCE
EXISTING 12' FENCE
EXISTING 12' FENCE
ENT CIRCLE
HABY'S RD
R E
LO
C
A
TE
T O
W E
R , S
IT
E
P R
E P
"S H
IP
IN
A B
O X
N
TT
C
, L A
C K
LA
N
D A
FB
, T
E X
A S
SHEET 3 OF 36
L A -0
LA12-0014
NN NN
A-03
RELOCATE TOWER,
SITE PREP "SHIP IN A BOX"
NTTC, LACKLAND AFB, TEXAS
CONTRACT #: FA3047-11-C-0054
MPLS#: 11-0067
DRAWING #: LA12-0014
GENERAL NOTES:
1. THE GENERAL CONTRACTOR SHALL HAVE PARTIAL USE OF THE PREMISES FOR
CONSTRUCTION OPERATIONS. OPERATIONS OF WORKMEN, STORAGE OF MATERIAL, AND
ANY STAGING AREA COMPONENTS (TEMPORARY OFFICE AND PORT-O-LET, ETC.)
LOCATIONS TO BE APPROVED BY LACKLAND AFB.
2. ALL WORK SHALL BE PERFORMED TO COMPLY WITH THE 2009 INTERNATIONAL BUILDING
CODE, ELECTRICAL CODE AND FIRE CODE, AND ANY OTHER APPLICABLE CODES AND
BUILDING STANDARDS AS ADOPTED BY LACKLAND AFB, TEXAS.
3. THE CONTRACTOR AND LACKLAND AFB SHALL BE RESPONSIBLE FOR FINAL MATERIAL
AND PRODUCT SELECTIONS. THE CONSTRUCTION DOCUMENTS INDICATE GENERAL
DESIGN INTENT BUT MAY NOT DEFINE ALL STANDARDS AND PRODUCTS REQUIRED FOR
THE FULL PERFORMANCE AND CONSTRUCTION OF THE PROJECT. THE CONTRACTOR IS
RESPONSIBLE FOR REVIEW AND APPROVAL OF SUBMITTALS, SHOP DRAWINGS, ETC. FOR
COMPLIANCE WITH APPLICABLE INDUSTRY STANDARDS, CITY CODES AND ORDINANCES
AND WITH LACKLAND AFB.
4. COORDINATION OF SUBMITTALS FOR FABRICATION, PURCHASING, TESTING, DELIVERY,
WITH OTHER SUBMITTALS AND RELATED CONSTRUCTION OPERATIONS IS THE
RESPONSIBILITY OF THE CONTRACTOR. SUBMITTALS TO INCLUDE QUALITY CONTROL
PROCEDURES, DESIGN DATA, CERTIFICATIONS, MANUFACTURER'S INSTRUCTIONS, AND
WARRANTY INFORMATION (1 YEAR MINIMUM).
5. THE CONTRACTOR IS RESPONSIBLE FOR OVERSIGHT OF ALL PHASES OF THE PROJECT IN
RELATION TO APPLICABLE INDUSTRY STANDARDS FOR THE MATERIALS AND PRODUCTS
INCORPORATED INTO THE PROJECT.
6. THE CONTRACTOR IS RESPONSIBLE FOR TESTING AND/OR INSPECTIONS UNLESS NOTED
OTHERWISE.
7. CONTRACTOR TO COORDINATE OVERHEAD DUCTWORK, CONDUIT, ETC.
SUBCONTRACTOR TO PROVIDE SHOP DRAWINGS FOR DESIGN APPROVAL AND
COORDINATION PURPOSES.
8. ALL DRAWINGS AND SPECIFICATIONS ARE PART OF THE CONSTRUCTION DOCUMENTS.
CONSTRUCTION DOCUMENTS, INCLUDING DESIGN, ELECTRICAL, CIVIL, STRUCTURAL,
ETC. ARE TO BE USED TOGETHER. ANY DISCREPANCIES BETWEEN THE DOCUMENTS OR
EXISTING CONDITIONS ARE TO BE REPORTED TO THE DESIGNER FOR INTERPRETATION
AND/ OR CLARIFICATION PRIOR TO PROCEEDING WITH ANY WORK RELATED TO THE
DISCREPANCY.
9. ENERGY REQUIREMENTS: DESIGN OF NEW CONSTRUCTION AND RENOVATIONS SHALL BE
IN FULL COMPLIANCE WITH ANSI//IESNA/ASHRA STANDARDS WITH SPECIFIC ATTENTION
TO ASHRA STANDARD 90.1-2004. NEW CONSTRUCTION AND RENOVATIONS FOR
EXISTING FACILITIES MUST COMPLY WITH ENERGY POLICY ACT OF 2005 (EPACT 05),
EXECUTIVE ORDER CRITERIA, UFC 3-400-01 05 JULY 2002, UFC 3-410-01FA 15 MAY 03,
UFC 3-410-02A 15 MAY 03, UFC 3-440-01 14 JUN 02 OR LATEST EDITION FOR ALL. AIR
FORCE DESIGN SUSTAINABILITY SHALL BE APPLIED IN THE DESIGN, CONSTRUCTION,
ENVIRONMENTAL MANAGEMENT, OPERATION, MAINTENANCE AND DISPOSAL OF
FACILITIES AND INFRASTRUCTURE PROJECT, CONSISTENT WITH BUDGET AND MISSION
REQUIREMENTS.
10. ENERGY REQUIREMENTS: NEW CONSTRUCTION OF AGENCY BUILDINGS MUST COMPLY
WITH THE PRINCIPLES FOR FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS SET FORTH IN THE FEDERAL LEADERSHIP IN HIGH
PERFORMANCE AND SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING
(2006) AS PER “EXECUTIVE ORDER: STRENGTHENING FEDERAL ENVIRONMENTAL,
ENERGY, AND TRANSPORTATION MANAGEMENT” & LEED REQUIREMENTS.
11. CONTRACTOR IS RESPONSIBLE FOR SAFETY, SECURITY AND PROTECTION OF EXISTING
IMPROVEMENTS THROUGHOUT THE DURATION OF CONSTRUCTION.
12. HQ AETC DIRECTION ON THE PROCUREMENT OF AIR COOL CHILLERS. AIR COOL
CHILLERS ARE NOT TO EXCEED 150 TONS.
13. CONTRACTOR IS RESPONSIBLE FOR OVERSIGHT
OF TESTING AND/OR INSPECTIONS UNLESS
NOTE OTHERWISE: (IE: SOILS, AGGREGATE BASE
MATERIAL, CONCRETE, ELECTRICAL, AND
HVAC TEST AND BALANCE, ETC.)
14. ALL UNDERGROUND ELECTRICAL (UGE) WORK
(FEEDERS, CONDUIT, ETC.) TO BE PERFORMED
BEFORE NEW ROADWORK.
LOCATION MAP1 NOT TO SCALE
LOCATION MAP2 NOT TO SCALE
NN
NN
STRUCTURE AND SITE GENERAL NOTES:
1. TOTAL SITE WORK AREA:
APRX. 465' X 425' = APRX. 197,625 SF
2. WITHIN A TOTAL SITE OF:
APRX. 790' X 380' = APRX. 300,200 SF
300,200 SF = APRX. 6.89 ACRES
3. TOTAL ACTUAL STRUCTURE FOUNDATION AREAS AND ROADWAY AREA:
MOCK BRIG - 40' X 40' = 1,600 SF
TOWER - 20' X 21' = 420 SF
MOCK SHIP - 70' X 66' = 4,620 SF
TRANSFORMER - 10' X 10' = 100 SF
ROADWAY - 800' x 14' = 11,200 SF
TOTAL SQUARE FOOTAGE = 17,940 SF
4. THIS PROJECT DESIGN SHALL CONFORM TO THE CODE CRITERIA IDENTIFIED IN THE STATEMENT
OF WORK PROVIDED IN CONTRACT BETWEEN CONTRACTOR AND LACKLAND AIR FORCE
BASE.
5. BUILDING AND SITE SERVICES: SITE IS CURRENTLY SERVICED BY LACKLAND AIR FORCE BASE.
6. LANDSCAPING AND PARKING: NOT INCLUDED IN CONTRACT, AND TO BE DETERMINED AT A
LATER DATE BY LACKLAND AIR FORCE BASE. LANDSCAPE THAT IS INCLUDED IN
CONTRACT, INCLUDES LAYING DOWN 2 INCHES OF TOPSOIL APPROXIMATELY 15 FEET
AROUND THE ROADWAY AND ANY DISTURBED AREA INCLUDING THE CONTRACTOR
STAGING AREA AND ALL WORK TRAFFIC AREAS.
7. BUILDING AND SITE LIGHTING: EXTERIOR BUILDING LIGHTING SHALL BE INSTALLED ACCORDING
TO PLANS. EXTERIOR POLE LANDSCAPE LIGHTING AND PARKING LIGHTING ARE NOT
INCLUDED IN CONTRACT AND TO BE DETERMINED AT A LATER DATE BY LACKLAND AIR
FORCE BASE.
8. IT SHALL BE UNLAWFUL TO MODIFY, CHANGE, OR ALTER ANY STRUCTURE OR USE SHOWN ON
THIS SITE PLAN IN ANYWAY WHATSOEVER, OR CONVERT OR ALTER ANY STRUCTURE OR
USE SHOWN ON THIS SITE PLAN, OR CHANGE THE ABOVE USE INDICATED ON THE PLAN
WITHOUT RECEIVING APPROVAL FROM LACKLAND AIR FORCE BASE.
9. A PRE-CONSTRUCTION MEETING WITH LACKLAND AIR FORCE BASE CONTRACTING, PLANNING, ENGINEERING AND FIRE OFFICIALS SHALL TAKE PLACE PRIOR TO ANY WORK BEING
PERFORMED.
10. THE FINAL SITE PLAN / PROJECT PLAN SHALL BE APPROVED BY LACKLAND AIR FORCE BASE
CONTRACTING AND CIVIL ENGINEERING.
11. NO WORK SHALL BEGIN WITHOUT A DIGGING PERMIT APPROVED BY LACKLAND AIR FORCE
BASE. CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH PROPER UTILITY
COMPANIES AND LACKLAND AIR FORCE BASE UTILITY SHOPS FOR SIGNATURES TO CLEAR
DIGGING PERMIT AND MARK WORK SITE WITH PROPER COLORED MARKING PAINT AND
FLAGGING WHERE NECESSARY.
12. NO WORK SHALL BEGIN WITHOUT WRITTEN APPROVAL AND NOTICE TO PROCEED FROM
LACKLAND AIR FORCE BASE CONTRACTING.
13. PROTECTION OF WATER RESOURCES THE CONTRACTOR SHALL COMPLY WITH TEXAS
COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ) MS4 TXR040068 PERMIT AND THE
ATTACHED FLOW CHART TO DETERMINE WHETHER COVERAGE IS REQUIRED. NO
DISCHARGES TO THE WASTE WATER COLLECTION SYSTEM ARE PERMITTED IF THE
EFFLUENT IS PROHIBITED BY SAN ANTONIO WATER SYSTEM (SAWS) INDUSTRIAL WASTE
WATER PERMIT HV-0062.
SANCHEZ
CONSTRUCTION
& DESIGN, INC.
1870 S. Brazos Street San Antonio, TX Ph: 210.744.6206 Fax: 210.228.9799
NEW ROADWAY
14' WIDE NEW GATE
MOCK SHIP LOCATION
MOCK BRIG LOCATION
TOWER LOCATION
NEW FENCE
ENERGY REQUIREMENTS:
1. TOTAL ENERGY REQIREMENTS: DESIGN OF NEW CONSTRUCTION AND RENOVATIONS SHALL BE
IN FULL COMPLIANCE WITH ANSI//IESNA/ASHRA STANDARDS WITH SPECIFIC ATTENTION
TO ASHRA STANDARD 90.1 LATEST EDITION. IN ADDITION, NEW CONSTRUCTION AND
RENOVATIONS FOR EXISTING FACILITIES MUST COMPLY WITH ENERGY POLICY ACT OF 2005
(EPACT 05), EXECUTIVE ORDER 13423, ENERGY INDEPENDENCE & SECURITY ACT (EISA) OF
2007 AND ENERGY CONVERSATION STANDARDS UNDER UNIFIED FACILITIES CRITERIA;
LATEST EDITION FOR ALL.
UFC 3-400-01 ENERGY CONSERVATION WITH CHANGE 4
UFC 3-410-01FA, HEATING, VENTILATING, AD AIR CONDITIONIN
UFC 3-410-02A, HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS
UFC 3-440-01 DESIGN - ACTIVE SOLAR PRHEAT SYSTEMS
EISA SECTION 523 SOLAR WATER EQUIPMENT
AIR FORCE DESIGN SUSTAINABILITY SHALL BE APPLIED IN THE DEVELOPMENT CONCEPTS
OF PLANNING, DESIGN, CONSTRUCTION, ENVIRONMENTAL MANAGEMENT, OPERATION,
MAINTENANCE AND DISPOSAL OF FACILITIES AND INFRASTRUCTURE PROJECT, CONSISTENT
WITH BUDGET AND MISSION REQUIREMENTS.
14' WIDE NEW GATE
5' SIDEWALK
CUT FENCE TO BOTH SIDE OF DRIVEWAY
AND SET NEW CORNER END PULL POSTS
(SEE SHEET C-3, DETAIL FE5 )
54'
74'-0"
40'-0"
22'-1"
14'-0"
14'-0"
EXISTING 12' FENCE
EXISTING 8' FENCE
EXISTING 12' FENCE
EXISTING 12' FENCE
E
A
D
C
A
F
G
A
A A
B
221'-6"
HABY'S RD
R
R
R
R
50'-0"
F
240'-0" 40'-0"
14'-0"
40'-0"
33'-9" 33'-9"
EXCAVATE 1'-4 1/2" FOR NEW 14'-0" WIDE ASPHALT ROAD. ALL
EXCAVATED MATERIAL SHALL BE MANIFESTED AND TRANSPORTED TO
A SPECIFIC SITE APPROVED BY LACKLAND AIR FORCE BASE CE
ENVIRONMENTAL. FOR THIS PROJECT, THE SITE THAT HAS BEEN
APPROVED BY LAFB CE ENVIRONMENTAL. CONTRACTOR TO GET WITH
LAFB CE PROJECT MANAGER FOR THE EXACT APPROVED DUMP SITE.
SAWCUT AND REMOVE 70'-0" X 74'-0" SECTION OF ASPHALT FOR NEW
MOCK SHIP CONCRETE FOUNDATION.
SEE CIVIL SHEET C-4 FOR DETAILS.
SAWCUT AND REMOVE 50'-0" X 50'-0" SECTION OF ASPHALT FOR NEW
MOCK BRIG FOUNDATION.
SEE CIVIL SHEET C-4 FOR DETAILS.
DEMO & REMOVE EXISTING CONCRETE AIRCRAFT DISPLAY PAD.
BUILD UP WITH A2 BASE AND PATCH WITH 2" OF TYPE "D" ASPHALT.
SAWCUT AND REMOVE 22'-1" X 21'-11" SECTION OF ASPHALT FOR
NEW TOWER FOUNDATION.
SEE CIVIL SHEET C-5 FOR EXACT DETAILS.
DEMO SECTION OF EXISTING FENCE FOR NEW DOUBLE SWING GATE,
SEE SHEET C-2, DETAIL 2.
DEMOLITION KEY NOTES
A
B
C
D
E
F
DEMO SECTION OF EXISTING FENCE, ADD TWO (2) NEW CORNER END
PULL POSTS TO BOTH CUT ENDS ON BOTH SIDES OF ROADWAY. SEE
SHEET C-3, DETAIL FE5 - CHAIN LINK SECURITY FENCE.
G
R E
L O
C A
T E
O W
E R
S
I T
E
P
R E
P
S
H I P
N
A
B
X
N T
T C
L A
C K
L A
D
F B
T
E X
A S
SHEET 4 OF 36
L A -0
LA12-0014
C-1
SITE DEMOLITION PLAN
SCALE : 1/32" = 1' - 0"
NN
NN
SANCHEZ
CONSTRUCTION
& DESIGN, INC.
1870 S. Brazos Street San Antonio, TX Ph: 210.744.6206 Fax: 210.228.9799
KEY NOTES
1. EXCAVATE 1'-4 1/2" FOR NEW 14'-0" WIDE ASPHALT ROAD. ALL EXCAVATED MATERIAL SHALL BE MANIFESTED AND
REMOVED FROM [MAIN] LACKLAND AIR FORCE BASE AND TRANSPORTED TO LACKLAND TRAINING ANNEX (MEDINA
BASE). SITE HAS BEEN APPROVED BY CE ENVIRONMENTAL. CONTRACTOR TO GET WITH LAFB CE PROJECT MANAGER
FOR THE EXACT APPROVED DUMP SITE.
2. SAW-CUT AND REMOVE 70'-0" X 74'-0" SECTION OF ASPHALT FOR NEW MOCK SHIP CONCRETE FOUNDATION. SEE
CIVIL SHEET C-4 FOR DETAILS.
3. SAW-CUT AND REMOVE 50'-0" X 50'-0" SECTION OF ASPHALT FOR NEW MOCK BRIG FOUNDATION. SEE CIVIL SHEET
C-4 FOR DETAILS.
4. 40'-0" X 40'-0" MOCK BRIG BUILDING EDGE TO BE PLACED IN LINE WITH EDGE OF NEW ASPHALT ROADWAY. SEE
CIVIL SHEET C-4 FOR DETAILS.
5. DEMO & REMOVE EXISTING CONCRETE AIRCRAFT DISPLAY PAD. BUILD UP WITH A2 BASE AND PATCH WITH 2" OF
TYPE "D" ASPHALT.
6. SAW-CUT AND REMOVE APPROXIMATELY 22'-1" X 21'-11" SECTION OF ASPHALT FOR NEW TOWER FOUNDATION. SEE
CIVIL SHEET C-5 FOR DETAILS.
7. TOWER CONCRETE FOUNDATION TO BE ALIGNED WITH EDGE OF EXISTING MOCK SHIP ASPHALT. SEE CIVIL SHEET
C-3 FOR DETAILS.
8. NEW ROADWAY WILL BE 14' WIDE. SEE CIVIL SHEET C-3 FOR DETAILS.
9. UTILITY TRENCH DETAILS ON PRIMARY ELECTRICAL POWER PLAN SHEET E-0.
10.ELEVATION OF TOPS OF ALL STRUCTURE FOUNDATIONS SHALL BE 6" ABOVE FINISH GRADE.
SEE PAGES C3, C4, & C5 FOR DETAILS.
11.PROTECT UTILITIES AND OBTAIN DIG PERMIT. CONTRACTOR RESPONSIBLE FOR ALL REPAIRS TO DAMAGED UTILITIES
/ EQUIPMENT THAT HAVE BEEN MARKED ON THE DIG PERMIT. CONTRACTOR IS NOT RESPONSIBLE FOR UNFORSEEN
UTILITIES / EQUIPMENT. CONTRACTOR IS NOT RESPONSIBLE FOR UNMARKED UTILITIES/EQUIPMENT THAT SHOULD
HAVE BEEN MARKED ONSITE BY THE RESPONSIBLE PARTY SIGNING / APPROVING THAT LINE ITEM OF WHICH THEY
ARE RESPONSIBLE FOR ON THE DIG PERMIT - THE NEGLIGENT PARTY SIGNING / APPROVING WILL BE HELD
RESPONSIBLE.
54'
74'-0"
40'-0"
14'-0"
EXISTING 12' FENCE
EXISTING 8' FENCE
EXISTING
12' FENCE
EXISTING 12' FENCE
221'-6"
HABY'S RD
14' NEW GATE
(SEE DETAILS)
14' WIDE NEW GATE
(SEE DETAILS)
NEW 8' FENCE
TO MATCH EXISTING
12' FENCE
22'-1"
NEW TOWER FOUNDATION
EDGE TO MATCH EDGE THE
EXISTING PAVEMENT EDGE
11'-2"
PROPOSED
MOCK BRIG
LOCATION
PROPOSED
TOWER
LOCATION
PROPOSED
MOCK SHIP
FOUNDATION
PROPOSED
ROADWAY
EXISTING
ROADWAY
R
R
R
R
NEW MOCK BRIG BUILDING
EDGE TO MATCH EDGE THE
NEW ROADWAY EDGE
53' +/-
14'-0"
240'-0"
40'-1 1/2"
14'-0"
40'-0"
33'-9" 33'-9"
6'-3"
R
R
EXTERIOR
DOOR
EXTERIOR
DOOR
R E
L O
C A
W
E R
S
I T
E
P
R E
P
S
H
X
N T
T C
L A
C K
L A
B
T
E X
A S
SHEET 5 OF 36
L A -0
LA12-0014
C-2
PROPOSED SITE AND ROADWAY PLAN
NN
NN
SANCHEZ
CONSTRUCTION
& DESIGN, INC.
1870 S. Brazos Street San Antonio, TX Ph: 210.744.6206 Fax: 210.228.9799
SCALE : 1/32" = 1' - 0"
DOUBLE SWING GATE DETAILS - PLAN AND ELEVATION
SCALE : NOT TO SCALE
COMPACTED AGGREGATE
BASE COURSE
1'-6"
CONCRETE 3000 PSI
STIRRUPS #3 BARS
@ 16" O.C.
#4 BARS @ 12" O.C. EACH WAY
6 MIL POLY
VAPOR BARRIER
FINISH FLOOR
(3) #8 BARS TOP & BOTTOM
W/#3 TIES @18" O.C
6"
MIN.
NOTE: SUBGRADE TO BE LIME
STABILIZED (6%) A MINIMUM
OF 6" UNDER ABC BASE COURSE
AND COMPACTED TO 95%.
SIDEWALK
2% SLOPE
12" x 12" WELDED WIRE MESH
FOR SIDEWALK
5' WIDE, 4" THICK SIDEWALK TO
SURROUND MAIN FOUNDATION PAD
FOR MOCK BRIG AND MOCK SHIP 18" DOWELS @ 18"
O.C. WITH EPOXY
6" 6"
CONCRETE 3000 PSI
FINISH FLOOR#4 BARS @ 12" O.C.
EACH WAY
MIN.
COMPACTED AGGREGATE
BASE COURSE
NOTE: SUBGRADE TO BE LIME
STABILIZED (6%) A MINIMUM
OF 6" UNDER ABC BASE COURSE
AND COMPACTED TO 95%.
STIRRUPS #3 BARS
@ 16" O.C.
6 MIL POLY
VAPOR BARRIER
(3) #8 BARS TOP & BOTTOM
W/#3 TIES @18" O.C
EXTERIOR CORNER TEE INERSECTION
TYPICAL TIES
MAIN BEAM
REINFORCING
OUTSIDE
FACE OF
BEAM
OUTSIDE
FACE OF
BEAM
TYPICAL CORNER BARS
PROVIDED BARS OF SAME
SIZE AS MAIN REINFORCING
AT TOP & BOTTOM AT MAIN
REINFORCING BARS BEND: 2'
-0
2'-0"
TYPICAL
CORNER
BARS
2'-0" MIN.
TYP. LAP
2' -0
M
IN
TY
P.
L
AP
16"
FOUNDATION LINE#5 BENT BARS @ 6"
FROM TOP & BOTTOM
& 24" O.C. INTERIOR
NOTE:BEAM/SLAB
REINFORCEMENT
NOT SHOWN
FOR CLARITY
#6 BENT BARS
@ 6" FROM TOP
& BOTTOM AND
24" O.C. INTERIOR
NOTE:BEAM/SLAB
REINFORCEMENT
NOT SHOWN
FOR CLARITY
FOUNDATION LINE
2'-6"
2' -6
2 1
2" TYPE-B ASPHALT
1 1
2" TYPE-D ASPHALT
8" #2 BASE (ABC/AGGREGATE BASE COURSE)
6" LIME STABILIZED (6%) SCARIFIED SUB-GRADE, THEN COMPACTED TO 95%
(UNDISTURBED SUB-GRADE)
PRIME OIL (24 HRS PRIOR TO ASPHALT)
NOTE: SUBGRADE TO BE LIME
STABILIZED (6%) A MINIMUM
OF 6" UNDER ABC BASE COURSE
AND COMPACTED TO 95%.
2" TOPSOIL TO BE
APPLIED 15' AWAY
FROM ROADWAY
SEE PAGE A-6 FOR DETAILS OF ELECTRICAL
UTILITY ENTRANCE AT MOCK BRIG. AT MOCK
SHIP, STUB-OUT 10 FEET TOWARDS 'MDP'
PANEL. 'MDP' PANEL WILL BE PREPPED AND
STUBBED-OUT 10 FEET TOWARDS MOCK SHIP.
4" PCV ELBOW
4" PVC
4" PCV STUB-UP
SLEEVE TO BE USED AT CONCRETE PENETRATIONS
6"
SIDEWALK
2% SLOPE2% GRADE
STEEL POST SCHEDULE
USE AND SECTION
MINIMUM OUTSIDE DIMENSIONS (NOMINAL)
FABRIC WIDTH 72" OR LESS FABRIC WIDTH 84" TO 96" FABRIC WIDTH 108" AND OVER
NOTES:
FENCE LEGEND:
FE5 CHAIN-LINK SECURITY FENCE DETAIL
NO SCALE
NO SCALE
FASTENING DETAILS
BRACE RAIL CLAMP DETAILS
ROUND POST
H-BEAM
TENSION BAND DETAIL
END OR GATE POST DETAIL
TOP OR BRACE RAIL ATTACHMENT
ROUND POST
LINE POST ATTACHMENTS
TRUSS ROD AND BAND
NO SCALE
LINE POST
EXTENSION ARM DETAILS
CORNER POST
NO SCALE
SUB-GRADE
4" SPACER @ 5' O.C. ALONG
TRENCH
INSTALL INDICATOR TAPE
PER CODE
4" PVC CONDUIT
CONCRETE ENCASEMENT
AGGREGATE BASE COURSE
(MATCH EXIST. THICKNESS)
ASPHALT PATCHWORK
(MATCH EXIST. THICKNESS)
NOTE: AGGREGATE AND
ASPHALT TO BE USED AT
PATCHWORK ONLY.
EXISTING ASPHALT
EXISTING AGGREGATE
COMPACTED BACKFILL
SAWCUT ASPHALT FOR A STRAIGHT
CLEAN EDGE
SAWCUT ASPHALT FOR A STRAIGHT
CLEAN EDGE
R E
LO
C
A
TE
T O
W E
R , S
IT
E
P R
E P
"S H
IP
IN
A B
O X
N
TT
C
, L A
C K
LA
N
D A
FB
, T
E X
A S
SHEET 6 OF 36
L A -0
LA12-0014
C-3
SANCHEZ
CONSTRUCTION
& DESIGN, INC.
1870 S. Brazos Street San Antonio, TX Ph: 210.744.6206 Fax: 210.228.9799
1 TYPICAL EXTERIOR BEAM AND SIDEWALK - B1
SCALE: 1/2" = 1'-0" 2 TYPICAL INTERIOR BEAM - B2
SCALE: 1/2" = 1'-0"
8 CORNER REINFORCEMENT
SCALE: 1/2" = 1'-0"6 REINFORCEMENT AT INTERSECTION
SCALE: 1/2" = 1'-0"
7 REINFORCEMNET AT INT. BEAM
SCALE: 1/2" = 1'-0"
5 TYPICAL ROADWAY SECTION
SCALE: NOT TO SCALE
3 UTILITY STUB-OUT AT CONCRETE
SCALE: 1/2" = 1'-0"
4 ASPHALT UTILITY CUT REPAIR
SCALE: 1/2" = 1'-0"
6" THICK SLAB
W/#4 @ 12" O.C.E.W.
B2
B1 B1
B2 B1
B1 B1
B1
B1 B1 B1B1
B1 B1 B1B1
60' MATCHES MOCK SHIP BUILDING
DIMENSION OF 60' X 64'
B2 B2 B2
B2 B2 B2
B2 B2
B2 B2 B2
B2B2B2B2
' M
AT
CH
ES
M
O
CK
S H
IP
B
U
IL
D
IN
G D
IM
EN
SI
O
N O
F
' X
4'
6" THICK SLAB
W/#4 @ 12" O.C.E.W. B1
B1
B1 B1
B1B1
B1B1
B1B1
40' MATCHES MOCK BRIG BUILDING
DIMENSION OF 40' X 40'
' M
AT
CH
ES
M
O
CK
B
RI
G B
U
IL
D
IN
G D
IM
EN
SI
O
N O
F
' X
0'
B2
B2
B2B2
B2
B2 B2
BEAM SCHEDULE
BEAM
MARK
BEAM SIZES
WIDTH DEPTH
REINFORCING
TOP BOTTOM STIRRUPS
B1
B2
18" 36" 2-#8 2-#8 #4 @ 18"
18" 30" 2-#8 2-#8
*NOTES: 1) 3000 PSI CONCRETE.
2) 6" THICKNESS CONCRETE SLAB.
#4 @ 18"
COMPACTED AGGREGATE
BASE COURSE
1'-6"
CONCRETE 3000 PSI
STIRRUPS #3 BARS
@ 16" O.C.
#4 BARS @ 12" O.C. EACH WAY
6 MIL POLY
VAPOR BARRIER
FINISH FLOOR
(3) #8 BARS TOP & BOTTOM
W/#3 TIES @18" O.C
6"
MIN.
NOTE: SUBGRADE TO BE LIME
STABILIZED (6%) A MINIMUM
OF 6" UNDER ABC BASE COURSE
AND COMPACTED TO 95%.
SIDEWALK
2% SLOPE
12" x 12" WELDED WIRE MESH
FOR SIDEWALK
5' WIDE, 4" THICK SIDEWALK TO
SURROUND MAIN FOUNDATION PAD
FOR MOCK BRIG AND MOCK SHIP 18" DOWELS @ 18"
O.C. WITH EPOXY
6" 6"
CONCRETE 3000 PSI
FINISH FLOOR#4 BARS @ 12" O.C.
EACH WAY
MIN.
COMPACTED AGGREGATE
BASE COURSE
NOTE: SUBGRADE TO BE LIME
STABILIZED (6%) A MINIMUM
OF 6" UNDER ABC BASE COURSE
AND COMPACTED TO 95%.
STIRRUPS #3 BARS
@ 16" O.C.
6 MIL POLY
VAPOR BARRIER
(3) #8 BARS TOP & BOTTOM
W/#3 TIES @18" O.C
R E
LO
C
A
TE
T O
W E
R , S
IT
E
P R
E P
"S H
IP
IN
A B
O X
N
TT
C
, L A
C K
LA
N
D A
FB
, T
E X
A S
SHEET 7 OF 36
L A -0
LA12-0014
C-4
SANCHEZ
CONSTRUCTION
& DESIGN, INC.
1870 S. Brazos Street San Antonio, TX Ph: 210.744.6206 Fax: 210.228.9799
1 MOCK SHIP FOUNDATION PLAN
SCALE: 1/8" = 1'-0"
2 BRIG FOUNDATION PLAN
SCALE: 1/8" = 1'-0"
2 TYPICAL EXTERIOR BEAM AND SIDEWALK - B1
SCALE: 1/2" = 1'-0" 3 TYPICAL INTERIOR BEAM - B2
SCALE: 1/2" = 1'-0"
NN
NN
NN
NN
OPENING
TRANSFORMER
OPENING
24" DEEP PERIMETER BEAM
24" DEEP PERIMETER BEAM
D
EE
P
PE
RI
M
ET
ER
B
EA
M
D
EE
P
PE
RI
M
ET
ER
B
EA
M
TRANSFORMER
OPENING
TRANSFORMER
OPENING
CONCRETE 3000 PSI
STIRRUPS #3 BARS
@ 16" O.C.
(2) #5 BARS TOP & BOTTOM
W/#3 TIES @18" O.C.
#4 BARS @ 12" O.C. EACH
WAY
FINISH FLOOR
TRANSFORMER
4" CHAMFER ON
TOP ALL EDGES OF
CONCRETE
4" CHAMFER ON
TOP ALL EDGES OF
CONCRETE
TRANSFORMER
OPENING
OPENING
TRANSFORMER
FOUNDATION PAD OUTER EDGE
FOUNDATION PAD INNER
EDGE OF OPENING
R E
LO
C
A
TE
T O
W E
R , S
IT
E
P R
E P
"S H
IP
IN
A B
O X
N
TT
C
, L A
C K
LA
N
D A
FB
, T
E X
A S
SHEET 8.1 OF 36
L A -0
LA12-0014
C-4.1
R
L O
C A
W
E R
S
I T
E
P
R E
P
S
H
X
N T
T C
L A
C K
L A
B
T
E X
A S
SHEET 8 OF 36
L A -0
LA12-0014
C-5
FA301620R0049 29 APR 2020 Attachment 9
Gilbert Text Box 20'- 0"
IS THE AS-BUILT DEPTH.
(15'- 0" DEPTH WAS THE MINIMUM DESIGN REQUIREMENT)
Gilbert Text Box
Gilbert Text Box
Gilbert Polygon
A/C AIR CONDITIONING
AB ANCHOR BOLT
AC ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
AD AREA DRAIN
ADDL ADDITIONAL
ADH ADHESIVE
ADJ ADJACENT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ANS AMERICAN NATIONAL STANDARDS INSTITUTE
APA AMERICAN PLYWOOD ASSOCIATION
APPROX APPROXIMATE
ASSY ASSEMBLY
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AUX AUXILIARY
AVG AVERAGE
AWS AMERICAN WELDING SOCIETY
B PL BASE PLATE
BLDG BUILDING
BM BEAM
BOS BOTTOM OF STEEL
BOT BOTTOM
C CHANNEL
CB CARRIAGE BOLT
CB CATCH BASIN
CIP CAST-IN-PLACE
CJ CONSTRUCTION JOINT
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONFIG CONFIGURATION
CONN CONNECT
CONT CONTINUE
CSK COUNTER SUNK
CU CUBIC
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
DBL DOUBLE
DEG DEGREE
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIR DIRECTION
DJ DOUBLE JOIST
DL DEAD LOAD
DP DIAMOND PLATE
DS DOWNSPOUT
DWG DRAWING
E EAST
EA EACH
EL ELEVATION
EMBED EMBEDMENT
EP EDGE OF PAVEMENTS
EQ EQUAL
EQUIP EQUIPMENT
ETC ET CETERA
EW EACH WAY
FDN FOUNDATION
FIN FINISH
FIN. FLR. FINISH FLOOR
FIN GR FINISH GRADE
FLR FLOOR
FOC FACE OF CONCRETE
FOS FACE OF SLAB
FOS FACE OF STUD
FOW FACE OF WALL
FRP FIBERGLASS REINFORCED PLASTIC
FSTNR FASTENER
FT FOOT (FEET)
FTG FOOTING
GA GAGE
GALV GALVANIZED
GL GROUND LEVEL
GLZ GLAZING
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
HDR HEADER
HORIZ HORIZONTAL
HSS HOLLOW STRUCTURAL SECTION
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
ISO INTERNATIONAL STANDARDS ORGANIZATION
LBS POUND
LF LINEAR FEET (FOOT)
LONG LONGITUDINAL
MAX MAXIMUM
MB MACHINE BOLT
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
mm MILLIMETER
MTL METAL
N/A NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
PERP PERPENDICULAR
PL PROPERTY LINE
PLYWD PLYWOOD
PN PART NUMBER
PRELIM PRELIMINARY
PREP PREPARATION
PT PRESSURE TREATED
QTY QUANTITY
R RADIUS
REINF REINFORCE
REQD REQUIRED
REV REVISION
RM ROOM
SHED SCHEDULE
SF SQUARE FOOT (FEET)
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS STAINLESS STEEL
ST STREET
STA STATION
STD STANDARD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TEMP TEMPORARY
THK THICKNESS
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FINISH FLOOR
TOF TOP OF FOOTING
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TOS TOP OF STEEL
TOW TOP OF WALL
TS TUBE STEEL
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
VIF VERIFY IN FIELD
W WATT
W/ WITH
W/O WITHOUT
WP WORKING POINT
WWF WELDED WIRE FABRIC
MOCK BRIG DRAWING ABBREVIATIONS
U S
IN
G
A G E N C Y
F
IR
E
C H
IE
F
(C E F S
R E V
D A T E
P R O J E C T
N U M B E R
D R A W
IN
G
N U M B E R
S C A L E
D R A W N
B Y
E N G
IN
E E R D E S
IG
N E R
R E
LO
C
A
TE
T O
W E
R , S
IT
E
P R
E P
"S H
IP
IN
A B
O X
N
TT
C
, L A
C K
LA
N
D A
FB
, T
E X
A S
C O N S T R U C T A B
IL
IT
Y
R E V
IE
W
(C E P M D
D E S
IG
N
T E A M
C H
IE
F
(C E P M D
SHEET 9 OF 35
L A -0
LA12-0014
DATE
APPVD
Cathodic Protection Engineer (CEOE)
Lackland/WHMC OPS (CEO/CEW)
Military Public Health (ISAP)
Bioenvironmental Engineer (ISAB)
Base Energy Monitor (CEOE)
Explosive Safety Officer (SEW)
Ground Safety Officer (SEG)
Security Police (SFS/SFOSS)
Communication Officer (CS/SCX)
Base Development (CECB)
Environment Flight (CEV)
COORDINATION
Int/Ext Fac. Excellence (CECC2)
SIGNATURES
AT-1
1. DIMENSIONS SHOWN ON THE DRAWINGS TAKE PRECEDENCE OVER SCALED
MEASUREMENTS. DO NOT SCALE DRAWINGS.
2. PLAN DIMENSIONS ARE TAKEN FROM FACE OF SURFACE TO FACE OF SURFACE OR GRID
LINE.
3. PLAN DIMENSIONS ARE TAKEN FROM FACE OF STRUCTURE, FINISH OR GRID LINE,
UNLESS OTHERWISE NOTED. TYPICAL FOR FLOOR PLANS AND DETAILS.
4. DETAILS ARE DIAGRAMMATICAL AND MAY DIFFER IN SCALE FROM PROPOSED
CONDITIONS.
5. DETAILED DRAWINGS AND LARGER SCALE DRAWINGS TAKE PRECEDENCE OVER SMALL
SCALE DRAWINGS.
6. DETAILS LABELED TYP (TYPICAL) SHALL BE FABRICATED AT ALL LIKE CONDITIONS
THROUGHOUT THE PROJECT UNLESS OTHERWISE NOTED. DETAILS LABELED SIM
(SIMILAR) SHALL BE FABRICATED WITH MINOR DIFFERENCES AS SHOWN IN THE DETAIL.
7. FOR DETAILS NOT SHOWN, USE THE MANUFACTURER'S STANDARD DETAILS OR
APPROVED SHOP DRAWINGS/DATA SHEETS IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS.
8. SHOP DRAWINGS ARE SUPERSEDED BY THESE DRAWINGS UNLESS APPROVED BY
ENGINEER.
9. THE CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND
CONDITIONS ON THE JOB AND SHALL NOTIFY THE ARCHITECT/ENGINEER OF ANY
DISCREPANCIES BEFORE COMMENCING ANY WORK.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL METHODS OF FABRICATION. SHORING,
SCAFFOLDING, FORMWORK, ETC., MAY REQUIRE ADDITIONAL STRUCTURAL DESIGN.
11. THE CONTRACTOR SHALL PROVIDE, LOCATE, AND INSTALL ACCESS PANELS AS
REQUIRED AFTER INSTALLATION OF MECHANICAL AND ELECTRICAL WORK.
12. ALL EQUIPMENT, DEVICES, FIXTURES AND MATERIALS SHALL BE LISTED BY AN
APPROVED TESTING AGENCY.
13. ALL MATERIAL SYSTEMS SHALL BE NON-COMBUSTIBLE WITH A FLAME SPREAD RATIO
OF 25 OR LESS, SMOKE DEVELOPING RATING OF 50 OR LESS THAN A FUEL
CONTRIBUTING OF ZERO.
14. CONNECTING HARDWARE SHALL BE RATED FOR OPERATION UNDER AMBIENT
CONDITIONS OF -40 TO 140 DEGREES FAHRENHEIT AND IN THE RANGE OF 0 TO 100
PERCENT RELATIVE HUMIDITY.
GENERAL NOTES
EXTERIOR FINISH SCHEDULE
INTERIOR FINISH SCHEDULE
GENERAL BUILDING MATERIALS
MECHANICAL SCHEDULE
ELECTRICAL SCHEDULE
1. SEE CIVIL DRAWINGS OF DRAWING SET FOR BUILDING PAD FOUNDATION PREPARATION
BUILDING PAD PREP
U S
IN
G
A G E N C Y
F
IR
E
C H
IE
F
(C E F S
R E V
D A T E
P R O J E C T
N U M B E R
D R A W
IN
G
N U M B E R
S C A L E
D R A W N
B Y
E N G
IN
E E R D E S
IG
N E R
R E
LO
C
A
TE
T O
W E
R , S
IT
E
P R
E P
"S H
IP
IN
A B
O X
N
TT
C
, L A
C K
LA
N
D A
FB
, T
E X
A S
C O N S T R U C T A B
IL
IT
Y
R E V
IE
W
(C E P M D
D E S
IG
N
T E A M
C H
IE
F
(C E P M D
SHEET 10 OF 36
L A -0
LA12-0014
DATE
APPVD
Cathodic Protection Engineer (CEOE)
Lackland/WHMC OPS (CEO/CEW)
Military Public Health (ISAP)
Bioenvironmental Engineer (ISAB)
Base Energy Monitor (CEOE)
Explosive Safety Officer (SEW)
Ground Safety Officer (SEG)
Security Police (SFS/SFOSS)
Communication Officer (CS/SCX)
Base Development (CECB)
Environment Flight (CEV)
COORDINATION
Int/Ext Fac. Excellence (CECC2)
SIGNATURES
AT-2
| 01 - A-01 |
| 02 - A-02 |
| 03 A-03 A |
| 04 - C-1 B |
| 05 - C-2 B |
| 07 - C-3 A |
| 08 - C-4 A |
| 08 - C-4-1 A |
| 09 - C-5 A |
| 10 - AT-1 |
| 10 - AT-2 |
File details come from the government source that posted it. Updated .