Attachment_5_-_WORK_AUTHORIZATION3.docx
DOCX document 24 KB Posted
- Attached to
- TYPE 3 WILD LAND FIRE ENGINE (OTA/DGS)
- Solicitation number
- 0000031681
- Issued by
- California
About this file
This document is a Work Authorization related to a procurement for a TYPE 3 WILD LAND FIRE ENGINE by the California Department of General Services (DGS). The Work Authorization outlines the scope of work, schedule, and itemized one-time and ongoing costs for the procurement. The related state and local contract opportunity indicates that this is a competitive solicitation, with electronic bids not allowed. The solicitation number is BU 4440 0000031681, and the bid submission instructions, event contacts, and state agency details are provided. The contract term and any renewal options are not specified.
The Work Authorization requires the supplier to perform the work in accordance with the provisions of the associated Purchase Order. The total work authorization cost is to be provided. Further details on pricing terms, set-asides, incumbents, funding requirements, and other salient information are not included in the provided documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_BS_4440-0305787.pdf | ||
| Attachment_4_-_NARRATIVE_RESPONSE3.docx | DOCX document | |
| FINAL_FIRE_TRUCK_0000031681_Type_3_IFB.pdf | ||
| APP_Cover_Page.pdf | ||
| Attachment_2_-_ADMIN_REQUIREMENTS.docx | DOCX document | |
| Attachment_3_-_COST_WORKSHEET3.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Department of General Services | TYPE 3 WILD LAND FIRE ENGINE | |
| Procurement Division | BU 4440 0000031681 |
Attachment 5
Attachment 5 - WORK AUTHORIZATION
Work Authorization Number: 1
Description of Work
Schedule Start Date: Completion Date:
Itemized and Total One-time Costs (includes cost reductions for Equipment deletion)
Itemized and Total On-going Costs (includes cost reductions for Equipment deletion)
TOTAL WORK AUTHORIZATION COST: $ _________________
This task will be performed in accordance with this Work Authorization and the provisions of Purchase Order # ____.
Supplier:
OSP:
Name and Title
Name and Title
Signature
Signature
Date
Date
File details come from the government source that posted it. Updated .