Sheet1

Attachment 5 for FA441920R0001
Ordering Period of $9,000,000
CategoryAdjusted Amount Based on Percent of Estimated VolumeProposed Coefficient (Insert Value X.XX) (Note 2)Adjusted Total Estimated Value (Note 3)
Standard Hours 0700-1600 hrs$8,100,000.00
Non-Standard Hours$900,000.00
TOTAL PROPOSED PRICE FOR ORDERING PERIOD (Note 4)$9,000,000.00
1. Estimated volume is based on a maximum contract value of $9M over 3 years ($3M per year), and will be used for evaluation purposes only. The offeror should not consider this figure as any indication of proposed contract usage, nor base the proposed coefficient rates on any expectation that such levels of award will be made by the Government.
2. Submit 2 coefficients, 1 for standard hours, 1 for non-standard hours. A coefficient is the contractor's pricing factor which is multiplied against the standard unit prices in calculating task order (TO) prices. It is proposed by offerors as a percentage increase (e.g., 1.10) or decrease (e.g., 0.95) to the current edition of the Unit Price Guide (UPG). They include all cost elements not included in the current UPG (e.g., overhead, profit, G&A expenses, bond premiums, gross receipts taxes, quality control, clean-up, subcontractor mark-up, labor burden, mobilization/demobilization, permits and licenses, taxes, depreciation, as-built drawings, submittals, site security, cost for design, equipment rental, insurance for employees, portable toilets, traffic barricades, flag persons, additional supervision, and paperwork fees associated with a particular TO, etc.). The coefficient should be limited to no more than 2 decimal places (x.xx).
3. This amount is based on the adjusted annual amount for each category listed times the proposed coefficient provided by the offeror. As in Note 1 above, this amount is for evaluation purposes only and does not reflect any anticipated volume of dollard to be awarded under the resulting contract. The offeror should not fill in this estimated amount/value.
4. This figure will be used by the Government to determine which offeror has provided the lowest overall price to the Government.
5. If the Government directs a work schedule during nonstandard working hours, the coefficient entered for the Non-Standard Hours or Secured Area Non-Standard Hours will be applied depending on the location of work. The term "Nonstandard Working Hours" is not to be interpreted as "overtime." The contractor may be allowed to work during the nonstandard hourse at his request when approved by the Contracting Officer and coordinated with the SABER project manager. The Government will not pay for nonstandard hours in these instances.
6. The Contracting Officer shall, concurrent with exercise of any annual option, incorporate the current applicable Davis Bacon Wage Decision, which shall become effective on the first day of the option period and shall remain effective for the entire option period. The contractor shall compensate all covered employees at not less that the rates specified on the Wage Decision applicable to the current option period; however, no contract price adjustment to the coefficient will be made relative to incorporation of any Wage Decision.

File details come from the government source that posted it. Updated .