Attachment 5 Technical Acceptability Certifications - 2.docx
DOCX document 36 KB Posted
- Solicitation number
- N4215826QE007
About this file
This file is a Technical Acceptability Certifications document that establishes mandatory technical requirements for demineralizer rigs being quoted for the High Quality Water & Demineralized Feedwater contract. Contractors must certify compliance with each specified capability by initialing corresponding YES or NO boxes for all rigs quoted, with the completed document required for award consideration.
The demineralizer rigs must meet multiple technical specifications including: processing a maximum of 16,500 gallons daily (8,250 per location) and 6,022,500 gallons annually across Norfolk Naval Shipyard and Naval Station Norfolk; connecting to existing potable water supplies as constant sources; and incorporating minimum equipment of activated charcoal filters, demineralizer resin beds, 80-micron metal edge-type outlet filters, and conductivity monitoring devices with audio/visual alarms. Output water must meet strict quality parameters: conductivity ≤2.5 micromhos per centimeter, pH 6.0-8.0, chloride ≤0.1 ppm, chloride ≤0.1 ppm, silica ≤0.2 ppm, halogenated organics ≤0.1 ppm, non-halogenated total organic carbon ≤2.0 ppm, and sodium ≤20.0 ppb. Each rig must include flushing modes with automatic shutoff capabilities, be capable of processing minimum 150,000 gallons without regeneration based on 300 mg/L total dissolved solids, operate at 50-200 gpm nominal flow rate with minimum 30 psig inlet pressure and maximum 100 psig output pressure, and feature sample valves, totalizing flowmeters, high-point vents, and freeze protection for year-round operation. Physical requirements specify rigs be no greater than 12 feet wide by 60 feet long, roadworthy and easily moveable, with unique identification markings and electrical compatibility for 120 VAC single-phase or 440 VAC three-phase operation. Contractors must provide schematics showing all components, supply calibration certifications, handle regeneration at their facility within six-hour changeout limits, and provide TDS level charts for situations exceeding 300 mg/L, with government payment prorated proportionally if rigs produce less than the required 150,000 gallons.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N4215826QE0070001 SF 30.pdf | ||
| Attachment 4 QASP - High Quality Water.docx | DOCX document | |
| Solicitation - N4215826QE007 (1).pdf | ||
| Attachment 1 Contract Administration Plan (CAP) Firm Fixed Price (FFP).docx | DOCX document | |
| Attachment 3 Past Performance Questionairre.docx | DOCX document | |
| Attachment 2 Past Performance Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL ACCEPTABILITY CERTIFICATIONS
The Contractor shall certify they either meet or do not meet each technical capability listed below by initialing in the applicable YES or NO box. To be considered for award the entire table of this Attachment shall be completed for the demineralizer rigs being quoted and shall be submitted with the quote.
| TECHNICAL CAPABILITY FOR DEMINERALZIER RIGS |
| YES |
| NO |
The estimated maximum total gallons to be processed daily at NNSY and NOB Norfolk is 16,500 (8,250 at each location).
The estimated maximum total gallons to be processed yearly at NNSY and NOB Norfolk is 6,022,500 (3,011,250 at each location), or 6,039,000 for leap years (3,019,500 at each location).
Each rig shall connect to the existing NNSY Potable Water Supply (NNSY PWS) and the NOB Norfolk Potable Water Supply (NOB Norfolk PWS) as a constant source of supply and shall typically not be secured for any significant length of time.
| TECHNICAL ACCEPTABILITY FOR DEMINERALZIER RIGS |
| YES |
| NO |
Each rig shall have, at a minimum, the following equipment: (A) an activated charcoal filter to remove organics upstream of a resin bed, (B) a demineralizer resin bed, (C) an 80 micron or finer metal edge-type outlet filter downstream of the activated charcoal filter and resin bed, and (D) a conductivity monitoring device in the outlet which activates audio and visual alarms when conductivity exceeds 2.5 micromhos per centimeter and shuts the valve as specified below. The use of multiple small demineralizers (on the order of 1 to 2 cubic feet) is not acceptable.
Each rig shall provide demineralized water within the following specifications when supplied with water from the NNSY SOW and the NOB Norfolk SOW:
Conductivity = Less than or equal to 2.5 micromhos per centimeter pH = 6.0 to 8.0
Chloride = Less than or equal to 0.1 parts per million
Visual Clarity = No turbidity, oil, sediment, or resin beads
Silica = Less than or equal to 0.2 parts per million
Halogenated Organics = Less than or equal to 0.1 parts per million
Non-Halogenated Total Organic Carbon = Less than or equal to 2.0 parts per million
Sodium = Less than or equal to 20.0 parts per billion
| TECHNICAL ACCEPTABILITY FOR DEMINERALZIER RIGS |
| YES |
| NO |
Each rig shall be equipped with a flushing mode. When out of specification water is detected and regular delivery stops, the water shall be flushed, either manually or automatically, until the water returns to specification or when 500 gallons has been flushed, whichever comes first. When the water returns to the required specifications a sample shall be taken and certified, by the NNSY and NOB Norfolk Test Facilities, as applicable, before delivery may resume. If the water does not return to the desired specifications within the 500 gallon limit, the applicable rig shall be considered exhausted and is required to be processed as specified below.
All automatic shutoff devices shall be fail-safe, that is, if power is lost they shall automatically switch to a closed position allowing no water to flow and shall not operate until power has been restored.
All gages, flowmeters, switches, and indicator lights shall be accessible for on-site monitoring.
All gages, meters, and totalizers shall be calibrated by the Contractor with a dated certification sticker attached to each item per the manufacturer’s suggested schedule.
Based on average Total Dissolved Solids (TDS) of 300 mg/L, each rig shall be capable of processing a minimum of 150,000 gallons of demineralized water without regeneration. No automatic shutoff at 150,000 gallons is allowed. The intent is to produce demineralized water for as long as each rig operates within specification. Water quality shall be monitored by conductivity alarm and sampling, as required, to ensure in-process quality. No water used for flushing of a rig shall be counted as part of the product water. Water inlet temperature may vary within NNSY and NOB Norfolk; however, the maximum temperature shall not exceed 100 degrees Fahrenheit.
Each rig shall be designed to operate at a nominal flow rate of 50 gpm to 200 gpm with a minimum inlet pressure of 30 psig. The minimum design pressure of each rig shall be 100 psig. Each rig’s output pressure shall not exceed 100 psig at any time. Each rig’s flow rate shall not exceed 200 gpm at any time.
| TECHNICAL ACCEPTABILITY FOR DEMINERALZIER RIGS |
| YES |
| NO |
Each rig shall have a sample valve located downstream from all water processing, which shall be prominently marked “SAMPLE VALVE”. Inlet and outlet connections shall be outside each rig. The inlet shall be a 2-1/2 inch fire hose connection.
The outlet shall be a 1-1/2 inch quick disconnect cam locking connection.
The flush point shall be a 1-1/2 inch quick disconnect cam locking connection. NNSY and NOB Norfolk shall provide the required hoses and fittings to connect to the rigs.
Each rig shall have a totalizing flowmeter located on the discharge side downstream of the flush point. The totalizer portion shall be accurate between 50 gpm to 200 gpm.
Each rig shall be provided with high point vents so that all air shall be vented from the system when the Contractor regenerates. Each rig shall also be constructed so that all air shall be vented from pipes, resin beds, activated charcoal filters, etc. The pipe upstream of the inlet valve and downstream of the outlet valve shall have high point vents.
Each rig shall be roadworthy and easily moveable within NNSY and NOB Norfolk by the Contractor (wheeled trailers are preferred). Each rig shall have a unique identification marking, either numeric or alphanumeric. Each rig shall be no greater than 12 feet wide x 60 feet long in overall external dimensions. If supplemental equipment that does not fit inside a rig is required (this is not preferred), then that equipment shall be easily movable within NNSY and NOB Norfolk and shall fit on a maximum of 2 each skids that each shall be no greater than 8 feet wide x 8 feet long in overall external dimensions. The Contractor shall provide overall external dimensions of each rig and a description of the mounting configuration as part of the proposal.
Each rig shall have sufficient electric freeze protection equipment to operate at NNSY and NOB Norfolk 365 days per year (366 days per leap year). NNSY and NOB Norfolk personnel shall provide necessary electrical power and cables to each rig. Each rig shall clearly identify all applicable electrical requirements. Thermometers shall be installed to monitor inside temperature and shall be accessible for viewing outside of each rig. .
The freeze protection equipment and the remaining equipment in each rig shall be capable of operating on either 120 VAC 60 Hz single phase electricity, or 440 VAC 60 Hz three phase electricity
| TECHNICAL ACCEPTABILITY FOR DEMINERALZIER RIGS |
| YES |
| NO |
Each rig shall be schematically identical in that the position of the components shall meet the requirements specified above. A current schematic of each rig shall be provided with the proposal. At a minimum each schematic shall show: (A) activated charcoal filters, (B) resin beds, (C) valves, (D) detectors, (E) totalizing flowmeters, (F) inlet and outlet connections, (G) sample points, (H) flush and drain points, (I) vent points, (J) filters, and (K) pumps and motors of each rig, if applicable. All valves, breakers, etc. that NNSY and NOB Norfolk personnel operate shall be clearly identified with a numbering system consistent from rig to rig. No changes to a rig’s configuration are allowed, after Contract award, without approval from the Contracting Officer. Any approved change to the configuration shall be reflected in the rig’s schematic. These schematics shall be clearly posted in weatherproof placards on each rig.
The Contractor is not authorized to operate any NNSY and NOB Norfolk owned manifolds, valves, or drains that are attached to the Contractor’s rig unless under the direct supervision of the applicable NNSY and NOB Norfolk personnel qualified to the cleanliness requirements of the system as identified by either the COR or the ACORs.
The Contractor shall regenerate exhausted rigs at the Contractor’s facility to operate at 100% of rated capacity. Activated charcoal filters shall be changed yearly. Rigs shall be returned with all regeneration chemicals flushed out, all air vented, and inlet and outlet connections closed and capped. However, if required, NNSY and NOB Norfolk personnel shall provide a facility to flush and vent the rigs upon delivery in lieu of having these operations performed at the Contractor’s facility. No changing or regeneration of resin shall be performed at NNSY and NOB Norfolk.
The changeout time shall not exceed 6 hours. This shall, in most cases, permit removal and changeout of a rig within a single 8 hour shift.
The Government shall prorate the cost per regeneration for any rig failing to produce the Contract requirement of a minimum of 150,000 gallons of demineralized water. If a rig produces only a portion of the required amount the Government shall only pay a comparable portion of the cost per regeneration.
| TECHNICAL ACCEPTABILITY FOR DEMINERALZIER RIGS |
| YES |
| NO |
Prior to delivery, the Contractor shall provide a chart, graph, or scale(s) giving the limits, in gallons, of acceptable water to be expected when the NNSY PWS and the NOB Norfolk PWS TDS level exceeds 300 mg/L. If the TDS level exceeds 300 mg/L, it is the Contractor’s responsibility to provide either the COR or the ACORs information from the NNSY PWS and the NOB Norfolk PWS stating the TDS level for any given day. Other justification shall be supplied and supported by the Contractor when a rig produces less than 150,000 gallons of demineralized water. The information provided by the Contractor shall then be used as part of the evaluation for the proration of moneys.