Attachment 5 - Task Order 2 - Bid Item 2 - Houston.pdf

PDF 14 MB Posted

Attached to
Vegetation Management Service IDIQ for the Mark Twain National Forest
Solicitation number
12444521R0005
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12444521R0005 Attachment 5 – Task Order #2, Bid Item #2

Schedule of Items BID ITEM 2 –- Houston/Rolla Ranger District

Period of Performance: 01 September 2021 – 15 April 2022

Task/Sub-Task

ACRES Unit Price

(PER ACRE)

Extended Price (Unit Price x Acres)

A) Non-Herbicide

2.1. SITE PREPARATION Even-aged Regeneration 37

2.3. SITE PREPARATION Uneven-aged Regeneration

3.1. Glade Restoration (Low-Medium Density; <400 TPA)

5.1 Slash Disposal (30 inches)

Total Non-Herbicide

B) Herbicide

4.7 Cut Stump-Site Prep

4.8. CUT STUMP- Midstory Control

4.13. CUT STUMP- Midstory Control w/Slash Removal

from Residual Trees

Total Herbicide

Grand Total

Each offeror shall identify their quoted unit price and total line item price. Offeror may offer on either A) Non-Herbicide OR B)Herbicide or offer on both.

ITEM DESCRIPTION, CONTRACT LINE ITEMS:

Refer to the attached Technical Specifications beginning on Page 3 of the PWS for the award project listed above.

Note1: For Task/Sub-Task Item 3.1 Glade Restoration- only cedars will be required to be cut (no hardwoods).

Note2: For Herbicide work the below table shows what herbicides are acceptable, the need for basal oil and blue colorant.

Active Ingredient Acceptable Herbicide(s) Basal Oil Required

Water Required

Surfactant Required

Colorant

Triclopyr Ester Garlon 4 (20%) or Garlon 4 Ultra (20%)

Yes (80%) No No Blue (% as directed by label)

For Technical information contact Lisa Linn at Telephone Number 417-967-4194

Contractor Duns #

Signature Date

Merrill

Knotwell

L. Linn 7/23/20

FY21 Veg Contract Vicinity MapÙ2ñU S Ù2ñU S

0 1 2 3 4 Miles ±

Duke Blowdown

Vision

Stray Elk

¬«1

¬«M1

11 12

14 13 18

*All roads, trails, and fire lines are to remain clear and open during and after tree felling operations.* *Slash work will occur within 50 feet of designated roads. Slash will be reduced to less than 30 inches tall.*

Legend Ponds State Highway County Road F.S. System Rd F.S. Non-System Rd Private Road

4WT

Section Lines Private Forest Service

Task Unit Acres 1 21

Total 21

M1 18

Total 18

Site Preparation (Even-Aged)

Midstory Removal with Herbicide

Streamcourses. Slash and other debris resulting from the Contractor's operations shall be removed from the streamcourse

FY21 Contract Silv Work Visionl Area Ù2ñU S Ù2ñU S

Ü 1:15,840 Linn 3/17/2021

0 0.1 0.2 0.3 0.4 Miles á á á á á á ááá áááááá á áááááááááá á ááááááá á á á á á á á á á

P

P

$7550

$7550

5 4

32 33

8 9

29 28

¬«C1

¬«C5

¬«C6

¬«C2

¬«1

¬«3 ¬«C3

¬«2

¬«C4

¬«4

¬«5

*All roads, trails, and fire lines are to remain clear and open during and after tree felling operations.* *Slash work will occur within 50 feet of designated roads. Slash will be reduced to less than 30 inches tall.*

Legend Ponds State Highway County Road F.S. System Rd F.S. Non-System Rd Private Road

4WT

Section Lines Private Forest Service

FY21 Contract Silv Work Knotwell Area - Compartment 211

Phelps County, T36N, R09W, Sec 4, 5 T37N, R09W, Sec 32, 33

Ù2ñU S Ù2ñU S

Ü 1:15,840 Linn 3/17/2021

0 0.1 0.2 0.3 0.4 Miles

Task Unit Acres 1 23 2 16 3 20 4 14 5 10

Total 83 C1 51 C2 24 C3 18 C4 17 C5 37 C6 29

Total 176 1 1 3 0.5 4 1

C3 1 C4 0.5 C5 4

Total 8

Cut Stump Midstory with Slash

Streamcourses. Slash and other debris resulting from the Contractor's operations shall be removed from the streamcourse

Glade Restoration (Cedar Removal)

Slash Disposal (30") for 50 Feet

S S S S S S S á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á á

$7550

4 3

¬«C3

¬«C2

¬«C1

*All roads, trails, and fire lines are to remain clear and open during and after tree felling operations.* *Slash work will occur within 50 feet of designated roads. Slash will be reduced to less than 30 inches tall.*

Ü 1:15,840 Linn 5/18/2020

0 0.1 0.2 0.3 0.4 Miles

Legend Ponds State Highway County Road F.S. System Rd F.S. Non-System Rd Private Road

4WT

Section Lines Private Forest Service

FY21 Contract Silv Work Merrill Area - Compartment 211

Phelps County, T36N, R09W, Sec 4, 9, 10, 15 Ù2ñU S Ù2ñU S

Task Unit Acres C1 35 C2 88 C3 92

Total 215 C1 1 C2 4 C3 4

Total 9

Glade Restoration (Cedar Removal)

Slash Disposal (30") for 50 feet

Streamcourses. Slash and other debris resulting from the Contractor's operations shall be removed from the streamcourse

Ph elp s C ou nty

K

Pu las ki Co un ty

T34N R10W 45676630

2A

169-WALKER

1-6

169-WESTERN

7837A

A

S2S1

R ²0 0.15 0.30.075 Miles

1:15,840 T. Ozier 9/11/17

Ù2ñU S FY21 Silv Work Pocket Eddy Blowdown H/R/CC Ranger District

Mark Twain National Forest

TASK UNIT ACRES

Site Prepw/Herbicide 1 2 2 7 3 26 4 9 5 3 6 5 7 3 8 25

TOTAL 80

TASK UNIT ACRES

Site Prep (Chainsaw) S1 8 S2 8

TOTAL 16

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S S S S S S S S S S

S S S S S

¬«3

¬«2 ¬«6

¬«4

¬«5

¬«8

¬«9

¬«1

¬«7

¬«10

Legend SitePrep_Units_LynchburgFY21

S S sss_SitePrep_StrayElk_LynchburgFY21²0 0.1 0.2 0.30.05 Miles

1:18,000 T. Ozier 2/13/2020

Site Prep-Uneven-Aged Stray Elk Area (Compts 89, 90) Houston R.D. of the Mark Twain NF Wright County, T32N R13W Sec 23-25 T32N R12W Sec 19

Unit Acres Slash Acres

1 25 0 2 58 0 3 60 2 4 44 0 5 42 0 6 48 3 7 22 2 8 30 0 9 27 3 10 12 1

TOTAL 368 11

K

J

T34N R10W Phelps County

161-6590

1-6

1503B

1771AA1771A

S2

R ²0 0.15 0.30.075 Miles

1:15,840 T. Ozier 9/11/17

Ù2ñU S FY21 Silv Work Trout Cemetery Blowdown

H/R/CC Ranger District Mark Twain National Forest

TASK UNIT ACRES

Site Prepw/Herbicide 1 4

2 5 3 16 4 19 5 18 6 6 7 2

TOTAL 70

Schedule of Items - Bid Item #2 rv2
Vicinity_Silv_FY21
Vision_FY21_Silv
Knotwell_FY21_Silv
Merrill_FY21_Silv
PocketEddyBlowdown_Silv_FY21
SitePrep_StrayElkLynchburg_FY21
TroutCemBlowdown_Silv_FY21

File details come from the government source that posted it. Updated .