Attachment 1 - Schedule of Items - Veg Mgt IDIQ.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- 12444521R0005
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Sal
| Salem (SAL) RD - Schedule of Items (SOI) | Estimated | Unit | Price | Price | Price | Price | Price |
| Annual | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||
| Quantity | 2022 | 2023 | 2024 | 2025 | 2026 | ||
| Task/SubTask | |||||||
| A) Non-Herbicide Tasks | |||||||
| 1. STAND IMPROVEMENT | |||||||
| 1.1. Release - Manual (Pine) | 30 | Acre | $ | $ | $ | $ | $ |
| 1.2. Precommercial Thinning - PCT (crop tree release) | 150 | Acre | $ | $ | $ | $ | $ |
| 2. SITE PREPARATION BY FELLING | |||||||
| 2.1 Evenaged Regeneration | 300 | Acre | $ | $ | $ | $ | $ |
| 2.2 Storm Damage Salvage Regeneration | 300 | Acre | $ | $ | $ | $ | $ |
| 2.3 Unevenaged Regeneration | 200 | Acre | $ | $ | $ | $ | $ |
| 3. RESTORATION TREATMENTS | |||||||
| 3.1 Glade restoration | 200 | Acre | $ | $ | $ | $ | $ |
| 3.2 Midstory Control | 200 | Acre | $ | $ | $ | $ | $ |
| 5. Slash Disposal | |||||||
| 5.1 Slash Disposal (30 inches) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.2 Slash Disposal (18 inches) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.3 Slash Disposal ( Hand Piling) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.4 Slash Disposal (Dispersal) | 50 | Acre | $ | $ | $ | $ | $ |
| A) Non-Herbicide Tasks Annual Total | $ | $ | $ | $ | $ |
| B) Herbicide Tasks | |||||||
| 4. HERBICIDE APPLICATION | |||||||
| 4.1 Foliar Spray - Pine Release | 50 | Acre | $ | $ | $ | $ | $ |
| 4.2 Foliar Spray - General Forest Vegetaion | 50 | Acre | $ | $ | $ | $ | $ |
| 4.3 Hack and Squirt - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.4 Hack & Squirt- Site Prep | 50 | Acre | $ | $ | $ | $ | $ |
| 4.5 Hack and Squirt - Midstory Control | 50 | Acre | $ | $ | $ | $ | $ |
| 4.6 Cut Stump - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.7 Cut Stump - Site Prep | 50 | Acre | $ | $ | $ | $ | $ |
| 4.8 Cut Stump - Midstory Control | 50 | Acre | $ | $ | $ | $ | $ |
| 4.9. Basal Bark Treatment - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.10 Basal Bark Treatment - General Forest | 50 | Acre | $ | $ | $ | $ | $ |
| 4.11 Add-on of Foiliar Spray to Hack and Squirt or Cut Stump | 50 | Acre | $ | $ | $ | $ | $ |
| 4.12 Add-on of Hack and Squirt to Basal Bark Treatment of Stems >6" | 50 | Acre | $ | $ | $ | $ | $ |
| 4.13 CUT STUMP- Midstory Control with Slash Removal from Residual Trees | 50 | Acre | $ | $ | $ | $ | $ |
| B) Herbicide Tasks Annual Total | $ | $ | $ | $ | $ |
2. PFT
| Potosi/Fredericktown (PFT) RD - Schedule of Items (SOI) | Estimated | Unit | Price | Price | Price | Price | Price |
| Annual | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||
| Quantity | 2022 | 2023 | 2024 | 2025 | 2026 | ||
| Task/SubTask | |||||||
| A) Non-Herbicide Tasks | |||||||
| 1. STAND IMPROVEMENT | |||||||
| 1.1. Release - Manual (Pine) | 30 | Acre | $ | $ | $ | $ | $ |
| 1.2. Precommercial Thinning - PCT (crop tree release) | 150 | Acre | $ | $ | $ | $ | $ |
| 2. SITE PREPARATION BY FELLING | |||||||
| 2.1 Evenaged Regeneration | 300 | Acre | $ | $ | $ | $ | $ |
| 2.2 Storm Damage Salvage Regeneration | 300 | Acre | $ | $ | $ | $ | $ |
| 2.3 Unevenaged Regeneration | 200 | Acre | $ | $ | $ | $ | $ |
| 3. RESTORATION TREATMENTS | |||||||
| 3.1 Glade restoration | 200 | Acre | $ | $ | $ | $ | $ |
| 3.2 Midstory Control | 200 | Acre | $ | $ | $ | $ | $ |
| 5. Slash Disposal | |||||||
| 5.1 Slash Disposal (30 inches) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.2 Slash Disposal (18 inches) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.3 Slash Disposal ( Hand Piling) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.4 Slash Disposal (Dispersal) | 50 | Acre | $ | $ | $ | $ | $ |
| A) Non-Herbicide Tasks Annual Total | $ | $ | $ | $ | $ |
| B) Herbicide Tasks | |||||||
| 4. HERBICIDE APPLICATION | |||||||
| 4.1 Foliar Spray - Pine Release | 50 | Acre | $ | $ | $ | $ | $ |
| 4.2 Foliar Spray - General Forest Vegetaion | 50 | Acre | $ | $ | $ | $ | $ |
| 4.3 Hack and Squirt - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.4 Hack & Squirt- Site Prep | 50 | Acre | $ | $ | $ | $ | $ |
| 4.5 Hack and Squirt - Midstory Control | 50 | Acre | $ | $ | $ | $ | $ |
| 4.6 Cut Stump - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.7 Cut Stump - Site Prep | 50 | Acre | $ | $ | $ | $ | $ |
| 4.8 Cut Stump - Midstory Control | 50 | Acre | $ | $ | $ | $ | $ |
| 4.9. Basal Bark Treatment - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.10 Basal Bark Treatment - General Forest | 50 | Acre | $ | $ | $ | $ | $ |
| 4.11 Add-on of Foiliar Spray to Hack and Squirt or Cut Stump | 50 | Acre | $ | $ | $ | $ | $ |
| 4.12 Add-on of Hack and Squirt to Basal Bark Treatment of Stems >6" | 50 | Acre | $ | $ | $ | $ | $ |
| 4.13 CUT STUMP- Midstory Control with Slash Removal from Residual Trees | 50 | Acre | $ | $ | $ | $ | $ |
| B) Herbicide Tasks Annual Total | $ | $ | $ | $ | $ |
3. ACW
| Ava/Cassville/Willow Springs (ACW) RD - Schedule of Items (SOI) | Estimated | Unit | Price | Price | Price | Price | Price |
| Annual | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||
| Quantity | 2022 | 2023 | 2024 | 2025 | 2026 | ||
| Task/SubTask | |||||||
| A) Non-Herbicide Tasks | |||||||
| 1. STAND IMPROVEMENT | |||||||
| 1.1. Release - Manual (Pine) | 30 | Acre | $ | $ | $ | $ | $ |
| 1.2. Precommercial Thinning - PCT (crop tree release) | 150 | Acre | $ | $ | $ | $ | $ |
| 2. SITE PREPARATION BY FELLING | |||||||
| 2.1 Evenaged Regeneration | 300 | Acre | $ | $ | $ | $ | $ |
| 2.2 Storm Damage Salvage Regeneration | 300 | Acre | $ | $ | $ | $ | $ |
| 2.3 Unevenaged Regeneration | 200 | Acre | $ | $ | $ | $ | $ |
| 3. RESTORATION TREATMENTS | |||||||
| 3.1 Glade restoration | 200 | Acre | $ | $ | $ | $ | $ |
| 3.2 Midstory Control | 200 | Acre | $ | $ | $ | $ | $ |
| 5. Slash Disposal | |||||||
| 5.1 Slash Disposal (30 inches) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.2 Slash Disposal (18 inches) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.3 Slash Disposal ( Hand Piling) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.4 Slash Disposal (Dispersal) | 50 | Acre | $ | $ | $ | $ | $ |
| A) Non-Herbicide Tasks Annual Total | $ | $ | $ | $ | $ |
| B) Herbicide Tasks | |||||||
| 4. HERBICIDE APPLICATION | |||||||
| 4.1 Foliar Spray - Pine Release | 50 | Acre | $ | $ | $ | $ | $ |
| 4.2 Foliar Spray - General Forest Vegetaion | 50 | Acre | $ | $ | $ | $ | $ |
| 4.3 Hack and Squirt - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.4 Hack & Squirt- Site Prep | 50 | Acre | $ | $ | $ | $ | $ |
| 4.5 Hack and Squirt - Midstory Control | 50 | Acre | $ | $ | $ | $ | $ |
| 4.6 Cut Stump - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.7 Cut Stump - Site Prep | 50 | Acre | $ | $ | $ | $ | $ |
| 4.8 Cut Stump - Midstory Control | 50 | Acre | $ | $ | $ | $ | $ |
| 4.9. Basal Bark Treatment - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.10 Basal Bark Treatment - General Forest | 50 | Acre | $ | $ | $ | $ | $ |
| 4.11 Add-on of Foiliar Spray to Hack and Squirt or Cut Stump | 50 | Acre | $ | $ | $ | $ | $ |
| 4.12 Add-on of Hack and Squirt to Basal Bark Treatment of Stems >6" | 50 | Acre | $ | $ | $ | $ | $ |
| 4.13 CUT STUMP- Midstory Control with Slash Removal from Residual Trees | 50 | Acre | $ | $ | $ | $ | $ |
| B) Herbicide Tasks Annual Total | $ | $ | $ | $ | $ |
4. HRCC
| Houston/Rolla/Cedar Creek (HRCC) RD - Schedule of Items (SOI) | Estimated | Unit | Price | Price | Price | Price | Price |
| Annual | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||
| Quantity | 2022 | 2023 | 2024 | 2025 | 2026 | ||
| Task/SubTask | |||||||
| A) Non-Herbicide Tasks | |||||||
| 1. STAND IMPROVEMENT | |||||||
| 1.1. Release - Manual (Pine) | 30 | Acre | $ | $ | $ | $ | $ |
| 1.2. Precommercial Thinning - PCT (crop tree release) | 150 | Acre | $ | $ | $ | $ | $ |
| 2. SITE PREPARATION BY FELLING | |||||||
| 2.1 Evenaged Regeneration | 300 | Acre | $ | $ | $ | $ | $ |
| 2.2 Storm Damage Salvage Regeneration | 300 | Acre | $ | $ | $ | $ | $ |
| 2.3 Unevenaged Regeneration | 200 | Acre | $ | $ | $ | $ | $ |
| 3. RESTORATION TREATMENTS | |||||||
| 3.1 Glade restoration | 200 | Acre | $ | $ | $ | $ | $ |
| 3.2 Midstory Control | 200 | Acre | $ | $ | $ | $ | $ |
| 5. Slash Disposal | |||||||
| 5.1 Slash Disposal (30 inches) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.2 Slash Disposal (18 inches) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.3 Slash Disposal ( Hand Piling) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.4 Slash Disposal (Dispersal) | 50 | Acre | $ | $ | $ | $ | $ |
| A) Non-Herbicide Tasks Annual Total | $ | $ | $ | $ | $ |
| B) Herbicide Tasks | |||||||
| 4. HERBICIDE APPLICATION | |||||||
| 4.1 Foliar Spray - Pine Release | 50 | Acre | $ | $ | $ | $ | $ |
| 4.2 Foliar Spray - General Forest Vegetaion | 50 | Acre | $ | $ | $ | $ | $ |
| 4.3 Hack and Squirt - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.4 Hack & Squirt- Site Prep | 50 | Acre | $ | $ | $ | $ | $ |
| 4.5 Hack and Squirt - Midstory Control | 50 | Acre | $ | $ | $ | $ | $ |
| 4.6 Cut Stump - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.7 Cut Stump - Site Prep | 50 | Acre | $ | $ | $ | $ | $ |
| 4.8 Cut Stump - Midstory Control | 50 | Acre | $ | $ | $ | $ | $ |
| 4.9. Basal Bark Treatment - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.10 Basal Bark Treatment - General Forest | 50 | Acre | $ | $ | $ | $ | $ |
| 4.11 Add-on of Foiliar Spray to Hack and Squirt or Cut Stump | 50 | Acre | $ | $ | $ | $ | $ |
| 4.12 Add-on of Hack and Squirt to Basal Bark Treatment of Stems >6" | 50 | Acre | $ | $ | $ | $ | $ |
| 4.13 CUT STUMP- Midstory Control with Slash Removal from Residual Trees | 50 | Acre | $ | $ | $ | $ | $ |
| B) Herbicide Tasks Annual Total | $ | $ | $ | $ | $ |
5. PB
| Poplar Bluff (PB) RD - Schedule of Items (SOI) | Estimated | Unit | Price | Price | Price | Price | Price |
| Annual | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||
| Quantity | 2022 | 2023 | 2024 | 2025 | 2026 | ||
| Task/SubTask | |||||||
| A) Non-Herbicide Tasks | |||||||
| 1. STAND IMPROVEMENT | |||||||
| 1.1. Release - Manual (Pine) | 30 | Acre | $ | $ | $ | $ | $ |
| 1.2. Precommercial Thinning - PCT (crop tree release) | 150 | Acre | $ | $ | $ | $ | $ |
| 2. SITE PREPARATION BY FELLING | |||||||
| 2.1 Evenaged Regeneration | 300 | Acre | $ | $ | $ | $ | $ |
| 2.2 Storm Damage Salvage Regeneration | 300 | Acre | $ | $ | $ | $ | $ |
| 2.3 Unevenaged Regeneration | 200 | Acre | $ | $ | $ | $ | $ |
| 3. RESTORATION TREATMENTS | |||||||
| 3.1 Glade restoration | 200 | Acre | $ | $ | $ | $ | $ |
| 3.2 Midstory Control | 200 | Acre | $ | $ | $ | $ | $ |
| 5. Slash Disposal | |||||||
| 5.1 Slash Disposal (30 inches) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.2 Slash Disposal (18 inches) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.3 Slash Disposal ( Hand Piling) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.4 Slash Disposal (Dispersal) | 50 | Acre | $ | $ | $ | $ | $ |
| A) Non-Herbicide Tasks Annual Total | $ | $ | $ | $ | $ |
| B) Herbicide Tasks | |||||||
| 4. HERBICIDE APPLICATION | |||||||
| 4.1 Foliar Spray - Pine Release | 50 | Acre | $ | $ | $ | $ | $ |
| 4.2 Foliar Spray - General Forest Vegetaion | 50 | Acre | $ | $ | $ | $ | $ |
| 4.3 Hack and Squirt - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.4 Hack & Squirt- Site Prep | 50 | Acre | $ | $ | $ | $ | $ |
| 4.5 Hack and Squirt - Midstory Control | 50 | Acre | $ | $ | $ | $ | $ |
| 4.6 Cut Stump - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.7 Cut Stump - Site Prep | 50 | Acre | $ | $ | $ | $ | $ |
| 4.8 Cut Stump - Midstory Control | 50 | Acre | $ | $ | $ | $ | $ |
| 4.9. Basal Bark Treatment - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.10 Basal Bark Treatment - General Forest | 50 | Acre | $ | $ | $ | $ | $ |
| 4.11 Add-on of Foiliar Spray to Hack and Squirt or Cut Stump | 50 | Acre | $ | $ | $ | $ | $ |
| 4.12 Add-on of Hack and Squirt to Basal Bark Treatment of Stems >6" | 50 | Acre | $ | $ | $ | $ | $ |
| 4.13 CUT STUMP- Midstory Control with Slash Removal from Residual Trees | 50 | Acre | $ | $ | $ | $ | $ |
| B) Herbicide Tasks Annual Total | $ | $ | $ | $ | $ |
6. EP
| Eleven Point (EP) RD - Schedule of Items (SOI) | Estimated | Unit | Price | Price | Price | Price | Price |
| Annual | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||
| Quantity | 2022 | 2023 | 2024 | 2025 | 2026 | ||
| Task/SubTask | |||||||
| A) Non-Herbicide Tasks | |||||||
| 1. STAND IMPROVEMENT | |||||||
| 1.1. Release - Manual (Pine) | 30 | Acre | $ | $ | $ | $ | $ |
| 1.2. Precommercial Thinning - PCT (crop tree release) | 150 | Acre | $ | $ | $ | $ | $ |
| 2. SITE PREPARATION BY FELLING | |||||||
| 2.1 Evenaged Regeneration | 300 | Acre | $ | $ | $ | $ | $ |
| 2.2 Storm Damage Salvage Regeneration | 300 | Acre | $ | $ | $ | $ | $ |
| 2.3 Unevenaged Regeneration | 200 | Acre | $ | $ | $ | $ | $ |
| 3. RESTORATION TREATMENTS | |||||||
| 3.1 Glade restoration | 200 | Acre | $ | $ | $ | $ | $ |
| 3.2 Midstory Control | 200 | Acre | $ | $ | $ | $ | $ |
| 5. Slash Disposal | |||||||
| 5.1 Slash Disposal (30 inches) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.2 Slash Disposal (18 inches) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.3 Slash Disposal ( Hand Piling) | 50 | Acre | $ | $ | $ | $ | $ |
| 5.4 Slash Disposal (Dispersal) | 50 | Acre | $ | $ | $ | $ | $ |
| A) Non-Herbicide Tasks Annual Total | $ | $ | $ | $ | $ |
| B) Herbicide Tasks | |||||||
| 4. HERBICIDE APPLICATION | |||||||
| 4.1 Foliar Spray - Pine Release | 50 | Acre | $ | $ | $ | $ | $ |
| 4.2 Foliar Spray - General Forest Vegetaion | 50 | Acre | $ | $ | $ | $ | $ |
| 4.3 Hack and Squirt - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.4 Hack & Squirt- Site Prep | 50 | Acre | $ | $ | $ | $ | $ |
| 4.5 Hack and Squirt - Midstory Control | 50 | Acre | $ | $ | $ | $ | $ |
| 4.6 Cut Stump - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.7 Cut Stump - Site Prep | 50 | Acre | $ | $ | $ | $ | $ |
| 4.8 Cut Stump - Midstory Control | 50 | Acre | $ | $ | $ | $ | $ |
| 4.9. Basal Bark Treatment - Pre-commercial Thinning | 50 | Acre | $ | $ | $ | $ | $ |
| 4.10 Basal Bark Treatment - General Forest | 50 | Acre | $ | $ | $ | $ | $ |
| 4.11 Add-on of Foiliar Spray to Hack and Squirt or Cut Stump | 50 | Acre | $ | $ | $ | $ | $ |
| 4.12 Add-on of Hack and Squirt to Basal Bark Treatment of Stems >6" | 50 | Acre | $ | $ | $ | $ | $ |
| 4.13 CUT STUMP- Midstory Control with Slash Removal from Residual Trees | 50 | Acre | $ | $ | $ | $ | $ |
| B) Herbicide Tasks Annual Total | $ | $ | $ | $ | $ |
File details come from the government source that posted it. Updated .