Attachment 5 - Star Meadows Barn Foundation Drawings.pdf

PDF 8 MB Posted

Attached to
GAOA Star meadow Barn Foundation Flathead National Forest
Solicitation number
1240LU26Q0021
Issued by

About this file

This document is a Construction Plans set for the Star Meadows Barn Foundation Replacement project located at 5250 Star Meadows Road, Whitefish, Montana, on the Flathead National Forest under the Tally Lake Ranger District of the U.S. Department of Agriculture Forest Service Region One.

The construction plans consist of eight sheets detailing the foundation replacement work for an existing barn structure. The project involves demolishing the existing concrete foundation and constructing a new reinforced concrete foundation system. Key construction elements include an 8-inch wide perimeter wall foundation with joist sill ledges, end wall columns (12 x 12 inches), an intermediate pier support, and individual foundation footers for the existing chimney and beam support. The foundation design specifies #4 reinforcement bars at various spacing configurations with 3-inch clear cover, Simpson CCQM connectors for floor support beams, and 2 x 8 redwood sills with 5/8-inch anchors at 16-inch on-center spacing. Foundation footings must be placed on 6 inches of compacted crushed aggregate. The plans include a 4-foot-wide by 2-foot-6-inch-high access door with stainless steel gate hardware. Site work includes landscape restoration with topsoil and grass seed, replacement of drain tile and field, and surface disturbance limits. The documents were prepared by P. Siers (designer/draftsman), checked by Travis Taylor (Forest Engineer), and approved by William Mulholland (Bill Mulholland, District Ranger) and Anthony Botello (Forest Supervisor), with digital signatures dated between January and June 2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/7 /25

:1

2 P

SI

ER

S

E:

\S

IE

RS

_9

9_

_S

N_

DA

TA

\C

OM

PL

ET

E\

XP

U

PG

RA

DE

\X

P W

OR

KS

PA

CE

\2_

DE

SK

_D

RA

W

ER

\20

F

AC

IL

IT

IE

S W

OR

K\

ST

AR

M

EA

DO

W

S

BA

RN

\B

AR

N

DR

AW

IN

GS

\S

TA

RM

EA

DO

W

CA

BI

N_

SI

TE

PL

AN

5_

_2

5.D W

G;

R1

NORTHERN REGION

STAR MEADOWS BARN

FOUNDATION

REPLACEMENT

FLATHEAD NATIONAL

FOREST

TALLY LAKE RANGER

DISTRICT

SITE PLAN

12/15/2022

P.SIERS

P.SIERS

Travis Taylor

L-01

12'-6"

18'-3"

8'-4" 10'-5"10'-5"

1'-0"

12'-6"

18'-3"

8'-4" 10'-5"10'-5"

1'-0"

8'-6"

30'-3"

30'-3"

Top of Wall

Loft Floor

Loft Floor

Top of Wall

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/2 9/2

5 1 7:

P

SI

ER

S E:

\S

IE

RS

_9

9_

_S N_

DA

TA

\C

OM

PL

ET

E\

XP

U

PG

RA

DE

\X P

W

OR

KS

PA

CE

\2_

DE

SK

_D

RA

W

ER

\20

F

AC

IL

IT

IE

S

W

OR

K\

ST

AR

M

EA

DO

W S\

ST

AR

M

EA

DO

W

S

BA

RN

F

OU

ND

AT

IO

N.

DW

G;

R1

REGION ONE

STAR MEADOWS

BARN

FOUNDATION

REPLACEMENT

FLATHEAD NATIONAL

FOREST

TALLY LAKE RANGER DISTRICT

EXISTING STRUCTURE

ELEVATION VIEWS

01/21/2025

P.SIERS

P.SIERS

TRAVIS TAYLOR

A-01 3 8

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/2 9/2

5 1 7:

P

SI

ER

S E:

\S

IE

RS

_9

9_

_S N_

DA

TA

\C

OM

PL

ET

E\

XP

U

PG

RA

DE

\X P

W

OR

KS

PA

CE

\2_

DE

SK

_D

RA

W

ER

\20

F

AC

IL

IT

IE

S

W

OR

K\

ST

AR

M

EA

DO

W S\

ST

AR

M

EA

DO

W

S

BA

RN

F

OU

ND

AT

IO

N.

DW

G;

R 1

REGION ONE

STAR MEADOWS

BARN

FOUNDATION

REPLACEMENT

FLATHEAD NATIONAL

FOREST

TALLY LAKE RANGER DISTRICT

BARN PHOTOS

01/21/2025

P.SIERS

P.SIERS

T.TAYLOR

G-01 4 8

Existing Barn Ground Level Attic Photo w/ Chimney view

Existing Foundation End Wall w/ Door Existing Foundation

End Wall & Barn Siding view

30'-3"

Chimney

CONCRETE FOUNDATION (demo existing) Not to Scale

18'-3" 18'-3"

F lo or B oa rd

P la nk s

S in gl e

C en te r

S up po rt

B ea m 6" x

" (A ct ua l)

V ar io us x, x, x S hi m s

B lo ck in g

Ex is tin g

G ro un d

Floor Joists 4" x 10" (Actual)

SECTION B - B'

No Scale

B

- B

A - A'

30'-3"

1"x12" Lap Siding

1/2" Blocking Wall Bottom Plate 2"x4" (Nominal)

Floor Boards 3" x 10" (Actual)

Wall Stud 2"x4" (nominal)

Anchor Bolt

Anchor Bolts Single Center Support Beam 6" x 6" (Actual) Various 1x, 2x, & 4x Shims & Blocking

Existing Ground Floor Joists 4" x 10" (Actual)

Chimney

SECTION A - A'

No Scale

EXISTING

Joist Blockouts

VENT

BLOCKOUT

Existing Foundation Footer

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/2 9/2

5 1 7:

P

SI

ER

S E:

\S

IE

RS

_9

9_

_S N_

DA

TA

\C

OM

PL

ET

E\

XP

U

PG

RA

DE

\X P

W

OR

KS

PA

CE

\2_

DE

SK

_D

RA

W

ER

\20

F

AC

IL

IT

IE

S

W

OR

K\

ST

AR

M

EA

DO

W S\

ST

AR

M

EA

DO

W

S

BA

RN

F

OU

ND

AT

IO

N.

DW

G;

(R01)

REGION ONE

STAR MEADOWS

BARN

FOUNDATION

REPLACEMENT

FLATHEAD NATIONAL

FOREST

TALLY LAKE RANGER DISTRICT

EXISTING STRUCTURE

FOUNDATION

01/21/2025

P.SIERS

P.SIERS

T.TAYLOR

A-02 5 8

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/2 9/2

5 1 7:

P

SI

ER

S E:

\S

IE

RS

_9

9_

_S N_

DA

TA

\C

OM

PL

ET

E\

XP

U

PG

RA

DE

\X P

W

OR

KS

PA

CE

\2_

DE

SK

_D

RA

W

ER

\20

F

AC

IL

IT

IE

S

W

OR

K\

ST

AR

M

EA

DO

W S\

ST

AR

M

EA

DO

W

S

BA

RN

F

OU

ND

AT

IO

N.

DW

G;

R 1

REGION ONE

STAR MEADOWS

BARN

FOUNDATION

REPLACEMENT

FLATHEAD NATIONAL

FOREST

TALLY LAKE RANGER DISTRICT

EXISTING FOUNDATION

PHOTOS

01/21/2025

P.SIERS

P.SIERS

T.TAYLOR

G-02 6 8

Existing Foundation Light thru a Cracked Foundation at Corner & End Wall Footer split due to shear Side Wall w/ Joists

Existing Foundation Cracked Foundation at Corner (Exterior)

Existing Foundation Center Beam at End Wall w/ Blocking & Shims

Existing Foundation Center Beam w/ Blocking & Shims at Midway of Span

(3) #4x 3'-2" @ 15" spa.

NOTES:

1. #4 bar w/ 3" Clear cover unless otherwise noted.

2. c.c. = center-to-center

3. Use 2' min. lap splice for all bars.

4. Place foundation footing on 6" leveling course of crushed aggregate compacted to 98% of maximum dry density.

#4 Vertical "L" Bars Each Face @ 6" c.c.

(Double Curtain)

(2

S pa

2"

0"

(9 x

3-

Ea ch

F ac e

2' -6

4' -4

2' -8

13"

4' -6

13"

#4 Vertical Development "L" Bars Each Face @ 24" c.c.

(Double Curtain)

S pa

2"

0"

D ou bl e

C ur ta in

(8

C on tin uo us(1

S pa

3' -0

4' -4

4' -6

13"

3' -2

13"

3'-4"

8" 4'

-4

V ar ia bl e

8"

S pa

2"

0"

(5

C on tin uo us

BEAM & CHIMNEY FOUNDATION

None

Single Curtain #4 Vertical Bars @ 24" c.c.

Outside - Install Backfill

- Inside - Excavate

Crawlspace

8"

(4) #4 " L" Bars 6" c.c.

12" Square Column Pier

3"

(2

S pa

2"

0"

(9

Ea ch F ac e

4' -6

13" 13"

Alternate

A #4 x 2'-2" @ 24" c.c.

Grade Perimeter Flat for 20' & +/- 5% to daylight the

Backfill of the Foundation.

Backfill & Grade Perimeter

Flat @ 20' & +/- 5% to daylight.

3'-8"

B C

12"

D

END WALL COLUMN

None

SIDE WALL JOIST SILL

None

END WALL SECTION

None

4 Spa. @ 8.5" = 2'-10"

(5) No. 4 Rebar Continuous typ.

C on t.

Ea ch

E nd

W al l h as a D iff er en t

B ac kf ill

D ep th

2'-8"

#4 x 2'-10"

1' -6

Li nt el

8"

S pa

2"

Outside - Install Backfill

EACCESS DOOR

None

#4 x 2'-10" @ 24" c.c.

2'-8"

2 x 6 Door Stop Nailed to the frame (Inside).

2 x 8 Frame around the opening for an Access Door

4'-0" wide x 2'-6" high door w/ 316 Stainless Steel Gate Hardware Kit to Include:

1. Heavy Duty " T " Hinge 6"(L) x 3"(W) 2.Bolted Filler or Backing Plate.

3.Gate Latch 4.Pull and Mounting Hardware

1 1/4" Plywood Access Door

Inside - Excavate Crawlspace

(4) #4 @ 14" c.c.

Install a 4' Square x 8" deep Individual Foundation Footer for the Existing 16" sq. x 8" CMU Block Chimney and Intermediate Beam Support.

Foundation footing shall be placed on 6" min. crushed aggregate compacted to 98% of maximum dry density.

(3) Spa. @ 14" = 3'-6"

(4) #4 x 3'-6" @ 14" c.c.

(both ways)

(4) #4 @ 14" c.c.

Alternate ea. "L" Bar's direction

8"

13" 13"

3 Spa. @ 8.5"= 2'- 1 1/2"

(4) No. 4 Rebar Continuous typ.

3 Spa. @ 8.5"= 2'- 1 1/2"

(4) No. 4 Rebar Continuous typ.

3 Spa. @ 8.5"= 2'- 1 1/2"

(4) No. 4 Rebar Continuous typ.

Simpson CCQM

5 1/2" x 6" Glu-Lam Floor Support Beam

Simpson Strong-Drive

Simpson CCQM

5 1/2" x 6" Glu-Lam Floor Support Beam

Simpson Strong-Drive Screws

2 x 8 Redwood Sill w/ 5/8" Anchor @ 16" o.c.

2 x 8 Redwood Sill w/ 5/8" Anchor @ 16" o.c.

2 x 8 Redwood Sill w/ 5/8" Anchor @ 16" o.c.

2 x 8 Redwood Sill w/ 5/8" Anchor @ 16" o.c.

8-Inch Wall w/ Joist Sill Ledge Side Wall Foundation

Foundation Footer

8-Inch Wide Foundation End Walls

4'-0"

A

C

E

B

D

1' -0

4' - 0" Wide x 2' -6" SOUTHWEST End Wall

Square CMU Chimney Blocks 15 5/8" (actual)

32'-3"

20'-3" Approx.. Beam Lgth = 15'-0"

Pier 1'-0" square

Approx.. Beam Lgth = 13'-0"

Beam Support Foundation The 12 x 12-Inch Wall Columns & Intermediate Pier are shown at approximate locations. Placement of Columns & Piers shall be positioned by the Contractor aligned to support the Building's Chimney AS SHOWN in Section D detail.

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/8 /25

:4

5 P

SI

ER

S

E:

\S

IE

RS

_9

9_

_S

N_

DA

TA

\C

OM

PL

ET

E\

XP

U

PG

RA

DE

\X

P W

OR

KS

PA

CE

\2_

DE

SK

_D

RA

W

ER

\20

F

AC

IL

IT

IE

S W

OR

K\

ST

AR

M

EA

DO

W

S\

ST

AR

M

EA

DO

W S

BA

RN

F

OU

ND

AT

IO

N.

DW

G;

R 1

REGION ONE

STAR MEADOWS

BARN

FOUNDATION

REPLACEMENT

FLATHEAD NATIONAL

FOREST

TALLY LAKE RANGER DISTRICT

NEW FOUNDATION

01/21/2025

P.SIERS

P.SIERS

T.TAYLOR

S-01 7 8

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/2 9/2

5 1 7:

P

SI

ER

S E:

\S

IE

RS

_9

9_

_S N_

DA

TA

\C

OM

PL

ET

E\

XP

U

PG

RA

DE

\X P

W

OR

KS

PA

CE

\2_

DE

SK

_D

RA

W

ER

\20

F

AC

IL

IT

IE

S

W

OR

K\

ST

AR

M

EA

DO

W S\

ST

AR

M

EA

DO

W

S

BA

RN

F

OU

ND

AT

IO

N.

DW

G;

R 1

REGION ONE

STAR MEADOWS

BARN

FOUNDATION

REPLACEMENT

FLATHEAD NATIONAL

FOREST

TALLY LAKE RANGER DISTRICT

DRAIN FIELD PHOTOS

01/21/2025

P.SIERS

P.SIERS

T.TAYLOR

G-04 8 8

Drain Field & Barn Area Drain Field Area

Drain Tile to be Replaced & Buried Drain Field foreground Barn background

File details come from the government source that posted it. Updated .