Attachment 5 - SSHINE_SOW_TO_01_RVEP_12 Nov 24.pdf
PDF 215 KB Posted
- Attached to
- Space Systems and Hardware Integration for Novel Experiments (SSHINE) Federal contract opportunity
- Solicitation number
- FA9453-25-R-X002
About this file
This Statement of Work details Task Order 0001 for the Space Systems and Hardware Integration for Novel Experiments (SSHINE) contract, focused on Prototypes and Flight Experiments (RVEP) for the Air Force Research Laboratory Space Vehicles Directorate. The work supports research and development, systems engineering, mission development, assembly, integration and testing capabilities for large-scale space technology experiments, as well as management of the Kirtland Spacecraft Integration facility.
The contractor will provide mission and space system development services including systems engineering support, requirements development, modeling and simulation, cybersecurity compliance, and documentation. They will also perform flight experiment prototyping, assembly, integration and testing tasks including hardware/software design, facility management, safety compliance, and launch integration support. Flight experiment operations responsibilities include mission planning, procedure development, simulator testing, and on-orbit operations support. Key personnel requirements include facility management roles (Fuel Tank Custodian, Chemical Hygiene Officer) and security positions. Personnel must be eligible for Top Secret clearance. The SOW is dated November 12, 2024 and includes provisions for surge support and Associate Contractor Agreements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA945325RX002.pdf | ||
| Attachment 2 - SSHINE CDRLs 14 Nov 2024 (Signed).pdf | ||
| Attachment 11 - Senior_Key Person Profile.pdf | ||
| Attachment 6 - SSHINE_SOW_TO_02_RVEN_12 Nov 24.pdf | ||
| Attachment 1 - SSHINE DD 254 (CO Signed).pdf | ||
| Attachment 14 - Section L- Instructions to Offerors 27 Nov 24.pdf | ||
| Attachment 15 - Section M- Basis of Award 27 Nov 24.pdf | ||
| Attachment 3 - SSHINE_SOW_Supplemental Requirements_13 Aug 24.pdf | ||
| Attachment 4 - SSHINE_SOW_IDIQ_12 Nov 24.pdf | ||
| Attachment 7 - SSHINE_SOW_TO_03_RVEX_12 Nov 24.pdf | ||
| Attachment 8 - Data Rights Assertions Template.docx | DOCX document | |
| Attachment 12 - Security Program Questionnaire.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPACE SYSTEMS AND HARDWARE INTEGRATION FOR NOVEL
EXPERIMENTS (SSHINE)
TASK ORDER 0001
PROTOTYPES AND FLIGHT EXPERIMENTS (RVEP)
STATEMENT OF WORK (SOW)
12 November 2024
1.0 Mission and Background
The objective of the Prototypes and Flight Experiments Task Order is to provide the Air Force Research Laboratory (AFRL) Space Vehicles Directorate (RV), Integrated Experiments and Evaluation Division (RVE), Prototypes and Flight Experiments Branch with research and development, systems engineering, mission development, assembly, integration and testing (AI&T) capabilities, and program management expertise for large scale space technology experiments as defined in the basic contract SOW. Additionally, this task order supports upkeep, upgrade, maintenance, and facility management of the Kirtland Spacecraft Integration facility.
2.0 Scope
The Government anticipates numerous general efforts over the total contract period of performance on this task order. This effort involves the Mission and Space System Development, and Flight Experiment Prototyping, Assembly, Integration, and Testing functional areas as defined in the basic contract SOW, and is expected to require two additional key personnel.
3.0 Compliance and Reference Documents
Compliance and Reference Documents are listed in the basic contract SOW.
4.0 Requirements
The following requirements are applicable to the listed RVE functional areas in section 2. The contractor may be required to travel to other Government agencies and/or other contractor locations to perform design, integration, and test activities in support of AFRL/RVE integration and test programs.
4.1 Mission and Space System Development.
4.1.1 The contractor will support the direct technical and systems engineering to RVE Program
Managers, Deputy Program Managers, Chief Engineers, Systems Engineers, or other designated program leads.
4.1.2 The contractor will support systems engineering and analytics to AFRL mission and space system designs.
4.1.3 The contractor will support in the development of government flight experiment and space technology requirements, mission scope, design tradeoffs/alternatives, concepts of operation, mission constraints, conceptual designs, and mission analyses, including:
4.1.3.1 Refinement of programmatic objectives into actionable requirements.
4.1.3.2 Analyses and documentation for laboratory, range, ground, near-space, and/or
STATEMENT OF WORK: RVEP TO 0001
space flight experiments.
4.1.3.3 Iteration of requirements, flow-downs, concept of operations; the refining of objectives; and interface management.
4.1.4 The contractor will provide analyses and evaluations accomplished through relevant experimental testing, modeling and simulation, and engineering analysis.
4.1.5 The contractor shall prepare documentation for all systems engineering activities related to space technology programs and individual flight experiments, to include technical input into development of Government Reference Designs (GRD).
4.1.6 The contractor shall support Model Based Systems Engineering (MBSE) tasks when/where applicable/requested, including requirements definition, design, analysis, and verification/validation activities beginning in the conceptual design phase and continuing throughout program life cycle, including:
4.1.6.1 Development of MBSE models.
4.1.6.2 Evaluation of models delivered by outside performers.
4.1.6.3 Exercise and test of models in support of RVE objectives.
4.1.7 The contractor will support modeling and simulation tasks, including:
4.1.7.1 Development of modeling capabilities to simulate, emulate and evaluate technology options identified by RVE.
4.1.7.2 Testing and operation of modeling and simulation capabilities.
4.1.7.3 Analyses comparing model and simulation results to experimental findings.
4.1.7.4 Analyses identifying requirement shortfalls, missing functionality, and model improvements.
4.1.8 The contractor will provide Systems Engineering, including mechanical, thermal, electrical, structural, and other specialized engineering to support mission development for space technology, spacecraft, and high-altitude balloon experiment designs.
4.1.9 The contractor will provide comprehensive cybersecurity and information assurance tasks, including compliance with Department of Defense (DoD) risk management frameworks, and other security requirements.
4.1.10 The contractor will support in the development of space technology and flight experiment requirements, design, and interface control documentation.
4.1.11 The contractor will support with program management tasks, including attendance at technical meetings, reviews, off-sites, or technical conferences.
4.1.12 The contractor will provide procurement assistance with long lead hardware/software critical to future flight experiment program success.
4.1.12.1 The contractor will have the ability to procure available commercial and non-commercial space-rated/grade related hardware.
4.1.13 Reserved.
4.1.14 The contractor will support technology transfer planning and decommissioning tasks, to include planning in support of technology transition to external mission partners.
4.1.15 The contractor will support the design and fabrication of ground-based proofs-of-concept, experiments, and demonstrations.
4.1.15.1 The contractor will prepare documented data acquisition, processing, analysis, and modeling/simulation tools to be used in the experiment, research, or analysis effort for evaluations.
4.1.15.2 The contractor will document experimental processes and results to allow third parties to independently reproduce the experiment, research, or analysis effort.
4.1.16 Reserved.
4.1.17 The contractor will travel to other Government agencies and/or other contractor locations, as required, in support of design and test requirements reviews, briefings to industry, conferences and other meetings related to RVE integration and test programs.
4.1.18 The contractor will prepare monthly status reports on activity under the scope of section
4.1 and document lessons learned.
4.1.18.1 The monthly status report may be combined with the other monthly status reports referenced in this task order and the basic contract SOW.
4.1.18.2 The contractor will present monthly status reports and lessons learned to internal and/or external audiences as directed by the government.
4.2 Flight Experiment Prototyping, Assembly, Integration, and Testing:
4.2.1 The contractor will provide direct analytical, technician, and systems engineering tasks of the RVE Assembly, Integration, and Testing Infrastructure Lead(s).
4.2.2 The contractor will draft, prepare, revise, and review design documentation including, but not limited to:
4.2.2.1 User’s guides.
4.2.2.2 Interface Control Documents (ICDs), Specifications.
4.2.2.3 Test Processes/Procedures.
4.2.2.4 Safety Plans.
4.2.2.5 Risk Management Plans.
4.2.2.6 Attendance and participation in programmatic, technical and safety reviews.
4.2.2.7 Reliability, operability, interoperability, and performance assessments.
4.2.3 The contractor will support full life-cycle technology implementation tasks, including:
4.2.3.1 Space technology, spacecraft, and high-altitude balloon flight hardware design and fabrication.
4.2.3.1.1 Hardware development and integration.
4.2.3.1.2 Hardware testing and experimentation.
4.2.3.1.3 Technology transition support.
4.2.3.2 Space technology, spacecraft, and high-altitude balloon flight software/firmware design and development.
4.2.3.2.1 Modifying existing software/firmware.
4.2.3.2.2 Writing and documenting new code.
4.2.3.2.3 Integrating and testing new or modified code.
4.2.3.2.4 Maintaining software and related databases.
4.2.3.2.5 Software configuration management.
4.2.3.3 Laboratory research, test and assessment design, technology validation testing and experimentation.
4.2.3.3.1 Ground/laboratory test planning and procedures development, test design and fabrication, test preparation and coordination.
4.2.3.3.2 Arrangement of equipment and logistics for the test effort.
4.2.3.3.3 Systems-level tests to evaluate performance of spacecraft, balloon, and ground systems/subsystems.
4.2.3.3.4 Data reduction, analyses, and review the results of functional and environmental testing of spacecraft, high-altitude balloon, and ground systems/subsystems.
4.2.3.3.5 Documented data acquisition, processing, analysis, and modeling/simulation tools to be used in a technology validation effort.
4.2.3.3.6 Documenting experimental processes and results to allow third parties to independently reproduce the evaluation effort.
4.2.3.4 Re-engineering and re-design of software and hardware after testing.
4.2.4 The contractor will support assembly and integration tasks, including:
4.2.4.1 Space technology assembly and integration support.
4.2.4.2 Government integration facility management, including personnel training, facility security, and safety compliance.
4.2.4.3 Spacecraft bus, payload, and experiment assembly and integration within government facilities.
4.2.4.4 High-altitude balloon, payload, and experiment assembly and integration within government facilities.
4.2.4.5 Assistance with hardware/software procurement and other direct costs during assembly and integration.
4.2.4.6 Maintenance and upgrade support for government integration facility capabilities.
4.2.4.7 The contractor will prepare documentation and laboratory safety instruction (e.g.
vehicle operations, crane operations, hazardous materials, waste management, explosives, laser radiation, welding, cutting, brazing, chemicals, and electrostatic discharge) in accordance with the Programmatic Environmental Safety and Health Evaluation Plan.
4.2.4.8 The contractor will support the identification and reporting of recommendations to the Government for addressing hazardous situations found in workspaces, manufacturing areas, test facilities, integration areas, storage facilities, pre-launch areas, launch facilities, and post-launch processing.
4.2.4.9 Research, development, and planning for future space system assembly, integration, and testing needs, objective, and programs. Including:
4.2.4.9.1 New assembly, integration, and testing capabilities.
4.2.4.9.2 Planning tools.
4.2.4.9.3 Test operation, plans, and concepts.
4.2.4.9.4 Data reduction, analysis, and reporting tools.
4.2.5 Research, development, and planning for future space system assembly, integration, and testing needs, objective, and programs. Including:
4.2.5.1 New assembly, integration, and testing capabilities.
4.2.5.2 Planning tools.
4.2.5.3 Test operation, plans, and concepts.
4.2.5.4 Data reduction, analysis, and reporting tools.
4.2.6 The contractor will provide flight experiment launch integration tasks, including:
4.2.6.1 Support of integration studies, interface control documents, and briefings.
4.2.6.2 Packing, protecting, and shipping flight experiment and support equipment to the launch site.
4.2.6.3 Support of hardware and software integration efforts in preparation for flight experiment launch, including mechanical installation, functional testing, blanketing, fueling, inspection, fairing closeout, range safety procedures, and day of launch processes.
4.2.6.4 Support of post launch anomaly resolution, telemetry archiving and analysis, as and documentation.
4.2.7 The contractor will support the Government in shipping and receiving of flight experiment and assembly, integration, and testing hardware/software.
4.2.8 The contractor will have the ability to support a surge capability to meet requirements of section 4.2 within unexpected or tightened program constraints.
4.2.8.1 In the event surge requirements drive a change to the contract, the contractor will be notified through a Request for Proposal (RFP), contract/task order modification, or contracts letter, as appropriate.
4.2.9 The contractor will travel to other Government agencies and/or other contractor locations, as required, in support of design and test requirements reviews, briefings to industry, conferences and other meetings related to RVE integration and test programs.
4.2.10 The contractor will prepare monthly status reports on activity under the scope of section
4.2 and document lessons learned.
4.2.10.1 The monthly status report may be combined with the other monthly status reports referenced in this task order and the basic contract SOW.
4.2.10.2 The contractor will present monthly status reports and lessons learned to internal and/or external audiences as directed by the government.
4.3 Flight Experiment Operations.
4.3.1 The contractor will provide direct analytical, systems engineering, and technical tasks of the RVE Operations Cadre lead, or mission-specific operations lead as delegated.
4.3.2 The contractor will support flight experiment mission and operations planning including:
4.3.2.1 Procedure development for all phases of the mission.
4.3.2.2 CONOPS development.
4.3.2.3 Launch and Early Operations (LEOps) plan
4.3.2.4 Operational testing via simulator (to include setup, configuration, and use of various virtual simulations and flatsats).
4.3.2.5 Ground system testing to include operations acceptance testing, factory compatibility tests, and launch-base compatibility tests.
4.3.2.6 Mission operations center planning to include facility planning, layout, and preparation.
4.3.2.7 Training material generation to support crew readiness events.
4.3.2.8 Coordination with systems team on various operational documents such as launch and early orbit
4.3.2.9 Participation in events such as day in the life tests, exercises, rehearsals, and mission dress rehearsals as an operator, systems expert, or mission planner (see section 4.3.3.1.3).
4.3.2.10 Completion of required AFRL training to certify as a member of the flight operations team. Assume ~8 hours of classroom training, 8 hours of practical training, and ~40 hours of on-console event training spread across ~6 months.
4.3.2.11 Participation in (and leading as appropriate) various operations IPT’s on a weekly basis.
4.3.2.12 Participation in a weekly Ops Cadre internal meeting.
4.3.2.13 Software tool development and test in support of operational needs.
4.3.2.14 Development of automatic functions or scripts to support operations as required.
4.3.2.15 Completion and coordination of on-boarding actions associated with various antenna networks including both SCN, commercial, and AFRL networks.
4.3.2.16 Assisting the operations lead in crew logistics management such as badging, entry-access lists, 2875 account creation, and training event planning.
4.3.3 The contractor will directly support flight operations, including:
4.3.3.1 Spacecraft on-orbit operations and experimentation including on-call support as required.
4.3.3.1.1 Reference section 4.3.2.10 for completion of required training for certification purposes.
4.3.3.1.2 The minimum number of shifts per month for currency will be tracked and adhered to.
4.3.3.1.3 Operations may include (but not limited to): Antenna resource scheduling, vehicle planning, systems support, command block building, command block verification, and release of commands to the vehicle at the direction of a government flight director.
4.3.3.2 Operations acceptance testing to include regression testing of new operational components and processes.
4.3.3.3 Development of forward-looking anomaly prediction and detection algorithms and software.
4.3.3.4 Development of historical data aggregation and trending analysis algorithms and software.
4.3.3.5 Development of vehicle fault detection reporting systems.
4.3.3.6 Support configuration management processes of procedures, scripts, vehicle tables, vehicle parameters, vehicle fault detection and response trees, and ground software items throughout the life of the mission.
4.3.3.7 Anomaly resolution support and reporting.
4.3.3.8 In the event the government requests a root cause analysis for a specific issue occurring during operations, the contractor shall produce within 30 days of notice the following:
4.3.3.8.1 A root cause analysis by an independent party to collect and document information leading up to failure including identifying contributing factors, identifying a mitigation plan, and providing other recommendations as needed.
4.3.4 The contractor will support government technology transfer efforts, including:
4.3.4.1 Training of external mission partners on flight operations.
4.3.4.2 Technical reach back support for mission partners after technology transition.
4.3.5 The contractor will support documentation tasks for all systems engineering activities related to transition of flight assets to operational users.
4.3.6 The contractor will have the ability to support a surge capability to meet requirements of section 4.3 within unexpected or tightened program constraints.
4.3.6.1 In the event surge requirements drive a change to the contract, the contractor will be notified through a Request for Proposal (RFP), contract/task order modification, or contracts letter, as appropriate.
4.3.7 The contractor will travel to other Government agencies and/or other contractor locations, as required, in support of design and test requirements reviews, briefings to industry, conferences and other meetings related to RVE integration and test programs.
4.3.8 The contractor will travel to conduct work covered under section 4.3 at other laboratories, field locations, test ranges, other Government locations, and other industry locations.
4.3.9 The contractor will prepare monthly status reports on activity under the scope of section
4.3 and document lessons learned.
4.3.9.1 The monthly status report may be combined with the other monthly status reports referenced in this task order and the basic contract statement of work.
4.3.9.2 The contractor will present monthly status reports and lessons learned to internal and/or external audiences as directed by the government.
5.0 Contract Management
The contractor will perform contract requirements in accordance with the basic contract SOW.
5.1 Key Personnel.
5.1.1 The functions below are considered essential to the work being performed on contract in addition to those required by the basic contract SOW. These functions may be performed by one or more qualified persons.
5.1.1.1 Facility Management.
5.1.1.1.1 Fuel Tank Custodian in accordance with 377 Mission Support Group training requirements.
5.1.1.1.2 Chemical Hygiene Officer in accordance with AFI 90-821.
5.1.1.1.3 Hazard Communication Program Manager in accordance with 29 CFR 1910.1200.
5.1.1.1.4 Unit Safety Representative in accordance with AFI 91-202.
5.1.1.2 Security Assistant.
5.1.1.2.1 Alarm Custodian in accordance with 377 Security Forces Group requirements.
5.1.1.2.2 General Services Administration Security Container Custodian in accordance with 18 CFR 3a.61.
6.0 Security Requirements
6.1 Clearance Requirements: The contractor will establish and implement information and physical security programs governing their efforts in accordance with the Basic Contract DD254 Contract Security Classification Specification. At a minimum, contractor personnel shall be eligible to obtain a Top-Secret Clearance.
7.0 Associate Contractor Agreements
7.1 The Contractor will enter into Associate Contractor Agreements (ACA) for any portion of task order performance requiring joint participation in the accomplishment of the Government's requirement. ACAs shall be executed in accordance with requirements in the basic contract SOW.
8.0 Deliverables
The contractor will deliver all deliverables in accordance with the Contract Data Requirements List (CDRLs) defined in the Basic Contract.
9.0 Base Support
The Government will provide base laboratory support in accordance with basic contract SOW.
10. Government Property/Contractor Acquired Property
10.1 Contractor Procured/Acquired Property: The contractor may be required to procure/acquire property or equipment during the performance of a task order. The following rules apply to all such tasks:
10.1.1 Purchases must be authorized by a Government Technical Lead.
10.1.2 Purchases exceeding the Standard Simplified Acquisition Threshold must be authorized by the contracting officer.
10.1.3 Any equipment or property procured and all Government-provided records, files, documents, and work papers or those generated in support of this work effort are Government property.
10.1.4 All property and materials associated with these efforts shall be coordinated with a Government technical lead and be managed in accordance with the contractor’s property management policies, procedures, practices, and systems.
10.1.5 The contractor will maintain a current inventory of Government Property (including Contractor Acquired Property).
10.1.6 If the contractor wishes to reutilize any government property not meeting the abandonment or destruction criteria of FAR 45.603, the proposed reutilization shall be submitted to a government technical lead for concurrence.
11.0 Organizational Conflict of Interest (OCI)
If during the contract period of performance, the contractor is or becomes aware of any other actual or potential OCI that could impact the SSHINE contract, the contractor shall provide the Contracting Officer with the complete information as well as address how it will handle the situation in an OCI mitigation plan.
File details come from the government source that posted it. Updated .