Attachment 5 - Sample Work Order Form.xlsx

XLSX spreadsheet 686 KB Posted

Attached to
Customs and Border Protection (CBP) Carrizo Cane Eradication - Texas
Solicitation number
70B01C26R00000114
Issued by

About this file

This file is a sample work order form template in Excel format designed for the CBP Carrizo Cane Eradication project in Texas. The template provides a standardized format for contractors to document and track work activities related to invasive vegetation management services along approximately 1,951 miles of the Texas southern international boundary. The form serves as an operational tool for organizing integrated vegetation management treatments, which may include manual, mechanical, and/or chemical treatment methods targeting invasive species such as carrizo cane. The work order template facilitates coordination between CBP and contractors by establishing a consistent documentation structure for individual work assignments, enabling proper tracking of treatment activities across the single base year plus three option year contract period.

As a template document, this file does not specify detailed pricing terms, response deadlines, or award information; those requirements are contained in the primary solicitation documentation. Contractors responding to solicitation 70B01C26R00000114 should use this template format when organizing their work activities and proposals, with questions due by September 1, 2026, at 12:00 PM EST and proposals due by September 11, 2026, at 12:00 PM EST. Submissions should be directed to muhanad.d.sasa@cbp.dhs.gov and donna.r.mcmullen@cbp.dhs.gov.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Est. Service Delivery Summary

ILSS Number:0Date(s):12/31/99REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
$ - 0
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$0.00
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&G PSC-CTIMR-CLIN 1,2,3,4 and 5 Cerrudo Tucson &"Times New Roman,Bold"&22EST. Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 1

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&10PSC-CTIMR-CLIN 1,2,3,4 and 5 Cerrudo Tucson &"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 2

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 3

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 4

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 5

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 6

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 7

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 8

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 9

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 10

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 11

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 12

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 13

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 14

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 15

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 16

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 17

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 18

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 19

ILSS Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
SWP Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract #: &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Work Estimate Sheet

ILSS Number:0Date(s):12/31/99REV:0
WORK DESCRIPTION
Contract Charge Code
Asset Description:Work Category:

Sub Type:

Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivision:Work ElementGPS:BEGN:
W:0ENDN:
W:0
"VENDOR" Lead Contact:Name:Ph:Email:
Gov't Lead Contact:Name:Ph:Email:
Gov't PM Contact:Name:Ph:Email:
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Labor Sub Total$ - 0
Travel Labor
$ - 0
$ - 0
Travel Labor Sub Total$ - 0
Equipment
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Equipment Sub Total$ - 0
Material
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Material Sub Total$ - 0
Mobilization
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Mobilization Sub Total$ - 0
Other Costs
$ - 0
$ - 0
Other Costs Sub Total$ - 0
Sub Total ALL Costs:$ - 0
"VENDOR" Coefficient:0%$ - 0
Grand Total:$ - 0
"VENDOR" Representative:Date:
Name, SignatureMM/DD/YYYY
Gov't Representative:Date:
Name, SignatureMM/DD/YYYY

&G &"-,Bold"&20&A 7/15/2020 Version

&"Times New Roman,Regular"&10Del Rio Sector &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10KOMAN Construction

Service Delivery Summary - 21

Work Activity (WA) Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&18&KFF0000&G&"-,Regular"&11&K01+000 &10PSC-CTIMR-SO0009-CLIN 1,2,3,4 and 5 Cerrudo Tucson, CLIN 4 Yuma &"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 22

Work Activity (WA) Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 23

Work Activity (WA) Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 24

Work Activity (WA) Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 25

Work Activity (WA) Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 26

Work Activity (WA) Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 27

Work Activity (WA) Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 28

Work Activity (WA) Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 29

Work Activity (WA) Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 30

Work Activity (WA) Number:0Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):0
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:0
Work Classification:RoutineSector:0
Work Subdivisions:Work ElementGPS:BEGN:
W:0ENDN:
W:0
M&R Lead Contact:Name:0Ph:0Email:0
Cerrudo Lead Contact:Name:0Ph:0Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Work Activity Report

ILSS Number:Date(s):REV:
WORK DESCRIPTION
Contract Charge Code
Asset Description:Work Category:

Sub Type:

Asset Objective(s):
Work Category:CLIN 5 - Carrizo Cane EradicationLocation:
Work Classification:RoutineSector:
Work Subdivision:Work ElementGPS:BEGN:
W:ENDN:

W:

"VENDOR" Lead Contact:Name:Ph:Email:
Gov't Lead Contact:Name:Ph:Email:
Gov't PM Contact:Name:Ph:Email:
WORK PERFORMANCE
Inspection:Frequency:
Scope of Work:

Work Standards/ QC Metrics:

Work Duration:Days:WAR STATUS:Final
ACCESS
Access Issues (including any expiration dates):Access Stakeholder(s):
Stakeholder Type:Federal
ENVIRONMENTAL
Applicable
Environmental Regulations and Sources (_):Applicable Environmental BMPs:BMP’s reviewed and implemented?Yes
Survey by Biologist if required?No
COST
Approved Labor Costs:$ - 0Other Notes / Photos
ApprovedTravel Costs:$ - 0Nearest CBP / VENDOR facilities: xxx

Avg. travel time to TI asset: #.# HRS Work Classification: [routine/urgent]

POC:

Approved Equipment Costs$ - 0
Approved Material Costs:$ - 0
Approved Mobilization Costs:$ - 0
Approved Other Costs:$ - 0
Approved Subtotal Costs:$ - 0
Approved "Vendor" Coefficient:$ - 0
Approved Total Cost:$ - 0
"VENDOR" Representative:Date:
Name, SignatureMM/DD/YYYY
Gov't Representative:Date:
Name, SignatureMM/DD/YYYY

&G &"Times New Roman,Bold"&20Work Activity Report 7/15/2020 Version

&"Times New Roman,Regular"&10Del Rio Sector &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10KOMAN Construction

Pics

Before:

After:

&G &"-,Bold"&20PHOTOGRAPHS 7/15/2020 Version

Del Rio Sector Page &P of &N KOMAN Construction

CLINs Labor

xxClassificationItemUnitRateDescriptionBaseOPT 1OPT 2OPT3OPT4
CLIN 1 - Fences and GatesRoutineCLIN 1 - Routine Repair & Maintenance DEL RIO Sector 10 Hr DayDay$ 3,816.23Daily work crew to perform routine maintenance and repairs per SOW
(Routine work Performed during daylight hours, based on 8 hour workday Mon-Fri)$ 2,765.86$ 2,835.01$ 3,632.35$ 3,723.16$ 3,816.23
CLIN 1 - Fences and GatesUrgentCLIN 1 - Urgent Repair & Maintenance DEL RIO SectorHour$ 477.03Hourly work crew to perform urgent maintenance and repairs per SOW
(Urgent work performed during daylight hours, based on 8 hour workday Mon-Fri)$ 432.17$ 442.97$ 454.05$ 465.39$ 477.03
CLIN 1 - Fences and GatesUrgentCLIN 1 - Urgent After-Hour Repair & Maintenance DEL RIOHour$ 572.43Hourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays$ 518.60$ 531.56$ 544.85$ 558.47$ 572.43
CLIN 1 - Fences and GatesUrgentCLIN 1 - Urgent Repair & Maintenance - TravelHourHourly work crew to perform urgent maintenance and repairs per SOW
(Urgent work performed during daylight hours, based on 8 hour workday Mon-Fri)$ - 0$ - 0$ - 0
CLIN 1 - Fences and GatesUrgentCLIN 1 - Urgent After-Hour Repair & Maintenance - TravelHourHourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays$ - 0$ - 0$ - 0
CLIN 1 - Fences and GatesRoutineCLIN 1 -Routine After-Hour Repair & Maintenance - Travel DEL RIOHour$ 572.43Hourly work crew to perform routine maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays. PDN009$ 518.60$ 531.56$ 544.85$ 555.47$ 572.43
CLIN 1 - Fences and GatesRoutineCLIN 1 -Routine After-Hour Repair & MaintenanceHourHourly work crew to perform routine maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays. PDN009$ - 0$ - 0$ - 0
CLIN 2 - Roads and BridgesRoutineCLIN 2 - Routine Repair & Maintenance DEL RIO 8 Hr DayDay$ 2,212.59Daily work crew to perform routine maintenance and repairs per SOW
(Routine work Performed during daylight hours, based on 8 hour workday Mon-Fri)$ 2,004.50$ 2,054.61$ 2,105.98$ 2,158.63$2,212.59
CLIN 2 - Roads and BridgesUrgentCLIN 2 - Urgent Repair & Maintenance DEL RIOHour$ 314.59Hourly work crew to perform urgent maintenance and repairs per SOW
(Urgent work performed during daylight hours, based on 8 hour workday Mon-Fri)$ 288.15$ 295.35$ 302.74$ 310.30$ 314.59
CLIN 2 - Roads and BridgesUrgentCLIN 2 - Urgent After-Hour Repair & Maintenance DEL RIOHour$ 369.30Hourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays$ 338.26$ 346.72$ 355.38$ 364.27$ 369.30
CLIN 2 - Roads and BridgesRoutineCLIN 2 - Routine Repair & Maintenance 10 HR DayDay$ 2,735.59Hourly work crew to perform urgent maintenance and repairs per SOW
(Urgent work performed during daylight hours, based on 8 hour workday Mon-Fri)$ 2,505.63$ 2,568.27$ 2,632.47$ 2,698.29$ 2,735.59
CLIN 2 - Roads and BridgesUrgentCLIN 2 - Urgent After-Hour Repair & Maintenance - TravelHourHourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays$ - 0$ - 0$ - 0
CLIN 2 - Roads and BridgesRoutineCLIN 2 - Routine After-Hour Repair & Maintenance - Travel DEL RIOHour$ 369.30Hourly work crew to perform routine maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays. PDN009$ 349.12$ 357.85$ 366.79$ 375.96$ 369.30
CLIN 2 - Roads and BridgesRoutineCLIN 2 - Routine After-Hour Repair & MaintenanceHourHourly work crew to perform routine maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays. PDN009$ - 0$ - 0$ - 0
CLIN 3 - Drainage & Grate SystemsRoutineCLIN 3 - Routine Repair & Maintenance 8 Hr dayDay$ 1,856.82Daily work crew to perform routine maintenance and repairs per SOW
(Routine work Performed during daylight hours, based on 8 hour workday Mon-Fri)$ 1,682.19$ 1,724.24$ 1,767.35$ 1,811.53$ 1,856.82
CLIN 3 - Drainage & Grate SystemsUrgentCLIN 3 - Urgent Repair & MaintenanceHour$ 235.20Hourly work crew to perform urgent maintenance and repairs per SOW
(Urgent work performed during daylight hours, based on 8 hour workday Mon-Fri)$ 241.81$ 247.86$ 254.05$ 260.41$ 235.20
CLIN 3 - Drainage & Grate SystemsUrgentCLIN 3 - Urgent After-Hour Repair & MaintenanceHour$ 276.11Hourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays$ 283.87$ 290.97$ 298.24$ 305.70$ 276.11
CLIN 3 - Drainage & Grate SystemsRoutineCLIN 3 - Routine Repair & Maintenance 10 HR DayDay$ 2,045.24Hourly work crew to perform urgent maintenance and repairs per SOW
(Urgent work performed during daylight hours, based on 8 hour workday Mon-Fri)$ 2,102.74$ 2,155.31$ 2,209.19$ 2,264.42$ 2,045.24
CLIN 3 - Drainage & Grate SystemsUrgentCLIN 3 - Urgent After-Hour Repair & Maintenance - TravelHourHourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays$ - 0$ - 0$ - 0
CLIN 3 - Drainage & Grate SystemsRoutineCLIN 3 - Routine After-Hour Repair & Maintenance - Travel DEL RIOHour$ 276.11Hourly work crew to perform routine maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays. PDN009$ 291.77$ 299.06$ 306.54$ 314.20$ 276.11
CLIN 3 - Drainage & Grate SystemsRoutineCLIN 3 - Routine After-Hour Repair & MaintenanceHourHourly work crew to perform routine maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays. PDN009$ - 0$ - 0$ - 0
CLIN 4 - Lighting - Electrical-TucsonRoutineCLIN 4 - Routine Repair & Maintenance - 10 HR DayDay$ 1,908.12Daily work crew to perform routine maintenance and repairs per SOW
(Routine work Performed during daylight hours, based on 8 hour workday Mon-Fri)$ 1,382.93$ 1,417.50$ 1,816.17$ 1,861.57$ 1,908.12
CLIN 4 - Lighting - Electrical-TucsonUrgentCLIN 4 - Urgent Repair & Maintenance -Hour$ 238.52Hourly work crew to perform urgent maintenance and repairs per SOW
(Urgent work performed during daylight hours, based on 8 hour workday Mon-Fri)$ 216.08$ 221.48$ 227.02$ 232.69$ 238.52
CLIN 4 - Lighting - Electrical-TucsonUrgentCLIN 4 - Urgent After-Hour Repair & Maintenance -Hour$ 286.22Hourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays$ 259.30$ 265.78$ 272.43$ 279.24$ 286.22
CLIN 4 - Lighting - Electrical-TucsonUrgentCLIN 4 - Urgent Repair & Maintenance - Travel -HourHourly work crew to perform urgent maintenance and repairs per SOW
(Urgent work performed during daylight hours, based on 8 hour workday Mon-Fri)$ - 0$ - 0$ - 0
CLIN 4 - Lighting - Electrical-TucsonUrgentCLIN 4 - Urgent After-Hour Repair & Maintenance - Travel -HourHourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays$ - 0$ - 0$ - 0
CLIN 4 - Lighting - Electrical-TucsonRoutineCLIN 4 - Routine After-Hour Repair & Maintenance - Travel - DEL RIOHour$ 286.22Hourly work crew to perform routine maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays. PDN009$ 259.30$ 265.78$ 272.43$ 279.24$ 286.22
CLIN 4 - Lighting - Electrical-TucsonRoutineCLIN 4 - Routine After-Hour Repair & Maintenance -HourHourly work crew to perform routine maintenance and repairs outside of the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays. PDN009$ - 0$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .