Attachment 5 Questions and Answers W90VN625QA004.pdf

PDF 452 KB Posted

Attached to
Amendment to SOL: LCS Funded- WRM Vehicle Maintenance OSAN AB- Korean Vendor Only
Solicitation number
W90VN6-25-Q-A004-P00001
Issued by

About this file

This is a Questions and Answers document related to a solicitation for WRM Vehicle Maintenance services at Osan Air Base, intended for Korean vendors only. The document contains 23 questions and answers clarifying various aspects of the solicitation requirements and terms.

Key details include: The award will not be made on a Lowest Price Technically Acceptable (LPTA) basis but rather on best value using price and other factors; the contract covers maintenance of 519 assigned vehicles with 491 authorized; water facilities at buildings 1326, 1327, and "Tent city" admin building are non-potable; available equipment includes 2 permanently installed vehicle lifts and 1 tire machine; the Equipment Accountability Element role will remain with the US Government; contractors can team with subcontractors but must provide valid ROK business registration for motor vehicle repair; and the government declined requests to extend the proposal due date or include oral presentations. Technical clarifications include replacing "Supply Technician" references with "Materiel Control Specialist" throughout the PWS and updating ILS-S references to Property Accountability APSR.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. PWS Para Question Answer

1 N/A Will this solicitation award be made to the responsible offeror submitting the Lowest Priced Technically Acceptable (LPTA)?

No, the basis for award for this requirement is not LPTA. As stated in addendum to FAR 52.212-2, the basis for the award is Price and Other Factors to procure the best value to the Government in accordance with FAR 13.5. The Government has the discretion to accept other than the lowest priced offeror that provides the best value.

2 N/A What specific criteria will the government use to determine if pricing is "significantly overstated or understated"

The Government intents to use diverse price analysis techniques identified in FAR Subpart 15.404-1 (b) including comparison of proposed prices received in response to the solicitation, comparison of the proposed prices to historial prices paid, comparison of proposed prices with independent Govenrment cost estimates, and others as needed.

3 N/A The file name 'Attachment_2__Incidentals_to_Place_of_Performance' is not opened.

Please advise.

See the PDF version of the attchment 2.

4 N/A Could we review the current list of equipment in possession? That list is included in the PWS under section 3.8.

5 N/A Is there any plan for changes in the equipment inventory?

The equipment inventory can change in the event items are determined to be unserviceable and the decision is to process for disposition, and if new equipment is added for upgrades. In the event this is updates, the USG will formally notify the contractor in writing with the changes.

6 1.5.4 If the base is closed due to an executive order, will the payment be calculated on a pro-rated basis and deducted accordingly?

In such a case, the Contracting Officer will follow the instruction of FAR 52.242-17 Government Delay of Work.

7 1.2.2, 6.5, 7.3

Attachment 1 (PWS), Para 1.2.2, 6.5, & 7.3 – Can the USG clarify which number of vehicles is correct and the maximum number of vehicles the contractor will be required to perform?

* Para 1.2.2 shows 490 authorized, 517 assigned, and 0 excess vehicles (total of 517).

*Para 6.5, referenced in Para 1.2.2, appears to be wrong and should likely be Para 7.3.

*Para 7.3 shows 519 vehicles in the fleet instead of 517 in Para 1.2.2.

Correct numbers are:

Authorized - 491 Assigned - 519 Excess - 0

Please update these sections for the final numbers above.

8 1.3 Attachment 1 (PWS), Para 1.3 – Can the USG provide the current MC, NMCM, and NMCS rates for the vehicle fleet?

Currently, that data is CUI. Once Contractors are vetted, this information can be shared.

9 1.5.7.3 Should the “Supply Technician” be changed to Materiel Control Specialist, or does the contract require Supply Technician(s)?

Replace "Supply Technician with Materiel Control Specialist" throughout PWS.

10 1.5.11 Can the USG clarify if the contractor shall provide a full-time CM or a part-time CM located within Korea that can meet within two hours?

Please refer to 1.5.16.1. The availability requirement of 1.5.16.1 can be met by a phone call.

11 3.1 Can the USG clarify whether the water is potable or non-potable in each building where the contractor works?

5 gallon replacable water coolers are located at bldgs 1326, 1327, & "Tent city" admin building. Running water at those facilities is non-potable.

12 3.4.2 Can the USG clarify if the contractor will act as Equipment Custodian(s), or will the role remain with the USG as part of the Equipment Accountability Element (EAE) under Supply?

The role will remain with the USG as part of the Equipment Accountability Elemend (EAE) under Base Supply.

13 3.5 Can the USG clarify if the contractor should purchase toner for USG printers? If so, how many and what are the types of printers?

3.5 states yes, and there is 1 working printer.

The type is: Laserjet Enterprise M506

S/N: JPBDS09733

14 5.19.7 Can the USG clarify ILS-S reconciliation requirements since DAFI 24-302 (dated 21 February 2020) does not include ILS-S?

Remove ILS-S and replace with Property Accountability APSR. Same AFI and paragraph 24-302 8.17.3

15 7.4

Can the USG provide context on why the number of mechanics at the Kunsan VM contract (5ea) and the Osan VM contract (15ea) vary so much?

We want to ensure accurate expectations with similar contract requirements and significantly different mechanic estimates.

Kunsan is actively working to update their requirements per the conversation with the Kunsan Vehicle Maintenance WRM COR.

16 Site Visit

Will the contractor be required to clean and organize the shops after the contract starts, or will the government ensure the shops are cleaned and organized before the contract starts?

During the site visit, it was noted that many office areas were dirty, parts scattered, and hazardous material was improperly stored.

Previous contractor personal items will be removed. Scattered tools, parts and unorganized hazardous materiels must be taken care of by the contractor during the phase-in process. It is the responsibility of the contrator to establish the programs and maintain them as written in the PWS with AFI/T.O. or other regulatory requirements.

17 Site Visit

Is the USG aware and/or planning to address mold and other damages prior to contract start?

During the site visit, it was noted that many offices had mold and other signs of damage that could potentially impact the safety and health of personnel working in the facilities.

Facilities with mold and mildew may be brought to the attention of the COR, and the COR will submit work orders to CE for a request to remove.

18 Site Visit Can the USG clarify how many vehicle lift(s) are available for contractor use during contract performance?

2 permanently installed vehicle lifts

19 Site Visit Can the USG clarify how many tire changer(s) are available for contractor use during contract performance?

1 tire machine.

20 Attachment 3- Section

Can the USG clarify which volumes must be in the redacted final submission?

Specifically requesting clarification regarding Vol I: RFP documents, SF 1449, and business registration with company information.

The redacted copy of final submission must be in Volume V. Volumn I must contain all the signed and filled copies of the solicitation and the amendment(s), and certifications and representation documents required under the Eligibility for Award of ROK MND Contracts on the first and the second pages of the Addendum to 52.212-1 as well as the required documents under 6. Request for Proposal Content, page 4 of the addendum to 52.212-1.

21 Can the USG consider extending the bid proposal submission due date until 20 December 2024?

No.

22 FAR 15.102

Can the USG consider including an oral presentation as part of the evaluation process for this solicitation?

Given the history of the MOB VM contracts, including an oral presentation may be a good idea to ensure all expectations are met.

No, having an orgal presentation will not be considered at this time.

23 Can a contractor team up with a subcontractor to compete for this requirement?

Yes, A prime contractor can have a subcontractor(s) to compete for this requirement and perform the service. Yet, the prime contractor still must provide copy of a valid and current business registration (사업자등록증) with business item in General Motor Vehicle Repair and Maintenance (자동차종합수리) issued by ROK Government. The registration of a subcontractor cannot be substituted for the prime contractor's registration. A prime contractor shall provide a copy of Contractor Teaming Arrangements meeting the requirements under 10. Contractor Teaming Arrangements, page 6 of Attachment 3 Addendum to 52.212-1 and 52.212.2 of this solicitation.