This is a Questions and Answers document containing 33 questions and responses related to a WRM Vehicle Maintenance contract at Kunsan Air Base for Korean vendors only.

Key details include: The period of performance is clarified as a base year plus 4 option years; up to 19 mechanics are recommended for the work; the fleet consists of 500 authorized vehicles (486 assigned plus 36 excess, totaling 522); the prime contractor must have an active SAM registration and valid General Motor Vehicle Repair and Maintenance registration (subcontractor registrations cannot substitute); the facility includes 1 fixed 9.5 ton lift with 2 additional movable lifts being requested, 2 small tire machines and 1 large tire machine; CAPM CLINs have been added with a unit price of $10,000; the previous contractor was Bosung Industry Company; and the government will provide NIPR, power and utilities for the contractor's office space, though permits will be required for installation. Several details about fleet age and maintenance rates are marked as CUI and will only be shared with vetted contractors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. PWS Para Question Answer

Attachment 1 PWS Page 1, Paragraph 1.4. Period of Performance

The Period of performance is 3-month base year plus four (4) option years, with a 9-month fifth option year, and 6-month-8 extension.

But if you look at page 3 and 7 of the solicitation, the CLIN items quantity is different from the PWS Period of Performance.

Could you please verify which one we should follow when preparing the quotation?

Reword: Period of Performance: The period of performance for this requirement shall be a base year plus four (4) option years.

Attachment 1 PWS Page 6, Paragraph 1.5.10.1 Key Personnel (QCT)

- The qualification requirements of the Quality Control Technician are missing.

Refer to section 1.5.2.

Quality Control Technician (QCT): The QCT shall be responsible to the Management of the Company for all Quality issues. Per the Federal Acquisition Regulation, Clause 52.212-4 has been inserted into this contract. Paragraph (a) states: “The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price.” The QCT will be required to prepare, maintain, and execute the Quality Control Plan.

Attachment 3, Addendums Page 4, Paragraph 6.

Request for Proposal

Content

- According to attachment 3, the contractor shall submit the copy of the valid and current business registration with the business item in General Motor Vehicle Repair and Maintenance. Can the Subcontractor’s registration certificate replace the Prime contractor’s registration certificate? (Can Prime contractor without the General Motor Vehicle Repair and Maintenance registration certificate sign an MOU with Sub contractor with the General Motor Vehicle Repair and Maintenance registration certificate to participate in the bidding?)

The Government decided not to change the current business registration requirement. A subcontractor's registration certificate cannot replace the Prime contractor's registration certificate. The primary rationale for the decision not to change the business registration requirement is due to the complexity and the importance of the vehicle maintenance requirement.

Attachment 3 Addendums Page 6, Paragraph10.

Contractor Teaming

Arrangements

If we arrange the team, do we have to register our team on SAM? Or can we sign a document without SAM registration and sign an MOU or CTA to form a team?

A prime contractor is the only one must to have an active SAM registration. A subcontractor does not need to have a SAM registration.

5 1.2.2, 7.3

Can the USG clarify which number of vehicles is correct and the maximum number of vehicles the contractor will be required to perform?

Para 1.2.2 shows 500 authorized, 486 assigned, and 32 excess vehicles (total 518 = 486 + 32).

Para 7.3 shows 523 vehicles in the fleet instead of 518 in Para 1.2.2.

Total: 500 Authorized 486 Assigned 36 excess Total: 522

6 1.3 Attachment 1 (PWS), Para 1.3 – Can the USG provide the current MC, NMCM, and NMCS rates for the vehicle fleet?

Currently, that data is CUI. Once Contractors are vetted, this information can be shared.

7 1.5.7.3 Attachment 1(PWS), Para 1.5.7.3 – Does the Materiel Control Specialist (MCS) require CAC and NIPR access?

Para 1.5.7.3 excludes the MCS.

Yes, Need to add to Para 1.5.7.3

8 1.5.7.3 Should the “Supply Technician” be changed to Materiel Control Specialist, or does the contract require Supply Technician(s)?

Need to change verbiage to Material Control Specialist and remove Supply Tecnician.

9 1.510.6

Attachment 1 (PWS), Para 1.510.6 – Can the USG clarify if an ATT is required for the contract?

Paragraph 1.5.7.3 includes “EMT ATT,” but nowhere else in the contract is a description for the ATT position. The Osan VM PWS includes the ATT, but the Kunsan VM PWS does not.

Remove ATT due to not having the capabilities at our location.

10 1.5.11 Can the USG clarify if the contractor shall provide a full-time CM or a part-time CM located within Korea that can meet within two hours?

Please refer 1.5.16.1 The availability requirement can be met by a phone call.

11 3.1 Can the USG clarify whether the water is potable or non-potable in each building where the contractor works?

Bioenvironmental is taking a water sample 3 Dec 24 and can provide the answer once we get the results. 5 gallon replacable water coolers are located in bldg 968 that the contractors may utilize and supply their own water.

12 3.4.3 Can the USG clarify if the contractor will act as Equipment Custodian(s), or will the role remain with the USG as part of the Equipment Accountability Element (EAE) under Supply?

The role will remain with the USG as part of the Equipment Accountability Elemend (EAE) under Base Supply.

13 3.5 Can the USG clarify if the contractor should purchase toner for USG printers? If so, how many and what are the types of printers?

3.5 states yes, there is 1 printer. The type is: Samsung Model SL-K6300LX S/N:

ZPTGBJLW300090A

14 5.19.7 Can the USG clarify ILS-S reconciliation requirements since DAFI 24- 302 (dated 21 February 2020) does not include ILS-S?

Remove ILS-S, and replace with Property and Accountability APSR work plan guide. Same DAFI and para.

15 7.4

Can the USG provide context on why the number of mechanics at the Kunsan VM contract (5ea) and the Osan VM contract (15ea) vary so much?

We want to ensure accurate expectations with similar contract requirements and significantly different mechanic estimates.

Update amount of mechanics to recommending upto 19 mechanics.

16 Site Vist

Will the contractor be required to clean and organize the shops after the contract starts, or will the government ensure the shops are cleaned and organized before the contract starts?

During the site visit, it was noted that many office areas were dirty, parts scattered, and hazardous material was improperly stored.

Contractors must move items to their temporary office facility.

Previous contractor personal items will be removed. Scattered tools, parts and unorganized hazardous materiels must be taken care of by the contractor during the phase-in process. It is the responsibility of the contrator to establish the programs and maintain them as written in the PWS with AFI/T.O. or other regulatory requirements.

17 Site Visit

Is the USG aware and/or planning to address mold and other damages prior to contract start?

During the site visit, it was noted that many offices had mold and other signs of damage that could potentially impact the safety and health of personnel working in the facilities.

Workorders have been put in to CE to address any damages and potential Mold issues that needs repaired.

Can the USG clarify how many vehicle lift(s) are available for contractor use during contract performance?

Currently there is 1 fixed 9.5 ton lift. MOB will request for a UFR for 2 movable lifts.

Can the USG clarify how many tire changer(s) are available for contractor use during contract performance?

2 Small Tire Machines and 1 Large Tire machine

20 Attach 3, Sec. 9

Can the USG clarify which volumes must be in the redacted final submission?

Specifically requesting clarification regarding Vol I: RFP documents, SF 1449, and business registration with company information.

The redacted copy of final submission must be in Volume V. Volumn I must contain all the signed and filled copies of the solicitation and the amendment(s), and certifications and representation documents required under the Eligibility for Award of ROK MND Contracts on the first and the second pages of the Addendum to 52.212-1 as well as the required documents under 6. Request for Proposal Content, page 4 of the addendum to 52.212-1.

Can the USG consider extending the bid proposal submission due date until 20 December 2024?

No

Can the USG consider including an oral presentation as part of the evaluation process for this solicitation?

Given the history of the MOB VM contracts, including an oral

No, having an orgal presentation will not be considered at this time.

23 Site Visit Bathroom in BLDG 968- PWS said contractor shall install and finish, is this accurate?

I have confirmed with 8 CE, the bathroom can be utilized. If contractor would like to update the bathroom they may.

24 Site Visit Who was previous Contractor? The previous contractor was Bosung Industry Company.

25 Site Visit What will be provided for the sheltor/ office space on Kunsan? NIPR, Power, utilities?

We will provide NIPR, Power and Utilities

26 Site Visit Confirm the GOV currently owns the condemned building for office space?

Yes, the GOV owns the condemned building for the Office Space.

CE will be removing the condemmed building and rebuilding a new office/bathroom/shower/breakroom. This project will take upto 1 to

1.5 years for completion.

27 Sit Visit Will there be permits required to build and install the contractor supplied office space.

Yes, permits and coordinations with 8th Civil Engineering Squadron are required. The COR will support this task.

28 Site Visit Number of integrated vehicles and turnover plan?

Refer to 25-101, para A7, 10.1. Will provide updated integrated vehicles once the contractors are vetted.

29 Site Visit Can the Prime use a Sub-contractors experience for evaluation?

No, as they would need to have one of their team members provide the evaluation who would be working on the vehicles.

30 Site Visit Is there a plan to get more clam shells or vehicle storage? Will the contractor be required to get airfield access?

Please refer to 3.7, and 5.14.6.2/5.14.6.3. We are currently in the process of procuring Climate controlled HAS Hangers to provide more storage for our WRM fleet to bring them out of the elements.

31 Site Visit Is there a CAPM Clin or funds? Is this necessary for this contract?

CAPM CLINs have been added and the PWS has been updated with the section about CAPM process. The unit price for CAP/M is $10,000. Each offeror shall factor CAP/M and $10,000 as the unit price in the price offer.

32 Site Visit Porta-Cools- PWS Says contractor provide but there was two in the vehicle storage area. Are those provided now?

Refer to 4.4. Yes the contractor shall provide porta-Cools for the maintenance shop. Also, the two that are currently in the vehicle storage facilities maybe utilized by the contractors however, any maintenance or repairs will not be at the expense of the Air Force.

33 Site Visit Average WRM Fleet Age? Currently, that data is CUI. Once Contractors are vetted, this information can be shared.