This document is a Quality Assurance Surveillance Plan (QASP) for the Willamette Valley Project Terrestrial Weed Treatment contract. The QASP outlines the government's systematic approach to monitoring and evaluating the contractor's performance in controlling noxious and invasive weeds across multiple project sites in Lane and Linn Counties, Oregon. The plan emphasizes a performance-based management strategy that focuses on achieving desired outcomes rather than strictly adhering to specific processes, with the contractor responsible for developing and implementing a quality control program.

Key surveillance methods include 20% random inspections and 100% inspections for specific requirements, such as herbicide application, non-target damage limitation, and documentation. Performance objectives cover precise herbicide application, minimizing damage to non-target species, protecting rare and endangered species, and maintaining proper public signage. The government will assess the contractor's performance monthly, with potential incentives for exceeding performance standards and deductions for falling short of required service levels. The performance monitoring will be documented using specific forms and will involve regular reviews between the Contracting Officer's Representative (COR) and the contractor to discuss performance, issues, and potential improvements.

View the file

Other files for this federal contract opportunity

Other files attached to USACE Willamette Valley Project Terrestrial Weed Treatment, newest first.
File Type Posted
Solicitation Amendment - W9127N25QA0590001.pdf PDF
Attachment 1 - Herbicide PWS - 7N25QA059-0001.pdf PDF
Solicitation - W9127N25QA059.pdf PDF
Attachment 6-WageDetermination_No.1977-0079.pdf PDF
Cherry_Orchard_Broadcast_MarchApplication.pdf PDF
Dexter_Wetland_Spot_SeptApplication.pdf PDF
Lakeside_Park_Spot_Broadcast_MarchAndNovApplication.pdf PDF
Middle_Green_Oaks_Spot_SeptApplication.pdf PDF
South_Green_Oaks_Spot_SeptApplication.pdf PDF
Attachment 1 - Herbicide PWS - 7N25QA059.pdf PDF
Attachment 3-Engineer Form 6206 Activity Hazard Analysis.pdf PDF
East_Kirk_Broadcast_DecApplication.pdf PDF
East_Kirk_Spot_SeptApplication.pdf PDF
East_Shore_Broadcast_DecApplication.pdf PDF
East_Shore_Broadcast_MarchApplication.pdf PDF
East_Shore_Spot_SeptApplication.pdf PDF
East_Spires_Spot_SeptApplication.pdf PDF
Gibson_Island_Spot_SeptApplication.pdf PDF
South_Green_Oaks_Broadcast_DecApplication.pdf PDF
West_Shore_Spot_JuneApplication.pdf PDF
Willamette_River_Basin.pdf PDF
Big_Spires_Broadcast_MarchApplication.pdf PDF
Cherry_Orchard_Broadcast_DecApplication.pdf PDF
North_and_South_Eaton_Spot_SeptApplication.pdf PDF
Pine_Meadows_North_Spot_Broadcast_MarchAndNovApplication.pdf PDF
Pine_Meadows_South_Spot_Broadcast_MarchAndNovApplication.pdf PDF
Royal_RNA_Spot_SeptApplication.pdf PDF
South_Green_Oaks_Broadcast_MarchApplication.pdf PDF
West_Spires_Broadcast_DecApplication.pdf PDF
West_Spires_Spot_SeptApplication.pdf PDF
Green_Oaks_Broadcast_NovApplication.pdf PDF
Green_Oaks_Woodland_Stumpcut_SeptApplication.pdf PDF
Attachment 2-Engineer Form 6293 Accident Prevention Plan.pdf PDF
Attachment 4-Engineer Manual 385-1-1.pdf PDF
Big_Spires_Broadcast_DecApplication.pdf PDF
East_Spires_Broadcast_DecApplication.pdf PDF
Eaton_Woodland_Stumpcut_SeptApplication.pdf PDF
North Eaton_Broadcast_DecApplication.pdf PDF
Spillway_Road_Spot_DecApplication.pdf PDF
West_Shore_Lane_Broadcast_DecApplication.pdf PDF
West_Shore_Spot_SeptApplication.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1 INTRODUCTION

1.1.1 This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Willamette Valley Project Terrestrial Weed Treatment This plan sets forth the procedures and guidelines the Contracting Officer’s Representative’s (CORs) will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.2 Purpose

1.2.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

1.2.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.3 Performance Management Approach

1.3.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the Willamette Valley Project and Rogue River Project to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management;

this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

1.3.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.4 Performance Management Strategy

1.4.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Willamette Valley Project and Rogue River Project contracting officer representative (COR) and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the

CO.

2.2 The Contracting Officer’s Representative

The COR’s are designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. If the contractor exceeds the service or performance level, it is eligible to receive an incentive or award fee as stated in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are

Periodic Inspection – COR/COR typically performs the periodic inspection on an unscheduled frequent occurrences.

100% Inspection – Zero room for any deviations to the contractual terms and conditions.

4.2 Customer Feedback

The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the CO/COR. The CO/COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment 3.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

4.3 Acceptable Quality Levels

The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls.

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes.

Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.

5.2 Monitoring Forms

The government’s QA surveillance, accomplished by the COR and QA will be reported using the monitoring forms in Attachments 2 and 3. The forms and the government commissioning of the turbine unit, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results of turbine installation are being achieved.

5.2.1 The COR will retain a copy of all completed QA surveillance forms.

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

6.2 Reporting

6.2.1 At the end of each month, the QAR will prepare a written report for the COR summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

6.3 Reviews and Resolution

6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the COR and other government IPT personnel as deemed necessary to discuss performance evaluation. The

COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with COR as often as required or per the contractor’s request. The agenda of the reviews may include:

Monthly performance assessment data and trend analysis

Issues and concerns of both parties

Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

Recommendations for improved efficiency and/or effectiveness

Issues arising from the performance monitoring processes

6.3.2 The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action.

Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented.

Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the at the convenience of the PCO/ACO.

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective

Standard Method of Surveillance

Validated Complaints/Allowed number of discrepancies

For spot, broadcast, and cut-stump treatment

The specified herbicide formulation will be applied directly to all individuals or areas of the target species in the treatment unit specified.

20% random Inspection

5% or more target plants not visibly affected per each treatment unit; 100% of cut-stump targets cut and stumps treated and dye visible

For spot treatment, non-target damage will be limited to an 8” radius around each target individual. No non-target species will be purposely sprayed.

20% random Inspection

5% error in applicator species ID, 5% overspray beyond 8”

For cut-stump treatment, non-target damage will be limited to a 3” radius around each target individual. No non-target species will be purposely sprayed

20% random Inspection

5% overspray beyond 3”

For broadcast treatment, non-target.

damage will be limited to 1 meter from unit boundaries except no damage will occur on non-Corps of Engineers property.

20% random Inspection

No drift beyond one meter, no damage to neighboring property

When specific herbicides are prescribed, unsusceptible non-target plants will be undamaged.

20% random Inspection

No evidence of non-specific damage

Rare and endangered species

IAW with Section 5.0 of PWS 100% inspection No evidence of damage

Public posting (signage)

Access routes to all units posted with complete information

100% inspection Access routes to all units posted with complete information

Documentation and reporting

No missing and erroneous documentation

100% inspection No missing and erroneous documentation

ATTACHMENT 2: CONTRACTOR DISCREPANCY REPORT

Fillable Form can be found at the following link:

http://www.dtic.mil/whs/directives/forms/eforms/dd2772.pdf http://www.dtic.mil/whs/directives/forms/eforms/dd2772.pdf

ATTACHMENT 3: QUALITY ASSURANANCE MONITORING FORM

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint

LEVEL OF SURVEILLANCE (Check):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check): Meets Standards

Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: ___________________________________ DATE: _________________

1 INTRODUCTION
1.1.1 This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Willamette Valley Project Terrestrial Weed Treatment This plan sets forth the procedures and guidelines the C...
1.2 Purpose
1.2.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting th...
1.2.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality a...
1.3 Performance Management Approach
1.3.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by...
1.3.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach mi...
1.4 Performance Management Strategy
1.4.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under ...
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
2.2 The Contracting Officer’s Representative
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
4.2 Customer Feedback
4.3 Acceptable Quality Levels
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
5.2 Monitoring Forms
5.2.1 The COR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to sh...
6.2 Reporting
6.2.1 At the end of each month, the QAR will prepare a written report for the COR summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted mo...
6.3 Reviews and Resolution
6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the COR and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews ...
6.3.2 The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics wil...