Attachment 5 - QASP.docx
DOCX document 21 KB Posted
- Solicitation number
- 36C25926Q0715
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for maintenance and support services of the Public Address Mass Notification System (PAMNS) and Code Blue Help Point systems at the VA Salt Lake City Healthcare System. The QASP establishes systematic evaluation procedures to ensure contractor compliance with the Statement of Work and maintains continuous operation and reliability of both systems. The government retains responsibility for objective, fair, and consistent performance evaluation, while the contractor manages quality control to meet contract terms. The QASP is designated as a living document subject to regular review and revision in coordination with the contractor.
The performance objectives include maintaining system operational status at a minimum of 95% annually, conducting preventive maintenance on an approved schedule with 100% compliance, responding to support and repair requests according to specified timeframes, submitting monthly maintenance reports by the 5th of each month, conducting system upgrades meeting manufacturer specifications, and maintaining compliance with VA security and safety protocols. Surveillance methods include random inspections, periodic inspections, customer feedback collection, and documentation review. The Contracting Officer's Representative monitors contractor performance through daily work logs, review meetings, and formal performance evaluations. Any serious or consistent failures to meet performance standards may result in corrective actions ranging from contractor notification to contract termination or non-renewal. Required reports include an Initial Assessment Report within 30 days of contract start, Monthly Maintenance Reports, Detailed Repair and Upgrade Reports within 5 days of task completion, and annual Inventory and System Condition Reports.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Vendor Questions and Answers.docx | DOCX document | |
| RFQ Amendment - 36C25926Q0715 0001.docx | DOCX document | |
| Revised - Statement of Work for Amendment 0001.docx | DOCX document | |
| Attachment 4 - PAMNS Single Line Diagrams for buildings.pdf | ||
| Attachment 1 - Code Blue Help Point - External Campus Locations.pdf | ||
| RFQ - 36C25926Q0715.docx | DOCX document | |
| Solicitation Site Visit Information.pdf | ||
| Attachment 6 - External Campus - Code Blue Help Point Equipment List.xlsx | XLSX spreadsheet | |
| Attachment 3 - VA Directive 6500.6 Appendix C.pdf | ||
| Attachment 2 - Code Blue Help Point - External Campus Boring Routes.pdf | ||
| Statement of Work.docx | DOCX document | |
| 36C25926Q0715.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP) for Public Address Mass Notification System (PAMNS) and Code Blue Help Point System Maintenance Support Services
1.0 Introduction
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate the services provided by the contractor in accordance with the Statement of Work (SOW) for the maintenance and support of the Public Address Mass Notification System (PAMNS) and the Code Blue Help Point systems at the VA Salt Lake City Healthcare System (SLCHCS).
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2.0 Purpose
The purpose of this QASP is to ensure services provided by the contractor are performed in accordance with the contract requirements, and to ensure the continuous operation, reliability, and performance of the PAMNS and Code Blue Help Point systems within the designated facilities.
3.0 Performance Objectives and Measures
The primary performance objectives and measures are derived from the contract's Scope of Work and objectives.
| Performance Objective |
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Method of Surveillance |
| Incentive / Disincentive |
| Ensure PAMNS and Code Blue Help Point systems are fully operational |
| PAMNS and Code Blue Help Point systems shall be operational at minimum of 95% for annually for each unit |
| 95% |
| Monitoring, Reports, Inspections |
| Potential Exercise of the next Period of Performance / Administrative Corrective Actions that may lead to Termination of the contract |
| Prevent system failures |
| Preventive maintenance shall be conducted as per the approved schedule |
| 100% |
| Scheduled Inspections |
| Favorable Performance Evaluation / Administrative Corrective Actions that may lead to Termination of the contract |
| Respond to support and/or repair requests promptly |
| Meeting the SOW paragraph 6.2 Response Time Requirements based on the Failure Type, Remote / Phone Response, and On-Site Response times. |
| 100% |
| Customer Feedback, Call Logs |
| Favorable Performance Evaluation / Administrative Corrective Actions that may lead to Termination of the contract |
| Maintain accurate records |
| Monthly maintenance reports submitted by the 5th of each month |
| 100% |
| Document Review |
| Potential Exercise of the next Period of Performance / Administrative Corrective Actions that may lead to Termination of the contract |
| Conduct system upgrades and modifications |
| System upgrades and modifications shall meet manufacturer’s specifications |
| 100% |
| Inspection, Test Reports |
| Favorable Performance Evaluation / Administrative Corrective Actions that may lead to Termination of the contract |
| Compliance with safety and security protocols |
| Contractor personnel comply with all VA security, identification, and parking regulations |
| 100% |
| Visual Inspection, VA Security Reports |
| Potential Exercise of the next Period of Performance / Administrative Corrective Actions that may lead to Termination of the contract |
4.0 Methods of Surveillance
The performance of the contractor will be monitored by the COR through the following methods of surveillance:
· Random Inspections: Unscheduled checks to verify compliance with contract requirements.
· Periodic Inspections: Scheduled reviews of preventive maintenance and repair work.
· Customer Feedback: Gathering feedback from facility staff on contractor performance and responsiveness.
· Review of Reports and Documentation: Analyzing reports such as Initial Assessment Reports, Monthly Maintenance Reports, and Detailed Repair and Upgrade Reports.
5.0 Documentation and Reports
Contractor is required to submit the following reports as specified in the SOW:
· Initial Assessment Report: Within 30 days of contract start date.
· Monthly Maintenance Reports: By the 5th business day of each month, detailing all activities performed, the condition of the systems, and any recommendations.
· Detailed Repair and Upgrade Reports: Within 5 days of task completion.
· Updated Inventory and System Condition Reports: Annually.
6.0 Evaluation Procedures
· Daily Work Logs: The contractor shall use a daily log system at the facility indicating times of arrival and departure along with a description of the work performed.
· Review Meetings: Regular review meetings between the contractor and the COR to discuss performance, issues, and improvements.
· Performance Reviews: The COR will conduct formal performance reviews to assess the contractor’s adherence to the SOW and QASP.
7.0 Performance Thresholds
The COR shall take immediate action to address any deviations from the performance objectives and standards. Any serious or consistent failures to meet the required AQL might result in formal corrective actions ranging from contractor notification to contract termination or non-renewal.
8.0 Roles and Responsibilities
Contracting Officer (CO): Responsible for awarding and administering the contract.
Contracting Officer’s Representative (COR): Responsible for the day-to-day monitoring of the contractor's performance and compliance with the contract. The COR will also ensure that any identified issues are addressed promptly.
9.0 Signatures
Signature – Contracting Officer Representative
Signature – Contracting Officer