ATTACHMENT 5 PAST PERFORMANCE INFORMATION SURVEY INCLUDES REFERENCE INSTRUCTONS.pdf
PDF 224 KB Posted
- Attached to
- R614--Document Destruction
- Solicitation number
- 36C24721Q0329
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24721Q0329_2.docx | DOCX document | |
| POSTING EAP COMBINED SOLICITATION SYNOPSIS 36C24721Q0664.docx | DOCX document | |
| ATTACHMENT 4 CERTIFICATE OF DESTRUCTION.pdf | ||
| SF 3881.pdf | ||
| VA 6371dir14.pdf | ||
| NIST.SP.800-88r1.pdf | ||
| ATTACHMENT 2 - PICK-UP LOG.pdf | ||
| 36C24721Q0329_1.docx | DOCX document | |
| ATTACHMENT 6 VA10091.pdf | ||
| VHA 1605.05 BUSINESS ASSOCIATE AGREEMENT.pdf | ||
| ATTACHMENT 1 Bin Locations _ DOWNTOWNUPTOWN - AUGUSTA VA HOSPITAL.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 5:
PAST PERFORMANCE INFORMATION/SURVEY (INCLUDES REFERENCE
INSTRUCTONS)
OFFEROR INSTRUCTIONS: A separate record must be completed for each Past
Performance Information and Survey; Offeror must directly send to the evaluator, requesting they complete and return to the Contracting Officer as indicated on the attached Past Performance Survey, no later than 12 NOON PM (EST.) 15th June 2021. Further, Offeror must include a copy of each requested Past Performance Information page with proposal submission.
Name of Offeror being evaluated:
Address of Offeror:
Contract Details (i.e. Contract Number / Delivery or Task Order Number, Title, Location, etc.):
Name of Evaluator:
Position held or function in relation to project:
Company Name:
Address:
Contact Phone Number:
Facsimile Number:
Please complete and return to above no later than 12 NOON PM (EST.) 15 JUNE 2021:
PAST PERFORMANCE SURVEY
REFERENCE INSTRUCTIONS: Charlie Norwood VA Medical Center, Augusta GA is considering the offeror listed above for award of a VA contract. Your comments would be appreciated regarding this firm’s past performance. The intent of this form is to evaluate
Shredding/ Document Destruction Service. Your comments are considered Source Selection
Sensitive; therefore, you are advised that the Federal Acquisition Regulation (15.506) prohibits the release of the names of individuals providing reference information about Offeror’s past performance. survey should be completed by evaluator and returned no later than the above date, by email to Darlene.Chase@va.gov.
Please evaluate the past performance using only the following ratings without variation. If the rating is Marginal or Unacceptable, please provide additional information in the appropriate block or in the remarks section of this form.
“O” = Outstanding = Performance greatly exceeded the contract requirements
“A” = Above Average = Performance exceeded the contract requirements
“S” = Satisfactory = Performance met the contract requirements
“M” = Marginal = Performance met the minimum contract requirements but some material aspects of the contractor’s performance were less than satisfactory
“U” = Unacceptable = Performance was poor and/or did not satisfy contract requirements
Please rate and provide information/comments for the following: Circle one
Q1. To what extent did the contractor comply with contract requirements? O A S M U
Q2. If reports were required, were they accurate in meeting contract requirements?
O A S M U
Q3. To what extent did the contractor use appropriate personnel for contract requirements?
O A S M U
Q4. To what extent did the contractor display technical expertise? O A S M U
Q5. Quality control: O A S M U
Please rate and provide information/comments for the following: Circle one
T1. To what extent was contractor able to meet the performance schedule: O A S M U
T2. What extent was contractor flexible in responding to changing needs? O A S M U
T3. To what extent was the contractor reliable? O A S M U
T4. To what extent was the contractor responsive to technical directions? O A S M U
T5. Have any cure notices, show cause letters, suspension of payment, or termination been issued? If yes, please explain.
Yes No
C1. Would you award another contract to the party being evaluated? If no, please explain:
Yes No
C2. Was the customer satisfied with the end product? If no, please explain:
Yes No
C3. To what extent did contractor notify you of problems or potential problems?
O A S M U
15. Additional Remarks:
Signature of Evaluator Date
File details come from the government source that posted it. Updated .