ATTACHMENT 5 PAST PERFORMANCE INFORMATION SURVEY INCLUDES REFERENCE INSTRUCTONS.pdf

PDF 224 KB Posted

Attached to
R614--Document Destruction
Solicitation number
36C24721Q0329
Issued by

View the file

Other files

File Type Posted
36C24721Q0329_2.docx DOCX document
POSTING EAP COMBINED SOLICITATION SYNOPSIS 36C24721Q0664.docx DOCX document
ATTACHMENT 4 CERTIFICATE OF DESTRUCTION.pdf PDF
SF 3881.pdf PDF
VA 6371dir14.pdf PDF
NIST.SP.800-88r1.pdf PDF
ATTACHMENT 2 - PICK-UP LOG.pdf PDF
36C24721Q0329_1.docx DOCX document
ATTACHMENT 6 VA10091.pdf PDF
VHA 1605.05 BUSINESS ASSOCIATE AGREEMENT.pdf PDF
ATTACHMENT 1 Bin Locations _ DOWNTOWNUPTOWN - AUGUSTA VA HOSPITAL.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 5:

PAST PERFORMANCE INFORMATION/SURVEY (INCLUDES REFERENCE

INSTRUCTONS)

OFFEROR INSTRUCTIONS: A separate record must be completed for each Past

Performance Information and Survey; Offeror must directly send to the evaluator, requesting they complete and return to the Contracting Officer as indicated on the attached Past Performance Survey, no later than 12 NOON PM (EST.) 15th June 2021. Further, Offeror must include a copy of each requested Past Performance Information page with proposal submission.

Name of Offeror being evaluated:

Address of Offeror:

Contract Details (i.e. Contract Number / Delivery or Task Order Number, Title, Location, etc.):

Name of Evaluator:

Position held or function in relation to project:

Company Name:

Address:

Contact Phone Number:

Facsimile Number:

Please complete and return to above no later than 12 NOON PM (EST.) 15 JUNE 2021:

PAST PERFORMANCE SURVEY

REFERENCE INSTRUCTIONS: Charlie Norwood VA Medical Center, Augusta GA is considering the offeror listed above for award of a VA contract. Your comments would be appreciated regarding this firm’s past performance. The intent of this form is to evaluate

Shredding/ Document Destruction Service. Your comments are considered Source Selection

Sensitive; therefore, you are advised that the Federal Acquisition Regulation (15.506) prohibits the release of the names of individuals providing reference information about Offeror’s past performance. survey should be completed by evaluator and returned no later than the above date, by email to Darlene.Chase@va.gov.

Please evaluate the past performance using only the following ratings without variation. If the rating is Marginal or Unacceptable, please provide additional information in the appropriate block or in the remarks section of this form.

“O” = Outstanding = Performance greatly exceeded the contract requirements

“A” = Above Average = Performance exceeded the contract requirements

“S” = Satisfactory = Performance met the contract requirements

“M” = Marginal = Performance met the minimum contract requirements but some material aspects of the contractor’s performance were less than satisfactory

“U” = Unacceptable = Performance was poor and/or did not satisfy contract requirements

Please rate and provide information/comments for the following: Circle one

Q1. To what extent did the contractor comply with contract requirements? O A S M U

Q2. If reports were required, were they accurate in meeting contract requirements?

O A S M U

Q3. To what extent did the contractor use appropriate personnel for contract requirements?

O A S M U

Q4. To what extent did the contractor display technical expertise? O A S M U

Q5. Quality control: O A S M U

Please rate and provide information/comments for the following: Circle one

T1. To what extent was contractor able to meet the performance schedule: O A S M U

T2. What extent was contractor flexible in responding to changing needs? O A S M U

T3. To what extent was the contractor reliable? O A S M U

T4. To what extent was the contractor responsive to technical directions? O A S M U

T5. Have any cure notices, show cause letters, suspension of payment, or termination been issued? If yes, please explain.

Yes No

C1. Would you award another contract to the party being evaluated? If no, please explain:

Yes No

C2. Was the customer satisfied with the end product? If no, please explain:

Yes No

C3. To what extent did contractor notify you of problems or potential problems?

O A S M U

15. Additional Remarks:

Signature of Evaluator Date

File details come from the government source that posted it. Updated .