Contract Opportunity Amendment to a Previous Combined Solicitation

PRODUCT SERVICE CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

BASE NOTICE TYPE

RESPONSE DATE/TIME/ZONE

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Amendment to a Previous Combined Solicitation R614 Document Destruction 30084 36C24721Q0329 06-15-2021

12PM

EASTERN TIME, NEW YORK, USA

N

SDVOSBC

561990 Department of Veterans Affairs VISN 7 Network Contracting Office LaVista Business Park - Bldg A 2008 Weems Road Tucker GA 30084 Darlene.Chase@va.gov

QUESTIONS AND ANSWERS FOR DOCUMENT DESTRUCTION - 36C24721Q0329

Attachments

· Attachment 1 – there are “spare” containers listed in both the “uptown” and “downtown” tables. What will those be used for and how should we include those in the bid entered on the Price Schedule? In other words will they be serviced on the same schedule as the other bins at those locations? Spares are used to address immediate need for a shred bin or replacement for an overflowing bin. These will only be serviced if put in place with notification to the Contractor in advance.

· Is it necessary to submit attachments 6 (Form 10091) and 7 (Form 3881) with our bid or can that be done post-award? It is suggested that these forms be filled out Pre-award, but can be filled out Post-award.

Synopsis

· Please confirm that VA Directive 6371 is the guiding document for shredding. As per SOW “in accordance with performance requirements in paragraph 10 below, NIST Special Publication 800-88 (Revision 1) Guidelines for Media Sanitization, VA Directive 6371, Destruction of Temporary Paper Records and VA Directive 6500 VA Cybersecurity Program”

· P.1 It is stated here that this is an SDVOSB and VOSB set-aside solicitation, but if the Rule of Two is met the set-aside should be 100% set-aside for SDVOSB businesses, which is distinct from a VOSB set-aside as indicated by the distinct VAARs. This statement also contradicts p. 34, 3. Where it states that this is a 100% SDSVOSB set-aside. Was the Rule of Two met during market research, and if it was, why isn’t the set-aside 100% SDVOSB? FAR clause – FAR Clause 852.219-10 is included in this solicitation. SDVOSB AND VOSB’s are under the rule of two.

· P. 1., 2. SOW. How will hard drives be presented e.g. boxes? Can the hard drives be destroyed off-site? Hard drives may NOT be destroyed off-site. They will be provided in bundles.

· P. 1., 2. SOW. How many boxes of media should be priced in CLIN 0010? Can the media be destroyed off-site? We do destruction of hard drives quarterly and it is not a set amount. Price should indicate a per destruction in absence of an actual number. Again, NO, hard drives may NOT be destroyed off-site.

· P. 2, 1. E. Is the CAO located in the Phoenix Building referenced in CLIN 0008? Yes

· P. 5, 10.1.3. Should the rolling bins have a narrow slot in which to insert paper for destruction? Yes Also, consoles and rolling bins have different style locks, will two master keys suffice? Yes

· P. 5, 10.1.4 and 10.1.5. Standard consoles do not roll, so must be unlocked to remove the bag and empty it into a rolling bin. Please clarify that consoles can be unlocked to shift material to a rolling bin, and will not need “a replacement container” provided. Replacement container is only needed if you remove the container for dumping/destruction.

· P. 6, 10.1.13. States that poundage is not guaranteed, a phrase normally used when invoicing is to be by the pound. Is the Agency requesting that invoicing should be by the pound or is this is firm-fixed price contract to be invoiced by the set number of bins per service? This is a per bin service. Reports of pounds destroyed will be required but invoicing is by a per bin service.

· P. 6, 10.2.1. Hard drives and other media cannot be mixed with paper, nor can any media be burned onsite. Can the materials in this section be destroyed off-site? No materials can be destroyed off site.

· P. 9 Price Schedule The schedule is based on usage and frequency of pick ups required. This is set up in a weeks to ensure pick ups are completed in the frequency identified.

· CLINS 0003, 0004, 0006 and associated CLINS call for pick up monthly, can this be changed to every four weeks, with 13 under the quantity column? Scheduling every 4 weeks results in less schedule confusion and better service if that is possible. No, this will remain as it, if any confusion arises it can be discussed with the COR.

· CLIN 2004-2005 and 3004-3005 include hard drives, which appears to be an error, can this please be corrected or explained? Typo/error on 2004-2005, 3004-3005 no hard drives- considered removed on those lines.

· CLIN 2009-2010 and 3010 contain conflicting frequency information, can this be corrected? Clarification will remain quarterly/approx. 200 hard drives.

· CLIN 3001 has 12 weeks for the frequency, can this be changed to match “weekly”? - Correction noted - weekly

· P. 33, Special Standards (2) and (3) – for what use does the Agency require a Contractor employee’s Social Security number or home address? This requirement should be part of the security process/guidelines and will not be needed to be provided to the COR directly.

· P. 33 and p. 35, SP1. NAID AAA Certification is issued and reviewed by NAID, not Certified Protection Professionals. Can you clarify the reference to CPP in these sections? Also, if the Contractor or subcontractor are not NAID Certified, who will determine if the work being performed meets NAID standards? NAID certification is sufficient.

· P. 34, 2. Since drivers will not be finalized prior to award, may the driver’s licenses be provided post-award? YES, PRIOR TO DRIVING AND DURING TRANSITION PERIOD.

· P. 34, 3. Please confirm that this statement and the set-aside in the Notice are accurate and that this solicitation is a 100% set-aside for SDVOSB entities. YES

· P. 34, 5. Will a 1449 be provided to sign? 1449 DOES NOT BIND ANYTHING, PROPOSAL AND REQUIRED DOCUMENTS ARE ALL THAT IS NEEDED.

· P. 35, Rating System. This references Employee Assistance Program services in accordance with the SOW. Can you please clarify what this means? That is an error/typo and should be Document Destruction

Accessibility

· For the two main campuses, how far apart are the buildings where service is needed? The two campuses are 7 miles apart

· For all locations, will any bins be located above/below the ground floor? If so, are freight elevators available to move bins to/from ground level? If there is a loading dock, is there a ramp to the parking area? Yes

· Is there sufficient parking for our truck at each location/building for the time it will take to retrieve containers, shred the contents and return the containers? Yes

Incumbent

· Is there a current contract for the work being solicited? Proprietary information.

· If so, please provide that awarded contract number or task order number (NOT the incumbent GSA contractor number). Proprietary information.

· Please provide the name of the incumbent contractor and when the contract is ending. Proprietary information.

· Please provide the annual contract amount. Proprietary information.

· Is the level of effort being performed under the current contract fundamentally the same as what will be required to fulfill #36C24721Q0329? If not, please explain how the work will be different under this solicitation. Yes

· How long does it take for the incumbent to perform the weekly service at the main locations? Depends on number of bins requiring collection for destruction - maybe 4-6 hours (very rough estimate).

Additional questions and Answers 36C24721Q0329

· #
Reference
Question

· 1.

Who is the Current Incumbent? Proprietary information

· 2.

When does the current contract end? 8/31/2021

· 3.

Are any Bridge Contracts in place that extend the current contract? Yes

· 4.

What is the last contract award number and total award amount? Proprietary Information

· 5.

Would you consider extending the offer date to go over answers from
submitted questions?No, time sensitive; date stands.

· 6.

Is there a loading dock or area the truck needs to park to perform the shredding services? YES

· 7.
Section 6- 6.2 “Any changes to the schedule shall be approved in advance

by the Contracting Officer’s Representative (COR).”

How many days in advance shall the contractor/subcontractor be given to submit any schedules changes to the COR? 24-48 hours

· 8.
Section 14.2 Training
When is the possible award date for training and certificates to be

turned in prior to performance of contract? 9/1/2021

· 9.
Page 36- Past Performance
Can a CPARS be used in replacement of a Past

Performance questionnaire? NO

· 10.
Page 5, 10.1.4
Can you please define outside designated location? Same area as question 6 – “outside” referring to where truck/shredding vehicle is parked.
· 11.
Page 5, 10.1.4
With this being consoles, the bags would be emptied into a transport container and then put back into the console empty, is this what you

mean by replace? It means if you are taking the container to empty you must provide one until you return the original container.

· 12.

Are the 15 rolling bins at the uptown location and 1 at the downtown location used as regular service bins placed in the location or for collection bins? What is the reference for this? Can be discussed with COR for clarification. Please provide reference.

· 13.
Page 33 SP1 Specialized Experience / Page 35 Evaluation Criteria- SP1

Special Certifications Can these statements be removed as the directive 6371 is the guidance for the contract? No this is part of the evaluation criteria.

· 14.
Page 5, 10.1.3
Keys for the Consoles and bins are generally different keys. Based on industry practices this has never been an issue. Is a key for the console

and a key for the wheeled bin be acceptable? Yes

· 15.

Are any executive holidays observed or only what is listed? What's listed.

Signature: ___________________________________ Date: _________________________________