About this file

This document provides details on a federal contract solicitation for construction services. The Department of Veterans Affairs intends to solicit firms to provide construction services necessary for an OR Suite HVAC Replacement project at the San Diego VA Healthcare System, involving replacement of HVAC systems in operating rooms and installation of new chilled water coils, steam humidifiers, heating coils, and BMS controls. The acquisition is a total set-aside for Service-Disabled Veteran-Owned Small Businesses between $2 million to $5 million. The period of performance is 365 calendar days from notice to proceed, and bids are due via email by the issue date listed on SAM.gov. Bidders must be registered in SAM and SDVOSB firms in VetBiz to be considered.

View the file

Other files

File Type Posted
36C25821B0016 A0005.docx DOCX document
JM Roof PV Guarantee Agreement.pdf PDF
Approval letter - J M - V A Hospital.pdf PDF
S05 MASTER - IFB 36C25821B0016 Responses to RFI 001 - 096.pdf PDF
36C25821B0016 A0004.docx DOCX document
WD CA20210001 Mod 13 09-03-2021.pdf PDF
36C25821B0016 A0003.docx DOCX document
S05 MASTER - IFB 36C25821B0016 Responses to RFI 001 - 094.pdf PDF
S05 MASTER - IFB 36C25821B0016 Responses to RFI 001 - 041.pdf PDF
36C25821B0016 A0002.docx DOCX document
S04 Pre Bid Tele-Conference Minutes.pdf PDF
36C25821B0016 A0001.docx DOCX document
S04 Pre-Conference Attendence Sheet (Teams).docx DOCX document
S04 Site Visit Sign-In Sheet - 664-CSI-120.pdf PDF
S04 Pre-Conference Sign In Sheet.docx DOCX document
Attachment 15 - Citadel Environmental Services Inc Limited Lead (XRF) Survey 2013 - 4 of 6.pdf PDF
Attachment 13 - Citadel Environmental Services Inc Limited Lead (XRF) Survey 2013 - 2 of 6.zip ZIP file
Attachment 16 - Citadel Environmental Services Inc Limited Lead (XRF) Survey 2013 - 5 of 6.zip ZIP file
36C25821B0016.docx DOCX document
Attachment 6 - MECHANICAL B.pdf PDF
Attachment 17 - Citadel Environmental Services Inc Limited Lead (XRF) Survey 2013 - 6 of 6.pdf PDF
Attachment 2 - Self Performance Calculations.pdf PDF
Attachment 4 - Specification 2 of 2.pdf PDF
Attachment 10 - Final Drawings Part 3 Plumb Electrical.pdf PDF
Attachment 9 - Final Drawings Part 1 Arch Structual - Pictures Roof and Interstital.pdf PDF
Attachment 8 - Final Drawings Part 1 Arch Structual 2 of 2 - zipped.zip ZIP file
Attachment 11 - Final Drawings Part 3 Plumb Electrical - Pictures Roof Plumb and Interstital.pdf PDF
Attachment 7 - Final Drawings Part 1 Arch Structual 1 of 2.pdf PDF
Attachment 14 - Citadel Environmental Services Inc Limited Lead (XRF) Survey 2013 - 3 of 6.pdf PDF
Attachment 1 - FINAL Statement of Work 664-21-302.docx DOCX document
Attachment 3 - Specification 1 of 2.pdf PDF
Attachment 12 - Citadel Environmental Services Inc Limited Lead (XRF) Survey 2013 - 1 of 6.pdf PDF
Attachment 18 - WD CA20210001 Mod 10 07-30-2021.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

30 98

31 98

32 98

33 98

34 98

35 98

36 98

37 98

38 98

39 98

40 98

41 98

42 98

43 98

44 98

45 98

M e c h a n i c a l E l e c t r i c a l P l u m b i n g | C o n s u l t i n g E n g i n e e r s

E N G I N E E R S

46 98

47 98

48 98

49 98

50 98

51 98

52 98

53 98

54 98

File details come from the government source that posted it. Updated .