Attachment 5 - Marking Directions.pdf

PDF 144 KB Posted

Attached to
Robie Creek G – Z STEWARDSHIP IRSC – Region 4 , Boise National Forest, Mountain Home Ranger District, Idaho
Solicitation number
12363N24Q4121
Issued by

About this file

This document appears to be Attachment 5 - Marking Directions for the Robie Creek G-Z IRSC federal contract opportunity. It outlines the timber sale preparation standards and boundary marking requirements for the project area. Key details include:

The contract opportunity is a Stewardship Contract on the Boise National Forest, Mountain Home Ranger District in Idaho. The intent is to increase treatments to improve forest health and resilience, including removing hazardous fuels, managing stand structure, and mitigating threats from insects and disease. The contractor will be responsible for completing the implementation plan, logging plan, delineating treatment units, conducting timber volume cruises, and carrying out all required timber removal and service work activities. A pre-solicitation prospective bidder meeting is scheduled for April 10, 2024, and the Request for Quotes is anticipated to be issued around May 4, 2024. The resulting contract will be a firm fixed price commercial services contract awarded using a best value source selection method.

View the file

Other files

File Type Posted
Contractors_ Q_A Robie Creek G-Z.pdf PDF
Robie Creek G-Z Industry Meeting Notes.pdf PDF
8. DRAFT ID-SCA WD 1995-0228v59 12.26.23.pdf PDF
Attachment 10 - 2409.12 Chapter 10 Principles of Measuring Trees.pdf PDF
Attachment 9 - FSH 2409.12 Chapter 40 Timber Cruising - Copy.pdf PDF
7. DRAFT Robie Creek G-Z CAM.pdf PDF
6. DRAFT Robie Creek G-Z IRSC Fire Plan.pdf PDF
5. DRAFT Robie Creek G-Z Traffic Control Plan.pdf PDF
3. DRAFT Robie Creek G-Z Appendix B_Scaled.pdf PDF
Attachment 3 - SCBR Supplemental Information Report.pdf PDF
2. DRAFT Robie Creek G-Z Appendix A.pdf PDF
Attachment 12 - Basic Cruising Guide.pdf PDF
1. DRAFT Robie G-Z IRSC Solicitation.pdf PDF
Attachment 4 - Silvicultural Prescriptions DRAFT - Copy.pdf PDF
9. DRAFT WD DBA#20240092.pdf PDF
Attachment 13 - Cruise Sheets.pdf PDF
Attachment 11 - 2409.12 Chapter 10 R4 Supp. Principles of Measuring Trees.pdf PDF
Attachment 1 - Boise Tracer Paint Accountability Plan.pdf PDF
Attachment 6 - Robie Creek G-Z Harvest Card Template.pdf PDF
4. DRAFT Robie Creek G-Z Appendix C.pdf PDF
Attachment 7 - FSH 2409.12 Chapter 50 Area Determination Excerpt 1.pdf PDF
Attachment 8 - Sample Recon Cruise Instructions - Copy.pdf PDF
Attachment 2 - Sinker Creek - Boise Ridge EA.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Robie Creek G-Z IRSC

Attachment 5

MARKING DIRECTIONS

Timber Sale Preparation Standards

Boundary marks should be on trees that will remain after harvest and have the unit number facing in towards the unit, so it is visible when approaching the boundary from within the unit. Additional marks shall be placed on the sides of the trees, so that the boundary trees are inter-visible when walking a boundary (see Exhibit 1). Where paint exists from previous sale marking, notify the Forest Service for further instruction.

All marked trees will have a prominent stump mark on the downhill (or lowest) side of the tree so the paint mark cannot be easily knocked off during skidding operations. The stump mark shall be of sufficient size (~3-4” band or dot) to be readily seen and shall be placed at ground level in crevices in the bark extending into the duff layer.

Establish unit boundaries along identifiable features such as roads, stand types, ridges, RCAs, slope breaks, etc., when consistent with logging and silvicultural needs. When boundaries border system roads, boundary marking may only be needed to eliminate any confusion as to the location of the boundary, otherwise no paint or flagging will be needed. When revising unit boundaries, completely remove deleted boundary marks from all trees by scraping off marks and/or completely covering with black tracer paint. Document all boundary changes. All Timber Removal Units shall be flagged with solid orange flagging, then painted with designated tracer paint as described and shown in Exhibit 1, except along virtual boundaries. Boundary tags will only be utilized in areas of high visual impacts such as campgrounds where residual paint is not desired to be seen post-harvest.

All boundaries, including virtual shall be tracked with a GPS. When traversing unit boundaries for area-based cruises, identify and establish a reference point in case the boundary needs reestablishment at a later date. Be certain the reference point is easily identifiable to relocate. Maintain and secure all traverse notes in the sale folder. Area determination done by GPS will follow direction in Attachment 7 - FSH 2409.12 Chapter 50 Area Determination Standards Excerpt 1.

EXHIBIT 1: Boise National Forest – Standardized Boundary Timber Marking Symbols Two horizontal slashes at DBH facing into the harvest unit with Unit number between slashes. Also, on both sides of the tree a vertical line so the paint marks are inter-visible while looking along the boundary line. Additionally, stump marks at the base of the tree on the downhill or lowest side. An alternative method may be used, a horizontal strip with two vertical strips and the number inside the semi box. This method is more visible in dense vegetation and uses less paint. There is less confusion with adjacent leave tree units when a horizontal strip clear around the trees is used.

EXHIBIT 1: Boise National Forest – Standardized Boundary Timber Marking Symbols

File details come from the government source that posted it. Updated .