7. DRAFT Robie Creek G-Z CAM.pdf
PDF 2 MB Posted
- Attached to
- Robie Creek G – Z STEWARDSHIP IRSC – Region 4 , Boise National Forest, Mountain Home Ranger District, Idaho
- Solicitation number
- 12363N24Q4121
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a draft contract map for the Robie Creek G-Z Stewardship IRSC project on the Boise National Forest, Mountain Home Ranger District. The project aims to promote forest health and resiliency by managing stand structure and reducing hazardous fuels within the Wildland Urban Interface. Key details include:
The contract will be awarded under Stewardship Authority and is open to full and open competition. The project is located in T. 4 N., R. 3 E., Sections 14-16, 21-27. The period of performance is through December 31, 2029. The contractor will be required to complete an implementation plan, road analysis plan, detailed logging plan, timber removal, and various service treatments such as sub-merchantable thinning, non-commercial thinning, and mastication. The Government anticipates issuing the final Request for Quotes on or around May 4, 2024, and will hold a pre-solicitation meeting on April 10, 2024 for prospective bidders. Vendors are encouraged to submit questions and suggestions by April 26, 2024 to ensure changes are incorporated prior to the final solicitation.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
E
N
E
04A
21 22
26 30
275G
275K µ
Stewardship Items
Mandatory Item #1 - Implementation Plan of Contract Area Mandatory Item #1 - Road Analysis Plan Needed Mandatory Item #2 - Proposed Temporary Road Locations Optional Items #7, #8, #10 - Cut and Remove Included Timber, Cut, Yard, Skid, Limb and Deck Material 6"- 9.9" DBH, Submerchantable Thinning Optional Item #9 - Mastication Optional Item #11 - Non-commercial Thinning
Protected Improvements
Protected Improvement: ATV Trail (50" or less) Protected Improvement: Non-Motorized Trail
Transportaion Information
National Forest System Roads Hauling Prohibited - C5.12#
General Contract Information
Special Measures Area (SMA1) - Solicitation Section #24 Special Measures Area (SMA2) - Solcitation Section #24 Township Section Perennial Stream
Legend
0 0.1 0.2 0.3 0.40.05 Miles
Prepared by: Timber Program Specialist Mountain Home Ranger District Boise National Forest Boise, Idaho Produced: 3/14/2024 By: JustinLewellen Projection: UTM 11 N, NAD83 File: T:\FS\NFS\Boise\Project\Implementation\SouthZone\Implementation_Projects\D1_RobieCreek_25_TimberSale\Timber\RobieCreek_25_TimberSale_Timber.aprx
Robie Creek G-Z IRSC Contract Area Map
Boise National Forest Mountain Home Ranger District
T. 4 N., R. 3 E., Sec 14-16, 21-27
DRAFT
£¤20
¬«44
¬«55
¬«21
§̈¦184
§̈¦84
Inset Legend Contract Area Boundary
Special Measures Area (SMA1)
Proposed Haul Route
Roadways
Highway
BOISE
Inch : Feet 1:8,000
P
P
P
P
P
P P
P
P
P
P
P
P
P
P
P
P
P
SMA1
297 366
File details come from the government source that posted it. Updated .