Attachment 5-jc-site-layout.pdf
PDF 469 KB Posted
- Attached to
- Jeffco Airtanker Base- Remediation Services
- Solicitation number
- 1240LP26Q0036
About this file
This is a site layout drawing for the Arapaho-Roosevelt National Forest, JEFFCO Airtanker Base, prepared by the U.S. Department of Agriculture Forest Service Rocky Mountain Region. The half-size drawing depicts the facility layout with specific areas marked for renovation work.
The document identifies two primary work scope areas within the Air Operations Building: carpet removal is required in the area outlined in red, and sheetrock removal and replacement is required along the walls outlined in orange. The drawing provides detailed measurements and dimensions for the affected spaces, including room configurations within the Air Operations Building and adjacent warehouse area. The layout also shows the Retardant Plant Containment Area and various structural elements of the facility. The drawing is dated May 22, 2002, and is identified as Sheet C-3 of 7, indicating it is part of a larger set of construction or renovation documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1-SOI_JeffcoATBWaterRemediation.xlsx | XLSX spreadsheet | |
| 1240LP26Q0036- Jeffco Remediation Services.pdf | ||
| Attachment 4- jc site.pdf | ||
| Attachment 2- SOW JeffcoATBWaterRemediaiton.pdf | ||
| Attachment 3- WD 2015-5419 rev 31 date 12-3-25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The red line outlines the area where carpet removal required.
The orange line shows the walls where sheetrock removal and replacement is requried.