Attachment 5 - HAZMAT Report - Muskogee Demo Bldgs 6-10.pdf

PDF 9 MB Posted

Attached to
Z2DZ--VA Eastern Oklahoma Health Care Medical Center Demolition of 5 Buildings and New Construction Needed Project#623-21-101
Solicitation number
36C25924R0112
Issued by

About this file

This document is a Hazardous Building Materials Inspection Report for the demolition of Buildings 6-10 at the Muskogee VA Medical Center in Muskogee, OK as part of VA Project No. 623-21-101.

The report provides details on the inspection and findings for asbestos-containing materials and lead-based paint within the buildings. It includes recommendations for the safe removal and disposal of these hazardous materials prior to demolition. The report also outlines the applicable regulatory requirements for asbestos abatement and lead-based paint management. This information is intended to support the federal contract opportunity associated with the demolition project, which includes removing the five buildings, capping utilities, and restoring the site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hazardous Building Materials Inspection Report

Demolish Buildings 6, 7, 8, 9, and 10 Muskogee VA Medical Center

Muskogee, OK

VA Project No: 623-21-101

Prepared for HFS Company by:

DESERT CONCEPTS E & E, INC and AMI Environmental Team 8000 IH 10 W, Suite 600 San Antonio, TX 78230

October 03, 2022

TABLE OF CONTENTS

1. SURVEY OVERVIEW

1.1. Purpose and Scope

1.1.1. Inspection Area

1.1.2. Limitations

1.2. Regulatory Reference

2. BUILDING INFORMATION

2.1. General Construction

2.2. Pre-Existing Information

3. INSPECTION METHODOLOGIES

3.1. Asbestos Inspection

3.1.1. Key Definitions

3.1.2. Homogenous Material Numbering Convention

3.1.3. Bulk Sampling

3.2. Lead-Based Paint Inspection

3.2.1. Key Definitions

3.2.2. Homogenous Paint Applications Numbering Convention

3.2.3. Paint Chip Sampling

4. SUMMARY OF INSPECTION FINDINGS

4.1. Asbestos Inspection Findings

4.2. Lead Paint Inspection Findings

5. RISKS AND HAZARDS

5.1. Asbestos

5.2. Lead-Based Paint

6. RECOMMENDATIONS

6.1. General Recommendations

6.1.1. Asbestos

6.1.2. Lead-Based Paint

6.2. Hazardous Conditions Recommendations

6.3. Point Count Analysis / TEM Chatfield Analysis Recommendations

7. REGULATORY REQUIREMENTS

7.1. Asbestos-Containing Materials

7.1.1. Notification Requirements

7.1.2. Asbestos Removal Requirements

7.1.3. OSHA Regulation of <1 Percent Asbestos

7.1.4. Asbestos Removal Regulations

7.2. Lead-Based Paint

7.2.1. Disposal Requirements

7.2.2. Construction Requirements

APPENDIX A: Tables

APPENDIX B: Photo Logs

APPENDIX C: Analytical Results

APPENDIX D: Schematics

APPENDIX E: Inspectors Credentials

HAZARDOUS MATERIALS INSPECTION REPORT

Demolish Buildings 6, 7, 8, 9, and 10

Veterans Affairs Medical Center 1011 Honor Heights Dr.

Muskogee, OK

1. SURVEY OVERVIEW

On September 13, 2022, Buildings 6, 7, 8, 9, and 10 at the Veterans Affairs Medical Center, 1011 Honor Heights Dr, Muskogee, OK, were inspected for asbestos-containing material (ACM) and lead-based paint (LBP) by representatives of Desert Concepts E&E and AMI Environmental (AMIE). The hazardous building materials inspection was conducted in preparation for the demolition of the buildings. The AMIE representatives were escorted to determine the impacted areas by Mike Engrav with the Muskogee

VAMC.

The renovation project is hereinafter referred to as The Project. The inspection was initiated at the request of Mr. Nick Andrews, PE, SE of HFS Company, on behalf of the VA Medical Center. The inspection and was performed by Mr. Jacob King of Marshall Environmental Management, in accordance with regulatory requirements and generally accepted industry methods. Copies of applicable requisite training certificates are provided in Appendix E.

1.1. Purpose and Scope

The purpose and scope of the inspection was to identify and sample suspect ACMs, LBPs or other lead containing building materials present in the project area that may be impacted by The Project.

1.1.1. Inspection Area

The hazardous building materials inspection of the project included all accessible interior and exterior areas of Buildings 6, 7, 8, 9, and 10 which will be demolished as part of the project. The above-described areas are hereinafter referred to collectively as the Inspection Area.

1.1.2. Limitations

Areas not accessible at the time of the survey include locked rooms in Building 10, locked IT rooms in the basement of Buildings 6, 7, 8, 9, and 10. The roof chimneys on the exterior of Buildings 6-10 were also not accessible at the time of the survey due to safety concerns.

It is recommended that any new materials discovered in the demolition process prior to or during construction be tested or abated.

Sampling of these materials may not be necessary if, in the case of suspect ACM, the materials are assumed to be ACM or if they are determined by a licensed asbestos inspector to be homogenous to other materials that were sampled. Materials assumed asbestos containing in the inspection area included caulking/sealant on the roof chimneys and fire doors throughout the inspection area.

Hazardous Building Materials Inspection Report AMI Project No. 22-226 Demolish Buildings 6, 7, 8, 9, and 10 October 03, 2022 Muskogee VA Medical Center Muskogee, OK Page of 9

1.2. Regulatory Reference

The asbestos inspection was conducted in accordance with USEPA National Emission Standard for Hazardous Air Pollutants (NESHAP) regulations (ref.: 40 CFR, Part 61), following criteria established for identifying asbestos-containing building materials that may be impacted by planned renovation activities; applicable protocols established by the Asbestos Hazard Emergency Response Act (AHERA) (ref.: 40 CFR 763). There is also no licensing requirement for lead paint sampling in non- HUD facilities.

The State of Oklahoma does have State licensing for asbestos inspectors.

2. BUILDING INFORMATION

2.1. General Construction

This project involves the demolition of Buildings 6, 7, 8, 9, and 10, listed above in scope of work, at the VA Medical Center in Muskogee, OK.

2.2. Pre-Existing Information

Limited information on previous surveys or sampling for asbestos was provided. An asbestos management plan dated January 29, 2020 indicated the presence of asbestos containing flooring materials in Buildings 6-10; however, the report was limited and did not specify the type or quantity of flooring materials.

3. INSPECTION METHODOLOGIES

3.1. Asbestos Inspection

The inspection and sampling were conducted in accordance with the USEPA National Emission Standard for Hazardous Air Pollutants (NESHAP) regulations (ref.: 40 CFR, Part 61), following criteria established for identifying asbestos-containing. building materials that may be impacted by planned demolition. Additional aspects of the inspection methodology are discussed below.

3.1.1. Key Definitions

3.1.1.1. Homogenous Material

Homogenous materials are unique applications of building materials uniform in color and texture. The homogeneity of a material can be further defined by area(s) of application. Bulk sampling is conducted to determine the asbestos content of a homogenous material.

3.1.1.2. Asbestos-Containing Material (ACM)

The Environmental Protection Agency (EPA) and the Occupational Safety and Health Administration (OSHA) define ACMs as any material that contains greater than one percent asbestos, as determined by visual area estimation (microscopic analysis). The State of Oklahoma follows the EPA standard. Some materials contain one percent or less asbestos. While these materials are not ACMs by definition, they are still regulated by OSHA, for worker exposure.

3.1.1.3. Friable/Non-Friable ACM

Friable ACMs are materials that contain more than one percent asbestos and, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure, thereby releasing fibers into the air more readily. In contrast, non-friable ACMs are ACMs that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Non-friable ACMs are grouped into two categories: Category I and Category

II.

3.1.1.4. Regulated Asbestos-Containing Materials (RACM)

Regulated Asbestos-Containing Materials (RACM) include friable ACMs and non-friable ACMs that, depending on their category, have become friable, have been subjected to specific forms of impact damage, have a high probability of becoming friable, and/or may become friable during removal.

3.1.2. Homogenous Material Numbering Convention

All suspect asbestos materials are assigned a unique homogeneous material number. AHERA identifies three basic material types: Surfacing Materials (SM), which include spray and trowel applied materials, such as fireproofing, ceiling texture, plaster, etc.; Thermal System Insulation (TSI), which includes insulating materials applied to mechanical and plumbing components for temperature preservation and condensation prevention purposes; and Miscellaneous Materials (MM), which includes all other materials, such as floor coverings and mastics, roofing materials, asbestos cement products, and many others. When a homogenous material has multiple layers, individual layers are identified and analyzed separately by laboratory analysis.

3.1.3. Bulk Sampling

Bulk sampling must be performed to determine whether suspect building material contains asbestos. Asbestos bulk sampling for the inspection was conducted in accordance with protocols established by the Asbestos Hazard Emergency Response Act (AHERA) (ref.: 40 CFR 763). Friability of the suspect asbestos-containing materials was determined by touching and/or sampling of the material.

3.1.3.1. Bulk Sample Numbering Convention

Bulk samples are given a sequence number when collected.

3.1.3.2. Polarized Light Microscopy Analysis (PLM)

Bulk samples collected during the inspection were submitted to an EPA accredited laboratory, EMSL Analytical, Inc. (EMSL), located at 6340 CastlePlace Dr.

Indianapolis, IN 46250. EMSL was instructed to perform Polarized Light Microscopy (PLM) analysis, utilizing dispersion staining techniques (ref: EPA Method 600/M4- 82-020). PLM analysis is the least expensive and most commonly used visual estimate method. While PLM analysis is acceptable to EPA, OSHA, and most states for determining asbestos content, some states now require more sophisticated methods when analyzing certain types of materials.

A total of 87 asbestos bulk samples were collected and submitted for laboratory analysis. PLM Analysis was performed on the samples collected, including all heterogeneous layers. Heterogeneous applications are individual layers of different materials contained within a single bulk sample, each of which must be analyzed individually to determine its asbestos content (e.g. vinyl floor tiles and mastic; cove base and mastic; etc.). Table 1 lists all samples collected and analyzed in the current survey.

Some samples and/or heterogeneous applications may not have been analyzed by the lab if a positive result was obtained from a sample that is among a group of samples representing a suspect material. This process, known as stop on first positive, is followed because if a single sample is found to be positive, that material is determined to be ACM, thus making it unnecessary to analyze any additional samples in the sampling group.

Please refer to the Table 1– Asbestos Material Sampling Table in Appendix A for a complete listing of all materials sampled. The laboratory analytical reports may be found in Appendix D for the current inspection.

3.1.3.3. Quantification Method Analysis

EPA regulations allow materials determined to contain less than 10 percent asbestos utilizing a visual estimate quantification method, such as PLM analysis, to be treated as non-asbestos containing if the material is re-analyzed using one of two quantification methods and determined to contain one percent or less of asbestos. The two acceptable quantification methods are point count analysis and TEM Chatfield analysis.

Quantification methods are more time-consuming and more expensive analytical procedures that are occasionally used to more accurately determine the amount of asbestos in certain samples. Because of their higher cost and the acceptable accuracy of the less expensive visual estimation method, laboratories do not typically perform quantification analyses unless specifically requested.

The quantification method known as point count analysis is used for most ACM types, except floor tile. The organic matrix composition of floor tile precludes the use of point count analysis to more accurately determine asbestos amounts within a sample.

Therefore, TEM Chatfield analysis—which effectively removes all organic materials, leaving only asbestos behind—is necessary to provide a more precise percentage of asbestos content in floor tile.

Please refer to section 6.0 Recommendations, for recommendations concerning supplemental analysis.

3.2. Lead-Based Paint Inspection

The LBP inspection included visual identification of homogenous paint applications sampling of the paint(s). While the U. S. Department of Housing and Urban Development (HUD) promulgates guidelines for LBP inspections in child occupied facilities, there are no formal guidelines for non-HUD regulated inspections. Thus, the LBP inspection was conducted in accordance with generally accepted industry standards and practices. Additional aspects of the inspection methodology are discussed below.

3.2.1. Key Definitions

3.2.1.1. Homogenous Paint Applications

Homogenous paint applications are significant paint applications that are visually distinct by their color and uniformity. Significant paint applications do not include incidental occurrences of paint such as isolated occurrences of accent trim, artistic paints, etc.

3.2.1.2. Lead-Based Paint (LBP)

Pursuant to Federal Register, Vol. 61, No. 169, LBP is defined as paint or other surface coatings equal to or greater than 0.5 percent lead by weight or equal to or greater than 1 mg/cm2.

3.2.2. Homogenous Paint Applications Numbering Convention

Homogenous paints and coatings are assigned a unique homogeneous material number (HM#).

The HM# is referenced throughout the report to uniquely identify each paint application.

3.2.3. Lead-based Paint Sampling

Sampling of suspected lead-based paint was conducted. Samples of Lead-based Paint were collected from homogeneous paint applications for laboratory analysis. A total of 20 lead-based paint samples were collected.

4. SUMMARY OF INSPECTION FINDINGS

Key findings of the hazardous building materials inspection are summarized below. Please refer to the Appendices for complete details of the inspection findings and supporting documentation.

4.1. Asbestos Inspection Findings

Below is a summary of the findings of the asbestos inspection:

• MM-08 Sheet Flooring, Beige (20% Chrysotile). Located in Buildings 8 and 10, 1st Floor.

Estimated quantity: 700 Square Feet.

• MM-28 Fire Doors, Various Colors (Assumed Asbestos Containing). Fire Doors were present in Buildings 6, 7, 8, 9, and 10. Estimated quantity: 10 Each.

• MM-29 Chimney Caulking, Black/ Gray/ White(Assumed Asbestos Containing. Located on the roofs of Buildings 6, 7, 8, 9, and 10. Estimated quantity: 50 Linear Feet.

Please refer to Table 1 – Asbestos Sampling Table in Appendix A for a complete listing of all asbestos sampling.

4.2. Lead Paint Inspection Findings

Below is a summary of the findings of the lead-based paint inspection:

• L-4, Plaster Ceiling Paint, White (9.8% Lead by Weight). Located in Building 10, above drop ceiling on the 1st floor. Estimated quantity: 2,300 Square Feet.

• L-8, Metal Window Plate (Top of Frame), White (25% Lead by Weight). Located on all windows in the inspection area. Estimated quantity: 380 Square Feet.

• L-14, Plaster Ceiling Paint, Gray (3.2% Lead by Weight). Located in Building 9, above drop ceiling on the 1st floor. Estimated quantity: 2,290 Square Feet.

• L-15, Door/ Door Frame Paint, White (2.5 % Lead by Weight). Located on Building 8.

Estimated quantity: 40 Square Feet.

• L-16, Plaster Ceiling Paint, Off-White (3.2% Lead by Weight). Located in Buildings 6, 7, 8, above drop ceiling on the 1st floor. Estimated quantity: 6,600 Square Feet.

Please refer to Table 2 – Lead Paint Sampling Table in Appendix A for a complete listing of all lead-based paint and material sampling.

NOTE: See Section 7.2.2 Lead in Construction. Paint containing lead (PCL) at levels not considered Lead-based paint was found in samples in Lead Paint Sampling Table.

5. RISKS AND HAZARDS

5.1. Asbestos

To be a significant health concern, asbestos fibers must be inhaled. When asbestos fibers are inhaled, they become lodged in the lung tissue or alveoli. Here they clog and scar the tissues, causing the walls of the alveoli to lose their elasticity and useful function in respiration. Asbestosis (scarring of the lung), lung cancer, and Mesothelioma (cancer of the lining of the chest or lining of the abdominal wall) are diseases associated with asbestos exposure. Risks and hazards increase with increased exposure. ACM condition, proximity to building occupants, building use, and other factors can influence the potential for asbestos fibers to become airborne, and therefore increase exposure risks.

5.2. Lead-Based Paint

Inhalation and ingestion are the major routes of lead exposure. Once in the body, lead is distributed via the bloodstream to red blood cells, soft-tissue and bone. The kidneys and gastrointestinal (GI) tract eliminate lead in the body very slowly, while minute amounts are lost through perspiration.

Lead in the body can cause serious damage to the central and peripheral nervous system, the cardiovascular system, and the kidneys. Exposure to high concentrations of lead can cause retardation, convulsions, coma, and sometimes death. Children are especially vulnerable and susceptible to lead poisoning. Even low levels of exposure persisting during childhood are known to slow a child’s normal development and cause learning and behavioral problems. Exposure to lead can result from deteriorating surfaces and activities mechanically impacting lead surfaces. Preventing exposure requires proper work practices, monitoring, disposal and personal protective equipment during demolition, alteration and friction producing activities.

6. RECOMMENDATIONS

The purpose of this section is to interpret survey findings and provide preliminary recommendations that may be relevant and appropriate at this time. Because this document is a presentation of investigative findings, recommendations related to future construction activities are inherently general in nature. More specific determinations concerning hazardous building materials to be impacted by construction should be made during the abatement project design process.

6.1. General Recommendations

6.1.1. Asbestos

State and/or federal regulations require that ACMs be removed prior to demolition or renovation activities that will impact the ACMs. Depending on the specific renovation work to be performed, certain ACMs may not require removal if they will not be disturbed and do not pose a risk to building occupants or construction trade workers. However, to ensure worker safety and to eliminate future asbestos-related maintenance and management costs and risks, AMIE recommends removal of all identified ACMs in the areas to be renovated. While partial abatement may be technically possible, it is often impractical and not cost-effective.

ACMs not impacted by renovation or demolition activities should be inspected annually and maintained in good condition. ACMs deemed to be in less than good condition (damaged or significantly damaged) should be repaired or removed and replaced. Such repairs should be performed by qualified persons and in accordance with regulatory guidelines.

6.1.2. Lead-Based Paint and Lead Containing Materials

Facility owners are ultimately liable for their lead-containing hazardous waste from cradle to grave. EPA regulations provide two ways to determine whether a waste stream, such as demolition debris containing LBP, must be classified as hazardous waste. Waste generators can either test the waste using an approved testing method (Toxicity Characteristic Leaching Procedure [TCLP]), or they can apply knowledge of the hazardous characteristic of the waste.

Any lead-based painted building components not removed during renovation should be considered for inclusion in a facility management plan that maintains potential exposure below

OSHA action levels and ensures the material will be handled properly and in accordance with applicable regulations.

6.2. Hazardous Conditions Recommendations

Hazardous conditions noted in the inspection area included the visual observation of mold in buildings 7, 8, 9, and 10. Miscellaneous hazardous materials including PCB light ballasts and fluorescent light tubes were noted in the basements of Buildings 6, 7, 8, 9, and 10. These items should be recycled or disposed of properly prior to construction.

6.3. Point Count Analysis / TEM Chatfield Analysis Recommendations AMIE does not recommend Point Count or TEM Chatfield analysis of any of the ACMs identified.

7. REGULATORY REQUIREMENTS

7.1. Asbestos-Containing Materials

The removal and disposal of ACMs is regulated at the federal, state, and, sometimes, local level. While some states have developed their own regulatory standards for the various asbestos disciplines, many states have adopted the federal standards but have established licensing requirements and enforcement authority at the state level.

7.1.1. Notification Requirements

EPA’s NESHAP regulation, 40 CFR, Subpart M, 61.145, Standard for Demolition and Renovation, stipulates that an owner of a facility submit proper notification with either the EPA’s regional office and/or the state and local regulatory agency of intention to demolish or renovate. Notifications must be received by the appropriate regulatory agencies 10 working days prior to commencement of asbestos stripping or removal, or other site work. If the demolition or renovation date changes, or the scope of work is increased, another notification is required.

7.1.2. Asbestos Removal Requirements

Asbestos removal must be performed by an abatement contractor following all work practices, worker protection, and disposal requirements set forth in the contract specifications and by the Occupational Safety and Health Administration (OSHA) and the EPA. Key federal regulations concerning asbestos include 29 CFR 1910.1001, 29 CFR 1926.1101, 40 CFR Part 61, Subpart M, and 40 CFR 763.

7.1.3. OSHA Regulation of ≤ 1 Percent Asbestos

While EPA and many states do not regulate materials containing one percent or less asbestos, OSHA regulates materials containing any amount of asbestos. (Ref. OSHA Construction Industry Standard, 29 CFR 1926.1101(a)(3))

7.1.4. Asbestos Removal Regulations

Asbestos Containing Building Material (ACBM) should only be removed by companies with trained workers, and following all applicable regulatory and industry standards.

7.2. Lead Waste

7.2.1. Disposal Requirements

The Resource Conservation and Recovery Act (RCRA) classifies lead-containing waste streams as hazardous materials if TCLP levels exceed five parts per million. If TCLP leachable lead levels exceed that threshold, EPA regulations (40 CFR 261) require the waste stream to be handled and disposed of as a hazardous waste. Waste streams containing less the five parts per million of leachable lead are classified as non-hazardous waste and can be disposed of in a construction and demolition landfill.

7.2.2. Lead in Construction Requirements

OSHA’s 29 CFR 1926.62 regulates worker exposure to lead during construction activities that include demolition or salvage of structures where lead or materials containing lead are present, as well as removal or encapsulation of lead-containing materials. The standard establishes maximum limits of exposure to lead, including a permissible exposure limit and action level, and should be adhered to during construction and demolition activities.

Desert Concepts E&E and AMI Environmental 8000 IH 10 West, Ste. 600

San Antonio, TX 78230 661-203-8172

APPENDIX A

Asbestos and Lead-Based Paint Tables

Table 1 – Asbestos Materials Sampling Table

Table 2 – Lead-Based Paint Sampling Table

Table I

Table 1: Asbestos-Containing Material Sampling Table & Test Results AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Material #/ Description Sample ID Layer ID Color Location Sample Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-01 Drywall 01 Drywall Brown/ White

Interior Walls in Buildings 6

- 10 None Detected 1

MM-01A Joint Compound 01 Compound White Interior Walls in Buildings 6

- 10 <1 % Chrysotile 1

MM-01 Drywall 02 Drywall Brown/ White

Interior Walls in Buildings 6

- 10 None Detected 1

MM-01A Joint Compound 02 Compound White Interior Walls in Buildings 6

- 10 <1 % Chrysotile 1

MM-01 Drywall 03 Drywall Brown/ White

Interior Walls in Buildings 6

- 10 None Detected 1

MM-01A Joint Compound 03 Compound White Interior Walls in Buildings 6

- 10 <1 % Chrysotile 1

MM-02 Flooring Mastic 04 Black Building 10, Under Carpet None Detected 2

MM-02 Flooring Mastic 05 Black Building 10, Under Carpet None Detected 2

SM-01: Plaster Ceiling 06 Plaster Gray Building 6-10 Ceilings, Above Drop Ceiling None Detected 3

SM-01A: Skim Coat 06 Skim Coat White Building 6-10 Ceilings, Above Drop Ceiling None Detected 3

MM-03: 2’x4’ Ceiling Tile 07 White/

Tan Building 10 None Detected 4

AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Material #/ Description Sample ID Layer ID Color Location Sample Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-04: Cove Base 08 Cove Base Tan Building 10 None Detected 5

MM-04A: Cove Base Adhesive 08 Adhesive Yellow Building 10 None Detected 5

MM-05: Window Caulk 09 Tan Building 10, Exterior None Detected 6

MM-06: Door Caulk 10 Gray Building 10, Exterior None Detected 7

MM-07: 12”x12” Vinyl Floor Tile (VFT) 11 VFT Tan Building 10, Corridor 100C-

10 None Detected 8

MM-07A: VFT Mastic 11 Mastic Yellow Building 10, Corridor 100C- 10 None Detected 8

MM-07: 12”x12” Vinyl Floor Tile (VFT) 12 VFT Tan Building 10, Corridor 100C-

10 None Detected 8

MM-07A: VFT Mastic 12 Mastic Yellow Building 10, Corridor 100C- 10 None Detected 8

MM-07: 12”x12” Vinyl Floor Tile (VFT) 13 VFT Tan Building 10, Corridor 100C-

10 None Detected 8

MM-07A: VFT Mastic 13 Mastic Yellow Building 10, Corridor 100C- 10 None Detected 8

MM-08: Sheet Flooring 14 Beige Building 10, Under VFT in Corridor 100C-10 20% Chrysotile Fair N 50 SF 9

AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Material #/ Description Sample ID Layer ID Color Location Sample Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-08: Sheet Flooring 15 Beige Building 10, Under VFT in Corridor 100C-10 Positive Stop Fair N Included

Above 9

MM-08: Sheet Flooring 16 Beige Building 10, Under VFT in Corridor 100C-10 Positive Stop Fair N Included

Above 9

MM-09: Attic Insulation 17 Brown Buildings 6, 7, 9 &10 None Detected 10

MM-10: Roof Shingle 18 Shingle Tan, Red, Black Buildings 6-10 None Detected 11

MM-10A: Roof Tar 18 Tar Black Buildings 6-10 None Detected 11

MM-11: Roof Shingle 19 Shingle White, Red, Black Buildings 6-10 None Detected 12

TSI -01: Duct Insulation Wrap 20 Wrap Brown, Silver Building 10 Basement None Detected 13

TSI -01A: Duct Insulation Wrap Mastic 20 Mastic White Building 10 Basement <1% Chrysotile 13

TSI -01: Duct Insulation Wrap 21 Wrap Brown, Silver Building 10 Basement None Detected 13

TSI -01A: Duct Insulation Wrap Mastic 21 Mastic White Building 10 Basement <1% Chrysotile 13

TSI -01: Duct Insulation Wrap 22 Wrap Brown, Silver Building 10 Basement None Detected 13

AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Material #/ Description Sample ID Layer ID Color Location Sample Result Condition Friable (Y/N)

Estimated Quantity Photo No.

TSI -01A: Duct Insulation Wrap Mastic 22 Mastic White Building 10 Basement <1% Chrysotile 13

MM-12: Brick Wall Mortar 23 Gray Buildings 6-10, Basement

Walls None Detected 14

MM-12: Brick Wall Mortar 24 Gray Buildings 6-10, Basement

Walls None Detected 14

MM-12: Brick Wall Mortar 25 Gray Buildings 6-10, Basement

Walls None Detected 14

TSI-02: Pipe Insulation/ Mudded Fitting 26 White Building 10 Basement None Detected 15

TSI-02: Pipe Insulation/ Mudded Fitting 27 White Building 10 Basement None Detected 15

TSI-02: Pipe Insulation/ Mudded Fitting 28 White Building 10 Basement None Detected 15

MM-13: Fire Stop Caulking 29 Red Buildings 6-10, Basement

Ceilings None Detected 16

MM-13: Fire Stop Caulking 30 Red Buildings 6-10, Basement

Ceilings None Detected 16

MM-13: Fire Stop Caulking 31 Red Buildings 6-10, Basement

Ceilings None Detected 16

MM-14: HVAC

Vibration Dampeners 32 Black Buildings 6-10, Basement

HVAC Room None Detected 17

AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Material #/ Description Sample ID Layer ID Color Location Sample Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-14: HVAC

Vibration Dampeners 33 Black Buildings 6-10, Basement

HVAC Room None Detected 17

MM-14: HVAC

Vibration Dampeners 34 Black Buildings 6-10, Basement

HVAC Room None Detected 17

MM-15: HVAC Adhesive 35 Black Building 9, Basement HVAC Room None Detected 18

MM-15: HVAC Adhesive 36 Black Building 9, Basement HVAC Room None Detected 18

MM-15: HVAC Adhesive 37 Black Building 9, Basement HVAC Room None Detected 18

TSI-03: Pipe Insulation/ Mudded Fitting 38 White Building 9, Basement None Detected 19

TSI-03: Pipe Insulation/ Mudded Fitting 39 White Building 9, Basement None Detected 19

TSI-03: Pipe Insulation/ Mudded Fitting 40 White Building 9, Basement None Detected 19

MM-16: 12”x 12” VFT 41 VFT White Building 9, Bathroom None Detected 20

MM-16A: Mastic Under VFT 41 Mastic Yellow Building 9, Bathroom None Detected 20

MM-16B: Floor Leveler Under VFT 41 Floor Leveler Gray Building 9, Bathroom None Detected 20

AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Material #/ Description Sample ID Layer ID Color Location Sample Result Condition Friable (Y/N)

Estimated Quantity Photo No.

SM-02: Sink Undercoating 42 Gray/

White Building 9 None Detected 21

SM-01: Plaster Ceiling 43 Plaster Gray Building 6-10 Ceilings, Above Drop Ceiling None Detected 22

SM-01A: Skim Coat 43 Skim Coat White Building 6-10 Ceilings, Above Drop Ceiling None Detected 22

SM-03: Wall Texture 44 White Building 9 Walls Throughout None Detected 23

SM-03: Wall Texture 45 White Building 9 Walls Throughout None Detected 23

SM-03: Wall Texture 46 White Building 9 Walls Throughout None Detected 23

MM-17: Wood Panel Adhesive 47 Tan Building 9, Under Wall

Wood Panels <1% Chrysotile 24

MM-17: Wood Panel Adhesive 48 Tan Building 9, Under Wall

Wood Panels <1% Chrysotile 24

MM-17: Wood Panel Adhesive 49 Tan Building 9, Under Wall

Wood Panels <1% Chrysotile 24

MM-18: 2’x4’ Ceiling Tile 50 White Building 9 None Detected 25

MM-19: Attic Insulation 51 Tan Building 9 None Detected 26

AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Material #/ Description Sample ID Layer ID Color Location Sample Result Condition Friable (Y/N)

Estimated Quantity Photo No.

SM-04: Plaster Walls 52 Plaster Gray Building 9, Interior Walls None Detected 27

SM-04A: Plaster Wall Skim Coat 52 Skim Coat White Building 9, Interior Walls None Detected 27

SM-04: Plaster Walls 53 Plaster Gray Building 9, Interior Walls None Detected 27

SM-04A: Plaster Wall Skim Coat 53 Skim Coat White Building 9, Interior Walls None Detected 27

MM-01: Drywall 54 Drywall White/ Brown Building 9, Bathroom Walls None Detected 28

MM-01A: Joint Compound on Drywall 54 Joint

Compound White Building 9, Bathroom Walls None Detected 28

MM-08: Sheet Flooring 55 Sheet Flooring Beige

Building 8, Rms: SP111, SP110-8, SP102, SP104

Entryway 20% Chrysotile Fair N 650 SF 29

MM-08A: Sheet Flooring Mastic 55 Mastic Brown

Building 8, Rms: SP111, SP110-8, SP102, SP104

Entryway <1% Chrysotile 29

MM-08: Sheet Flooring 56 Sheet Flooring Beige

Building 8, Rms: SP111, SP110-8, SP102, SP104

Entryway 20% Chrysotile Fair N Included

Above 29

MM-08A: Sheet Flooring Mastic 56 Mastic Brown

Building 8, Rms: SP111, SP110-8, SP102, SP104

Entryway <1% Chrysotile 29

MM-01: Drywall 57 Drywall White/ Brown Building 8, Interior Walls None Detected 30

AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Material #/ Description Sample ID Layer ID Color Location Sample Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-01A: Joint Compound on Drywall 57 Joint

Compound White Building 8, Interior Walls None Detected 30

MM-20: Attic Insulation 58 White Building 8, Attic None Detected 31

MM-20: Attic Insulation 59 White Building 8, Attic None Detected 31

MM-20: Attic Insulation 60 White Building 8, Attic None Detected 31

SM-01: Plaster Ceiling 61 Plaster Gray Building 6-10 Ceilings, Above Drop Ceiling None Detected 32

SM-01A: Skim Coat 61 Skim Coat White Building 6-10 Ceilings, Above Drop Ceiling None Detected 32

MM-21: 12”x12” VFT 62 VFT

White with

Multicolor Specks

Building 8 Bathroom None Detected 33

MM-21A: 12”x12” VFT Mastic 62 Mastic Yellow

Building 8 Bathroom None Detected 33

MM-21B: 12”x12” VFT Floor Leveler 62 Leveler Yellow

Building 8 Bathroom None Detected 33

MM-22: 2’x4’ Ceiling Tile 63 White Buildings 8, 7 & 6 None Detected 34

SM-02: Sink Undercoating 64 Gray/

White Building 8, East Room None Detected 35

AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Material #/ Description Sample ID Layer ID Color Location Sample Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-21: 12”x12” VFT 65 VFT

White with

Multicolor Specks

Building 7 Rm 111 & Building 6

Rms 102, 106, 103 None Detected 36

MM-21A: 12”x12” VFT Mastic 65 Mastic Yellow

Building 7 Rm 111 &

Building 6 Rms 102, 106, 103

None Detected 36

MM-23: 12”x12” VFT 66 VFT Brown Building 7 Rm 107 None Detected 37

MM-23A: 12”x12” VFT Mastic 66 Mastic Yellow Building 7 Rm 107 None Detected 37

MM-23: 12”x12” VFT 67 VFT Brown Building 7 Rm 107 None Detected 37

MM-23A: 12”x12” VFT Mastic 67 Mastic Yellow Building 7 Rm 107 None Detected 37

MM-23: 12”x12” VFT 68 VFT Brown Building 7 Rm 107 None Detected 37

MM-23A: 12”x12” VFT Mastic 68 Mastic Yellow Building 7 Rm 107 None Detected 37

MM-24: 4” Cove Base 69 Cove Base Brown Building 7 None Detected 38

MM-24A: 4” Cove Base Mastic 69 Mastic White Building 7 None Detected 38

MM-24: 4” Cove Base 70 Cove Base Brown Building 7 None Detected 38

AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Material #/ Description Sample ID Layer ID Color Location Sample Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-24A: 4” Cove Base Mastic 70 Mastic White Building 7 None Detected 38

MM-09: Attic Insulation 71 Brown Buildings 6, 7, 9 &10 None Detected 39

SM-01: Plaster Ceiling 72 Plaster Gray Building 6-10 Ceilings, Above Drop Ceiling None Detected 40

SM-01A: Skim Coat 72 Skim Coat White Building 6-10 Ceilings, Above Drop Ceiling None Detected 40

SM-01: Plaster Ceiling 73 Plaster Gray Building 6-10 Ceilings, Above Drop Ceiling None Detected 40

SM-01A: Skim Coat 73 Skim Coat White Building 6-10 Ceilings, Above Drop Ceiling None Detected 40

MM-01: Drywall 74 Drywall White/ Brown

Buildings 6 & 7, Interior Walls None Detected 41

MM-01A: Joint Compound on Drywall 74 Joint

Compound White Buildings 6 & 7, Interior Walls None Detected 41

MM-25: Overhead Door Caulk 75 Gray

Buildings 6-10, Overhead Garage Doors on East Side of Basement None Detected 42

MM-26: Window Caulk 76 Tan/ Gray Buildings 6, 7 & 8 None Detected 43

MM-26: Window Caulk 77 Tan/ Gray Buildings 6, 7 & 8 None Detected 43

AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Material #/ Description Sample ID Layer ID Color Location Sample Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-06: Door Caulk 78 Gray All Doors on Buildings 6-10 None Detected 44

MM-27: Window Caulk 79 Tan Building 9 None Detected 45

MM-27: Window Caulk 80 Tan Building 9 None Detected 45

MM-28: Window Caulk 81 Gray Building 10 None Detected 46

MM-25: Overhead Door Caulk 82 Gray

Buildings 6-10, Overhead Garage Doors on East Side of Basement None Detected 47

MM-29: Exterior Roof Shingles 83 Gray, Red, Black Buildings 7-10 None Detected 48

MM-29: Exterior Roof Shingles 84 Gray, Red, Black Buildings 7-10 None Detected 48

MM-30: Exterior Roof Shingles 85 White, Red, Black Building 6 None Detected 49

MM-30: Exterior Roof Shingles 86 White, Red, Black Building 6 None Detected 49

MM-30: Exterior Roof Shingles 87 White, Red, Black Building 6 None Detected 49

MM-28: Fire Doors Not Sampled Various Buildings 6-10, Interior

Doors

Assumed Asbestos

Containing (Not Analyzed)

Good N 10 EA 50

AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Material #/ Description Sample ID Layer ID Color Location Sample Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-29: Chimney Caulking

Not Sampled

Black/ Gray/ White

Buildings 6-10, Roofs Assumed

Asbestos (Not Analyzed)

Fair N 50 LF 51

Table 2

Table 2: Lead Based Paint Sampling Table & Test Results AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Sample Location Description Substrate Color Paint Condition

Lab Result (% by Weight)

Estimated Quantity Photo No.

L-1 Building 10, Interior Walls Drywall Paint Drywall Blue Good 0.012 % wt 1

L-2 Building 10, Interior Walls (Top 1ft of Walls) Drywall Paint Drywall Tan Good <0.0080 % wt 2

L-3 Building 10, Interior Door Frame Paint Metal Tan Good <0.0080 % wt 3

L-4 Building 10, Ceiling Above Drop Ceiling Ceiling Paint Plaster White Cracking 9.8 % wt 2,300 SF 4

CL-5 Building 10, Bathrooms Ceramic Tile Ceramic Brown Good 0.005 % wt 5

CL-6 Building 10, Bathrooms Ceramic Tile Ceramic Off-White Good 0.005 % wt 6

L-7 Buildings 6, 7, 9 &10 Exterior Door Frames Metal Brown Cracking 0.022 % wt 7

L-8 Buildings 6-10 Window Plate (Top of All Windows) Metal White Cracking/

Flaking 25 % wt 380 SF 8

L-9 Buildings 6-10, Basement

Interior Brick Wall Paint Brick Beige Cracking 0.33 % wt 9

L-10 Building 9, Basement Crawlspace Interior Wall Paint Brick Light Blue Cracking/

Flacking 0.022 % wt 10

L-11 Building 9, 1st Floor Interior Wall Paint Drywall Beige Good <0.0080 % wt 11

Table 2

Table 2: Lead Based Paint Sampling Table & Test Results AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10 October 03, 2022

Sample Location Description Substrate Color Paint Condition

Lab Result (% by Weight)

Estimated Quantity Photo No.

L-12 Building 9, 1st Floor Interior Wall Paint Drywall Blue Good <0.0080 % wt 12

L-13 Building 9, Door Frames

Interior Door Frame Paint Metal White Good <0.0080 % wt 13

L-14 Building 9, 1st Floor Ceiling Plaster Ceiling Paint Plaster Gray Cracking 3.2 % wt 2,290 SF 14

L-15 Building 8, Exterior Door/Door Frame Paint Metal White Cracking 2.5 % wt 40 SF

(2 Doors) 15

L-16 Buildings 6, 7, 8 (1st Floor Ceilings) Plaster Ceiling Paint Plaster Off-White Cracking 1.6 % wt 6,600 SF 16

L-17 Building 8, Basement Sprinkler Line Paint Metal Red Good 0.017 % wt 17

L-18 Building 7, 1st Floor Ceiling Wall Paper Paint Paper Tan Cracking 0.15 % wt 18

L-19 Buildings 6-10, Basement Exterior

Overhead Door Frame Paint Metal White Cracking 0.37 % wt 19

L-20 Buildings 6-10, Exterior (East Side) Siding Paint Wood Red Cracking 0.040 % wt 20

APPENDIX B

Photologs

Asbestos Sampling

Lead-based Paint Sampling

Asbestos-Containing Material Photo Log AMI Project No.: 22-226 Muskogee VAMC, Demolish Buildings 6-10

PHOTO 1

MM-01 Drywall & MM-01A Joint Compound PHOTO 2

MM-02 Flooring Mastic

PHOTO 3

SM-01: Plaster Ceiling & SM-01A: Skim Coat PHOTO 4

MM-03: 2’x4’ Ceiling Tile

PHOTO 5

MM-04: Cove Base & MM-04A: Cove Base Adhesive

PHOTO 6

MM-05: Window Caulk

PHOTO 7

MM-06: Door Caulk PHOTO 8

MM-07: 12”x12” Vinyl Floor Tile (VFT) & MM- 07A: VFT Mastic

PHOTO 9

MM-08: Sheet Flooring (Under VFT) PHOTO 10

MM-09: Attic Insulation

PHOTO 11 MM-10: Roof Shingle & MM-10A: Roof Tar PHOTO 12

MM-11: Roof Shingle

PHOTO 13

TSI -01: Duct Insulation Wrap & TSI -01A: Duct Insulation Wrap Mastic

PHOTO 14

MM-12: Brick Wall Mortar

PHOTO 15 TSI-02: Pipe Insulation/ Mudded Fitting PHOTO 16

MM-13: Fire Stop Caulking

PHOTO 17

MM-14: HVAC Vibration Dampeners PHOTO 18

MM-15: HVAC Adhesive

PHOTO 19 TSI-03: Pipe Insulation/ Mudded Fitting PHOTO 20

MM-16: 12”x 12” VFT & MM-16A: Mastic Under

VFT

PHOTO 21

SM-02: Sink Undercoating PHOTO 22

SM-01: Plaster Ceiling & SM-01A: Skim Coat

PHOTO 23 SM-03: Wall Texture PHOTO 24 MM-17: Wood Panel Adhesive

PHOTO 25

MM-18: 2’x4’ Ceiling Tile PHOTO 26

MM-19: Attic Insulation

PHOTO 27 SM-04: Plaster Walls & SM-04A: Plaster Wall Skim Coat

PHOTO 28

MM-01: Drywall & MM-01A: Joint Compound on Drywall

PHOTO 29

MM-08: Sheet Flooring & MM-08A: Sheet Flooring Mastic

PHOTO 30

MM-01: Drywall & MM-01A: Joint Compound on

PHOTO 31 MM-20: Attic Insulation PHOTO 32

PHOTO 33

MM-21: 12”x12” VFT & MM-21A: 12”x12” VFT

PHOTO 34

MM-22: 2’x4’ Ceiling Tile

PHOTO 35 SM-02: Sink Undercoating PHOTO 36

MM-21: 12”x12” VFT & MM-21A: 12”x12” VFT

PHOTO 37 MM-23: 12”x12” VFT & MM-23A: 12”x12” VFT

PHOTO 38

MM-24: 4” Cove Base & MM-24A: 4” Cove Base

PHOTO 39

MM-09: Attic Insulation PHOTO 40

PHOTO 41 MM-01: Drywall & MM-01A: Joint Compound on

PHOTO 42

MM-25: Overhead Door Caulk

PHOTO 43 MM-26: Window Caulk PHOTO 44

MM-06: Door Caulk

PHOTO 45

MM-27: Window Caulk PHOTO 46

MM-28: Window Caulk

PHOTO 47 MM-25: Overhead Door Caulk PHOTO 48

MM-29: Exterior Roof Shingles

PHOTO 49 MM-30: Exterior Roof Shingles PHOTO 50

MM-28: Fire Doors

PHOTO 51 MM-29: Chimney Caulking

Lead Based Paint Photo Log

PHOTO 1

L-1 Drywall Paint PHOTO 2

L-2 Drywall Paint (Top 1’)

PHOTO 3

L-3 Door Frame Paint PHOTO 4

L-4 Ceiling Paint, Building 10, Ceiling Above Drop Ceiling

PHOTO 5

CL-5 Ceramic Tile PHOTO 6

CL-6 Ceramic Tile

PHOTO 7

L-7 Exterior Door Frames PHOTO 8

L-8 Window Plate (Top of All Windows), Buildings 6-10

PHOTO 9

L-9 Interior Brick Wall Paint PHOTO 10

L-10 Interior Brick Wall Paint

PHOTO 11 L-11 Interior Wall Paint (Beige) PHOTO 12

L-12 Interior Wall Paint (Blue)

PHOTO 13

L-13 Interior Door Frame Paint PHOTO 14

L-14 Plaster Ceiling Paint, Building 9, 1st Floor Ceiling

PHOTO 15 L-15 Door/Door Frame Paint, Building 8, Exterior PHOTO 16

L-16 Plaster Ceiling Paint, Buildings 6, 7, 8 (1st Floor Ceilings)

PHOTO 17

L-17 Sprinkler Line Paint PHOTO 18

L-18 Wall Paper Paint (On Ceiling)

PHOTO 19 L-19 Overhead Door Frame Paint PHOTO 20

L-20 Siding Paint

APPENDIX C

Analytical Results

Asbestos Lab Report

Lead-Based Paint Lab Report

EMSL Analytical, Inc.

6340 CastlePlace Dr. Indianapolis, IN 46250

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162221424EMSL Order:

Customer ID: AMI50

Customer PO: 22-226

Project ID:

Attention: Phone:Colin Lauenroth (402) 397-5001

Fax:AMI Group, Inc. (402) 397-3313

Received Date:8802 South 135th Street 09/16/2022 10:03 AM

Analysis Date:Suite 100 09/16/2022 - 09/17/2022

Collected Date:Omaha, NE 68138-6511 09/13/2022

Project: 22-226 / Muskogee VA Demo Bldgs 6-10

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

01-Drywall

162221424-0001

None DetectedGypsum

Non-fibrous (Other)

60%

10%

Cellulose30%Brown/White

Fibrous

Heterogeneous

Bldg 10 - Drywall -

Wall System

(Brown/White)

01-Joint Compound

162221424-0001A

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldg 10 - Drywall -

Wall System

(Brown/White)

02-Drywall

162221424-0002

None DetectedGypsum

Non-fibrous (Other)

60%

10%

Cellulose30%Brown/White

Fibrous

Heterogeneous

Bldg 10 - Drywall -

Wall System

(Brown/White)

02-Joint Compound

162221424-0002A

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldg 10 - Drywall -

Wall System

(Brown/White)

03-Drywall

162221424-0003

None DetectedGypsum

Non-fibrous (Other)

50%

10%

Cellulose40%Brown/White

Fibrous

Heterogeneous

Bldg 10 - Drywall -

Wall System

(Brown/White)

03-Joint Compound

162221424-0003A

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldg 10 - Drywall -

Wall System

(Brown/White)

162221424-0004

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Under Carpet on

Conference Room

Bldg. 10 - Black

Flooring/Mastic

162221424-0005

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Under Carpet on

Conference Room

Bldg. 10 - Black

Flooring/Mastic

06-Plaster

162221424-0006

None DetectedPerlite

Non-fibrous (Other)

20%

80%

White

Non-Fibrous

Homogeneous

Bldg 10 Throughout

Ceiling - Plaster

Ceiling with Skim

Coat (White/Gray)

06-Skim Coat

162221424-0006A

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldg 10 Throughout

Ceiling - Plaster

Ceiling with Skim

Coat (White/Gray)

162221424-0007

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

50%

30%

Tan/White

Fibrous

Homogeneous

Bldg 10 Throughout -

2'x4' Ceiling, White

08-Cove Base

162221424-0008

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Bldg 10 Throughout -

Cove Base 4", Tan with Yellow Glue

08-Glue

162221424-0008A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Bldg 10 Throughout -

Cove Base 4", Tan with Yellow Glue

162221424-0009

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldg 10 Ext Doors -

Tan Window Caulk

162221424-0010

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Bldg 10 - Gray Door

Caulk

Initial report from: 09/17/2022 10:50:11

Page 1 of 8ASB_PLM_0008_0001 - 1.78 Printed: 9/17/2022 10:50 AM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162221424EMSL Order:

Customer ID: AMI50

Customer PO: 22-226

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

11-Vinyl Floor Tile

162221424-0011

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Bldg 10 Corridor

100C-10 - Tan

12"x12" VFT with

Yellow Mastic

11-Mastic

162221424-0011A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Bldg 10 Corridor

100C-10 - Tan

12"x12" VFT with

Yellow Mastic

12-Vinyl Floor Tile

162221424-0012

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Bldg 10 Corridor

100C-10 - Tan

12"x12" VFT with

Yellow Mastic

12-Mastic

162221424-0012A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Bldg 10 Corridor

100C-10 - Tan

12"x12" VFT with

Yellow Mastic

13-Vinyl Floor Tile

162221424-0013

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Bldg 10 Corridor

100C-10 - Tan

12"x12" VFT with

Yellow Mastic

13-Mastic

162221424-0013A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Bldg 10 Corridor

100C-10 - Tan

12"x12" VFT with

Yellow Mastic

162221424-0014

20% ChrysotileNon-fibrous (Other)80%Beige

Fibrous

Heterogeneous

Bldg 10 Corridor

100C-10, under 12x12

VFT - Sheet Flooring

(Beige)

162221424-0015

Positive Stop (Not Analyzed)Bldg 10 Corridor

100C-10, under 12x12

VFT - Sheet Flooring

(Beige)

162221424-0016

Positive Stop (Not Analyzed)Bldg 10 Corridor

100C-10, under 12x12

VFT - Sheet Flooring

(Beige)

162221424-0017

None DetectedNon-fibrous (Other)2%Cellulose98%Brown

Fibrous

Homogeneous

Bldg 10 Attic

Throughout All Bldgs -

Insulation, Beige

18-Shingle

162221424-0018

None DetectedNon-fibrous (Other)85%Glass15%Tan/Red/Black

Fibrous

Heterogeneous

Bldg 10 Roof

Throughout (All

Bldgs) - Shingle

Backer with Tar

(Black)

18-Tar

162221424-0018A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Bldg 10 Roof

Throughout (All

Bldgs) - Shingle

Backer with Tar

(Black)

162221424-0019

None DetectedNon-fibrous (Other)85%Glass15%White/Red/Black

Fibrous

Heterogeneous

Bldg 10 Roof (All

Bldgs) - Shingle

(Red/Black/Gray)

20-Wrap

162221424-0020

None DetectedNon-fibrous (Other)10%Cellulose

Glass

80%

10%

Brown/Silver

Fibrous

Homogeneous

Bldg 10 Basement -

Duct Wrap, Silver with

White Mastic

20-Mastic

162221424-0020A

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldg 10 Basement -

Duct Wrap, Silver with

White Mastic

Page 2 of 8ASB_PLM_0008_0001 - 1.78 Printed: 9/17/2022 10:50 AM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162221424EMSL Order:

Customer ID: AMI50

Customer PO: 22-226

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

21-Wrap

162221424-0021

None DetectedNon-fibrous (Other)10%Cellulose

Glass

80%

10%

Brown/Silver

Fibrous

Homogeneous

Bldg 10 Basement -

Duct Wrap, Silver with

White Mastic

21-Mastic

162221424-0021A

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldg 10 Basement -

Duct Wrap, Silver with

White Mastic

22-Wrap

162221424-0022

None DetectedNon-fibrous (Other)85%Cellulose

Glass

5%

10%

Silver

Fibrous

Homogeneous

Bldg 10 Basement -

Duct Wrap, Silver with

White Mastic

22-Mastic

162221424-0022A

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldg 10 Basement -

Duct Wrap, Silver with

White Mastic

162221424-0023

None DetectedQuartz

Non-fibrous (Other)

20%

80%

Gray

Non-Fibrous

Homogeneous

Bldg 10 Basement

(All Walls) - Brick

Mortar (Gray)

162221424-0024

None DetectedQuartz

Non-fibrous (Other)

20%

80%

Gray

Non-Fibrous

Homogeneous

Bldg 10 Basement

(All Walls) - Brick

Mortar (Gray)

162221424-0025

None DetectedQuartz

Non-fibrous (Other)

20%

80%

Gray

Non-Fibrous

Homogeneous

Bldg 10 Basement

(All Walls) - Brick

Mortar (Gray)

162221424-0026

None DetectedNon-fibrous (Other)70%Min. Wool30%White

Fibrous

Homogeneous

Bldg 10 Basement 1 in N. Storage Area 29 in Crawlspace -

Mudded Fitting, White

162221424-0027

None DetectedNon-fibrous (Other)70%Min. Wool30%White

Fibrous

Homogeneous

Bldg 10 Basement 1 in N. Storage Area 29 in Crawlspace -

Mudded Fitting, White

162221424-0028

None DetectedNon-fibrous (Other)70%Min. Wool30%White

Fibrous

Homogeneous

Bldg 10 Basement 1 in N. Storage Area 29 in Crawlspace -

Mudded Fitting, White

162221424-0029

None DetectedNon-fibrous (Other)100%Red

Non-Fibrous

Homogeneous

Bldg 10 /9 Ceiling

Drywall Seams - Red

Fire Stop Caulk

162221424-0030

None DetectedNon-fibrous (Other)100%Red

Non-Fibrous

Homogeneous

Bldg 10 /9 Ceiling

Drywall Seams - Red

Fire Stop Caulk

162221424-0031

None DetectedNon-fibrous (Other)100%Red

Non-Fibrous

Homogeneous

Bldg 10 /9 Ceiling

Drywall Seams - Red

Fire Stop Caulk

162221424-0032

None DetectedNon-fibrous (Other)80%Synthetic20%Black

Fibrous

Homogeneous

HVAC Unit in Bldg 10

- Vibration Damper

(Black)

162221424-0033

None DetectedNon-fibrous (Other)80%Synthetic20%Black

Fibrous

Homogeneous

HVAC Unit in Bldg 10

- Vibration Damper

(Black)

162221424-0034

None DetectedNon-fibrous (Other)80%Synthetic20%Black

Fibrous

Homogeneous

HVAC Unit in Bldg 10

- Vibration Damper

(Black)

162221424-0035

None DetectedNon-fibrous (Other)80%Cellulose20%Black

Non-Fibrous

Homogeneous

HVAC Unit in Bldg 9 -

Black Adhesive on

HVAC Unit

162221424-0036

None DetectedNon-fibrous (Other)80%Cellulose20%Black

Non-Fibrous

Homogeneous

HVAC Unit in Bldg 9 -

Black Adhesive on

HVAC Unit

Page 3 of 8ASB_PLM_0008_0001 - 1.78 Printed: 9/17/2022 10:50 AM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162221424EMSL Order:

Customer ID: AMI50

Customer PO: 22-226

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

162221424-0037

None DetectedNon-fibrous (Other)80%Cellulose20%Black

Non-Fibrous

Homogeneous

HVAC Unit…

This is the start of the file's text. The full file is on GovTribe.