This document is a painting specification for a federal contract opportunity to paint a modular building for the USDA Agricultural Research Service in Hilo, Hawaii. It requires preparing and painting exterior surfaces, including ferrous metal, zinc-coated metal, stucco, concrete masonry, concrete, and existing wood siding. Acceptable paint systems and materials are specified for each substrate, along with surface preparation requirements, application procedures, quality control testing, cleaning, and protection. The contractor must also provide extra paint in each color and type used for the project upon completion.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 5 Division 09 Finishes_Painting Schedules and Applications V2.pdf | ||
| Attachment 6 Modular Building Painting Questions and Answers version 2.pdf | ||
| SF30 Solicitation Amendment 0001.pdf | ||
| Modular Building Painting Questions and Answers.pdf | ||
| Attachment 2 Wage Determination HI20230001 07_28_2023.pdf | ||
| SF_18_12905B23Q0210_RFQ.pdf | ||
| Attachment 1 Statement of Work.pdf | ||
| Attachment 4 ARS_372_REQUEST FOR PAYMENT TRANSMITTAL.pdf | ||
| Attachment 3 ARS_371_CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Painting 09901 - 10
DIVISION 09 – FINISHES
SECTION 09901 - PAINTING
PART 1 - GENERAL
1.01 SUMMARY
A. This Section includes surface preparation and field painting of exposed exterior surfaces.
B. Paint exposed surfaces, except where these Specifications indicate that the surface or material is not to be painted or is to remain natural. If an item or a surface is not specifically mentioned, paint the item or surface the same as similar adjacent materials or surfaces. If a color of finish is not indicated, Contracting Officer will select from standard colors and finishes available. Paint surfaces including but not limited to the following:
1. Surfaces exposed during this work.
2. Surfaces damaged during this work.
3. Surfaces requiring touch-up painting.
C. Do not paint prefinished items, concealed surfaces, finished metal surfaces, operating parts, and labels.
1.02 REFERENCES
A. ASTM D 16 - Definition of terms relating to Paint, Varnish, Lacquer and Related Products.
B. ASTM D 2016 - Test Method for Moisture Content of Wood.
C MPI (Master Painter’s Institute) - Approved Product List.
D. PCDA (Painting and Decorating Contractors of America - Painting - Architectural
Specification Manual.
E. PCA (Portland Cement Association) - Painting Concrete.
F. SSPC (Steel Structures Painting Council - Steel Structures Painting Manual).
1.03 DEFINITIONS
A. General: Standard coating terms defined in ASTM D 16 apply to this Section.
1.04 SUBMITTALS
A. Submit in accordance with SECTION 01330 – SUBMITTAL PROCEDURES.
B. Product Data:
1. Materials List: Provide an inclusive list of required patching and coating materials. Indicate each material and cross-reference specific coating, finish
09901 - 20 system, and application. Identify each material by manufacturer’s catalog number and general classification.
a. For products with premixed colors, provide manufacturer’s standard color chips for selection by Contracting Officer.
b. The current MPI, "Approved Product List" which lists paint by brand, label, product name and product code as of the date of contract award, will be used to determine compliance with the submittal requirements of this specification. The Contractor may choose to use a subsequent MPI "Approved Product List", however, only one list may be used for the entire contract and each coating system is to be from a single manufacturer. All coats on a particular substrate must be from a single manufacturer. No variation from the MPI Approved Products List is acceptable.
2. Manufacturer’s Information: Provide data on all listed materials, including:
a. Thinning and mixing instructions.
b. Application instructions and required mil film thicknesses.
c. Manufacturer’s Material Safety Data Sheets.
C. Certifications: Provide a letter certifying paints and coatings are free of asbestos, lead, zinc-chromate, strontium chromate, cadmium, mercury, crystalline silica, and other EPA regulated and hazardous materials. Provide a letter certifying the amounts of mildewcide added by both the paint manufacturer and paint supplier.
D. Schedule of Finishes: Provide finish schedule including paint spread rates required to achieve final dry film thickness indicated in the schedule.
E. Schedule of Operations: Provide a work schedule showing sequence of operation and installation dates.
F. Samples:
1. Submit color and finish samples, at manufacturers normal paint chip size illustrating range of colors and textures available for each surface finishing product scheduled.
2. After color and finish sample are returned, submit paint finish samples, 8.5” x
11” in size illustrating selected colors and textures for each selection. Divide sample in horizontal strips showing prime and overlapping second and finish coats. Show coat tinting. Prepare transparent finish samples on same material as that on which coating will be applied. Identify each sample.
G. Manufacturer’s Instructions: Indicate special surface preparation procedures, and substrate conditions requiring special attention. Refer to Article 3.2
PREPARATION.
H. Qualification Data: For Applicator.
I. Delivery Receipts: Provide three (3) copies of the delivery receipt, signed by the user’s representative, attesting to delivery of extra paint as required under Article
3.7 EXTRA PAINT.
09901 - 30
J. Warranty: Submit warranty as noted under item entitled “WARRANTY” hereinbelow.
1.05 QUALITY ASSURANCE
A. Applicator Qualifications: A firm or individual experienced in applying paints and coatings similar in material, design, and extent to those indicated for this Project, whose work has resulted in applications with a record of successful in-service performance.
B. Source Limitations: Obtain block fillers and primers for each coating system from the same manufacturer as the finish coats.
1. Exception: Alkali resistant primers if compatible with the intermediate coat paint products.
1.06 REGULATORY REQUIREMENTS
A. Comply with State OSHL (Occupational Safety and Health Law) and pollution control regulations of the State Department of Health and EPA.
1.07 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to Project site in manufacturer’s original, unopened packages and containers bearing manufacturer's name and label and the following information:
1. Product name or title of material.
2. Product description (generic classification or binder type).
3. Manufacturer's brand name and lot number and date of manufacture.
4. Contents by volume, for pigment and vehicle constituents.
5. Thinning instructions.
6. Application instructions and coverage.
7. Color name and number.
8. VOC content.
B. Storage
1. Non-flammable Materials: Store materials not in use in tightly covered containers in a well-ventilated area. Maintain storage containers in a clean condition, free of foreign materials and residue.
2. Flammable Materials:
a. Store in such a manner as to prevent damage. No paint material, empty cans, paint brushes and rollers may be stored in the building(s). Store these items in separate storage facilities away from the building(s).
Contractor may furnish a separate job site storage structure, if the structure complies with the requirements of the local Fire Department.
Keep the storage area shall clean. Lock any storage structures when not in use or when no visual supervision is possible.
09901 - 40
b. All rejected materials shall be removed from the job site immediately.
1.08 PROJECT CONDITIONS
A. Do not apply materials when surfaces and ambient temperatures are outside the ranges required by the paint product manufacturer. Do not apply exterior coatings during rain or when relative humidity is outside the humidity ranges required by the paint product manufacturer.
B. Protect public, pedestrians and tenants from injury. Provided, erect and maintain safety barricades around scaffolds, hoists and where constriction operations create hazardous conditions.
C. Completed Work: Provide necessary protection for wet paint surfaces.
D. Protective Covering and Enclosures: Provide and install clean sanitary drop cloth or plastic sheets to protect furniture, equipment, floor and other areas that are not scheduled for treatment. Remove any paint applied to surfaces not scheduled for treatment.
E. Fire Safety: Contractor and its employees shall not smoke in the vicinity of the paint storage area. Exercise precautions against fire at all times and remove waste rags, plastic (polyester sheets), empty cans, etc. from the site at the end of each day.
F. Safeguarding Property: Safeguard the work and also the property of the
Government and other individuals in the vicinity of Contractor’s work. Make good on any damages and for losses to work or property caused by Contractor or its employee’s negligence. Where damaged property cannot be cleaned and restored to its original condition (i.e. prior to being damaged) replace it with a new product of equal quality. No prorating or use of “used” products will be permitted.
1.09 WARRANTY
A. Provide a two (2) year guarantee that the work performed under this section conforms to the contract requirements and is free of any defect of material or workmanship.
PART 2 - PRODUCTS
2.01 PAINT MATERIALS, GENERAL
A. Material Compatibility: Provide block fillers, primers, and finish-coat materials that are compatible with one another and with the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.
B. Mildewcide: Except for metal primers, provide primer and finish coats with suitable chemical mildewcide to the maximum amount of mildewcide per gallon of paint permitted by the mildewcide manufacturer without adversely affecting the quality of the paint, but not less than one ounce per gallon.
C. Material Quality: Provide manufacturer's best-quality paint material of the various coating types specified that are factory formulated and recommended by manufacturer for application indicated. Paint-material containers not displaying
09901 - 50 manufacturer’s product identification will not be acceptable.
1. Proprietary Names: Use of manufacturer’s proprietary product names in the
Paint Systems Schedule in Part 3 below to designate colors or materials, is not intended to imply that products named are required to be used to the exclusion of equivalent products of other manufacturers. Furnish manufacturer’s material data and certificates of performance for proposed products to be used.
2. Equivalent products to the specified products are listed in the Master
Painter’s Institute’s “Architectural Painting Specification Manual.”
3. Substitution: Requests for substitution of a product or product if a manufacturer is not on the “Approved Product List” will be evaluated for equivalency based on product test results per the test criteria of the Master Painter’s Institute.
D. Colors: Paint colors as indicated in the contract documents are for bid purposes only. Contractor shall coordinate with the Users and the Contracting Officer for final approval on color selection from the manufacturer’s full range.
E. EPA Regulated and Hazard Materials: Do not use paint or paint products containing asbestos, lead, mercury, zinc chromates, strontium-chromate, cadmium, crystalline silica, or the EPA regulated or hazardous materials. Select paint from the Master Painter’s Institute’s Approved Product List.
2.02 MISCELLANEOUS MATERIALS
A. Provide patching and repair materials. Compatible with paint finishes and substrates. Use weather resistant materials for exterior surfaces and surfaces exposed to moisture.
B. Accessories
1. General: Provide other materials not specifically indicated but required to achieve the finishes specified, of commercial quality.
2. Thinners: Thinning of paint shall be done using material recommended by the manufacturer. Mix proprietary products according to manufacturer's requirements. Do not use compound thinner, mineral oil, kerosene, refined linseed oil, or gasoline for thinning.
PART 3 - EXECUTION
3.01 EXAMINATION
A. Examine substrates, areas, and conditions, with Applicator present, for compliance with requirements for paint application. Comply with procedures specified in PDCA P4.
1. Proceed with paint application only after unsatisfactory conditions have been corrected and surfaces receiving paint are thoroughly dry.
2. Ensure that concrete and masonry surfaces are cured and dried to meet paint manufacturer's recommendations.
3. Start of painting will be construed as Applicator’s acceptance of surfaces and conditions within a particular area.
09901 - 60
B. Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers.
1. Notify Contracting Officer about anticipated problems when using the materials specified over substrates primed by others.
3.02 PREPARATION
A. General: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be painted. If removal is impractical or impossible because of size or weight of the item, provide surface-applied protection before surface preparation and painting.
After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved.
B. Cleaning: Before applying paint or other surface treatments, clean substrates of substances that could impair bond of the various coatings. Remove dust, oil and grease before cleaning.
1. Schedule cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces.
C. Surface Preparation: Clean and prepare surfaces to be painted according to manufacturer’s written instructions for each particular substrate condition and as specified. Provide barrier coats over incompatible primers or remove and re-prime.
D. Surface Preparation Cementitious Materials: Prepare concrete, concrete unit masonry, and mineral-fiber-reinforced cement panel surfaces to be painted.
Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents.
Roughen as required to remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation.
1. Use abrasive blast-cleaning methods if recommended by paint manufacturer.
2. Determine alkalinity and moisture content of surfaces by performing appropriate tests. Submit test results to Contracting Officer.
a. Prior to painting, concrete and masonry surfaces shall be allowed to cure and dry in accordance with the paint manufacturer's instructions and recommendations.
b. Prior to paint application, interior and exterior concrete and masonry
(including grout joints) scheduled to receive paint shall be tested to determine the alkalinity level of the surface. Testing shall be performed in strict accordance with the test kit manufacturer's instructions. Submit test results to the Contracting Officer.
c. Where the alkalinity level exceeds the pH level limit of the primer take one of the following three remedies at no additional cost to the Government:
1) Substitute a primer that is able to resist the measured alkalinity and that is compatible with the paint finish. Alkyd based primers and top-coats or epoxy ester primers shall not be used. Submit the substitute primer to the Contracting Officer for review.
09901 - 70
2) Neutralize the surface in accordance with the primer manufacturer’s instructions to reduce the alkaline level. However, acid washing is not permitted where the surface has been finished with a cementitious coating.
E. Surface Preparation Wood: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required. Sand surfaces exposed to view smooth and dust off. Scrape and clean small, dry, seasoned knots, and apply a thin coat of white shellac or other recommended knot sealer before applying primer. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Sand smooth when dried.
F. Surface Preparation Ferrous Metals: Clean ungalvanized ferrous-metal surfaces that have not been shop coated; remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning methods that comply with SSPC’s recommendations.
1. If mill scale or mild surface rust cannot be removed with solvent, then blast steel surfaces clean as recommended by paint system manufacturer and according to SSPC-SP 6/NACE No. 3 and SSPC-SP 10/NACE No. 2.
2. Treat bare and sandblasted or pickled clean metal with a metal treatment wash coat before priming.
3. Touch up bare areas and shop-applied prime coats that have been damaged.
Wire-brush, clean with solvents recommended by paint manufacturer, and touch up with same primer as the shop coat. Spot priming specified here shall be in addition to full prime painting scheduled in Part 3 below.
G. Surface Preparation Galvanized Surfaces: Clean galvanized surfaces with nonpetroleum-based solvents so surface is free of oil and surface contaminants.
Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods.
H. Material Preparation: Mix and prepare paint materials according to manufacturer’s written instructions.
1. Maintain containers used in mixing and applying paint in a clean condition, free of foreign materials and residue.
2. Stir material before application to produce a mixture of uniform density. Stir as required during application. Do not stir surface film into material. If necessary, remove surface film and strain material before using.
3. Use only thinners approved by paint manufacturer and only within recommended limits.
I. Tinting: Tint each undercoat a lighter shade to simplify identification of each coat when multiple coats of same material are applied. Tint undercoats to match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat.
09901 - 80
3.03 APPLICATION
A. General: Apply paint according to manufacturer’s written instructions. Use applicators and techniques best suited for substrate and type of material being applied.
1. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.
2. Provide finish coats that are compatible with primers used.
3. The term “exposed surfaces” includes areas visible when permanent or built-in fixtures, grilles, and similar components are in place. Extend coatings in these areas, as required, to maintain system integrity and provide desired protection.
4. Finish exterior doors on tops, bottoms, and side edges the same as exterior faces.
5. Sand lightly between each succeeding enamel or varnish coat.
6. Ensure primers are top coated within the times required by the paint manufacturers. Top coats not applied within the recoating window may be rejected.
B. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration.
1. The number of coats and film thickness required are the same regardless of application method. Do not apply succeeding coats until previous coat has cured as recommended by manufacturer. If sanding is required to produce a smooth, even surface according to manufacturer’s written instructions, sand between applications.
2. If undercoats, stains, or other conditions show through final coat of paint, apply additional coats until paint film is of uniform finish, color, and appearance. Give special attention to ensure that edges, corners, crevices, welds, and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces.
3. Allow sufficient time between successive coats to permit proper drying. Do not recoat surfaces until paint has dried to where it feels firm, and does not deform or feel sticky under moderate thumb pressure, and until application of another coat of paint does not cause undercoat to lift or lose adhesion.
C. Application Procedures: Apply paints and coatings by brush, roller.
1. Brushes: Use brushes best suited for type of material applied. Use brush of appropriate size for surface or item being painted.
2. Rollers: Use rollers of carpet, velvet-back, or high-pile sheep’s wool as recommended by manufacturer for material and texture required.
09901 - 90
D. Minimum Coating Thickness: Apply paint materials no thinner than manufacturer’s recommended spreading rate to achieve dry film thickness indicated. Provide total dry film thickness of the entire system as recommended by manufacturer.
E. Block Fillers: Apply block fillers to concrete masonry block at a rate to ensure complete coverage with pores filled.
F. Prime Coats: Before applying finish coats, apply a prime coat, as recommended by manufacturer, to material that is required to be painted or finished and that has not been prime coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to ensure a finish coat with no burn-through or other defects due to insufficient sealing.
G. Pigmented (Opaque) Finishes: Completely cover surfaces as necessary to provide a smooth, opaque surface of uniform finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections will not be acceptable.
H. Completed Work: Match approved samples for color, texture, and coverage.
Remove, refinish, or repaint work not complying with requirements.
3.04 FIELD QUALITY CONTROL TESTING
A. Inspection and Approvals: Obtain written approval upon completion of each phase of work (phases of work are: surface preparation and spot prime, prime, first finish coat, second finish coat) before proceeding into the next phase or work. For any particular area of work that deviates from the submitted work schedule, notify the Contracting Officer one day (24 hours minimum) in advance when completing any phase of work. Provide access to areas to be inspected.
1. Failure to obtain approval of any phase of work for a work area may result in redoing the operation at no cost to the Government.
2. Right of Rejection: Non conforming work will be rejected by the Contracting Officer. Remove rejected material from the job site immediately. Redo rejected work at no cost to the Government.
B. Manufacturer’s Field Services: The Painting Contractor shall be responsible to assure the presence of a qualified Technical Representative (approved by a responsible officer of the Material Manufacturer) at the job site prior to starting of the work and as require while the work is in progress. The Technical Representative shall provide assistance to the Painting Contractor in physical demonstrations on the use of the materials and methods or techniques required to accomplish all of the work as specified herein.
1. A minimum two (2) visits will be required. The Technical Representative shall submit a detailed report simultaneously to the Contracting Officer and a Responsible Officer of the Painting Contractor and not to the on-site project manager or foremen. This report shall contain in detail the findings, conclusions and recommendations and shall be submitted during each visit.
It is the intent of this provision to ensure that the on-site project manager or foreman does not have supervisory rights over the Technical Representative.
09901 - 10
3.05 CLEANING
A. Cleanup: At the end of each workday, remove empty cans, rags, rubbish, and other discarded paint materials from Project site. After completing painting, clean glass and paint-spattered surfaces. Remove spattered paint by washing and scraping without scratching or damaging adjacent finished surfaces.
3.06 PROTECTION
A. Protect work of other trades, whether being painted or not, against damage from painting. Correct damage by cleaning, repairing or replacing, and repainting, as approved by Contracting Officer.
B. Provide “Wet Paint” signs to protect newly painted finishes. After completing painting operations, remove temporary protective wrappings provided by others to protect their work. After work of other trades is complete, touch up and restore damaged or defaced painted surfaces. Comply with procedures specified in
PDCA P1.
3.07 EXTRA PAINT
A. The Contractor shall provide extra paint in each of the different colors of exterior and interior paint used for walls, eaves and trim to the facility upon completion of the project. The paint shall be in unopened one gallon cans and shall be in the quantities listed below:
1. Paint used over large areas, such as the exterior of the building - 5 gallons of each color and each type used (alkyd, latex, gloss, semi-gloss, flat, etc.).
2. Paint used in single room areas and in small areas, such as bathrooms and doors - 1 gallon of each color and each type used (alkyd, latex, gloss, semi-gloss, flat, etc.)
3.08 EXTERIOR PAINT SCHEDULE
A. Ferrous Metal: Provide the following finish systems over exterior ferrous metal previously coated with alkyd or latex.
1. Waterborne Light Industrial Coating: Two finish coats over a primer.
a. Primer: Exterior ferrous-metal primer. MPI 79.
b. Finish Coats: Exterior Waterborne Light Industrial Coating. MPI 163.
c. Finish Coat Gloss Level: Semi-gloss.
d. System DFT: 5 mils.
B. Ferrous Metal: Provide the following finish systems over exterior ferrous metal previously coated with alkyd or latex.
1. Waterborne Light Industrial Coating: Two finish coats over a primer.
a. Primer: Exterior ferrous-metal primer. MPI 79.
b. Finish Coats: Exterior Waterborne Light Industrial Coating. MPI 164.
c. Finish Coat Gloss Level: Gloss.
C. Zinc-Coated Metal: Provide the following finish systems over exterior zinc-coated metal surfaces:
1. Acrylic Finish: Two finish coats over a galvanized metal primer.
a. Primer: Exterior galvanized metal primer. MPI 101.
b. Finish Coats: Exterior acrylic paint. MPI 72.
c. Finish Coat Gloss Level: Semi-gloss.
09901 - 11
D. Stucco: Provide the following finish systems over exterior stucco surfaces:
1. Acrylic Finish: Two finish coats over a primer. On existing stucco, apply primer based on surface condition as recommended by manufacturer.
a. Primer: Exterior primer. MPI 10.
b. Finish Coats: Exterior acrylic paint. MPI 10.
c. Finish Coat Gloss Level: Flat.
d. System DFT: 4.5 mils.
E. Stucco: Provide the following finish systems over exterior stucco surfaces:
1. Acrylic Finish: Two finish coats over a primer. On existing stucco, apply primer based on surface condition as recommended by manufacturer.
a. Primer: Exterior primer. MPI 11.
b. Finish Coats: Exterior acrylic paint. MPI 11.
c. Finish Coat Gloss Level: Semigloss.
d. System DFT: 4.5 mils.
F. Existing Concrete Masonry: Provide the following finish systems over exterior concrete masonry surfaces:
1. Acrylic Finish: Two finish coats over a primer. On existing concrete masonry, apply primer based on surface condition as recommended by manufacturer.
a. Primer: Exterior primer. MPI 4.
b. Finish Coats: Exterior acrylic paint. MPI 11.
d. System DFT: 11 mils.
G. Existing Concrete: Provide the following finish systems over exterior concrete surfaces:
1. Acrylic Finish: Two finish coats over a primer. On existing concrete, apply primer based on surface condition as recommended by manufacturer.
a. Primer: Exterior primer. MPI 3.
b. Finish Coats: Exterior acrylic paint. MPI 11.
d. System DFT: 3.5 mils.
H. Existing Wood Siding: Provide the following finish systems over exterior wood siding surfaces previously coated with an alkyd/oil based finish:
1. Acrylic Finish: Two finish coats over a primer.
a. Primer: Exterior primer. MPI 5.
b. Finish Coats: Exterior acrylic paint. MPI 10.
09901 - 12
END OF SECTION
| PART 1 - GENERAL |
| 1.02 REFERENCES |
| 1.03 DEFINITIONS |
| 1.04 SUBMITTALS |
| 1.05 QUALITY ASSURANCE |
| 1.06 REGULATORY REQUIREMENTS |
| 1.07 DELIVERY, STORAGE, AND HANDLING |
| 1.08 PROJECT CONDITIONS |
| 1.09 WARRANTY |
| PART 2 - PRODUCTS |
| 2.02 MISCELLANEOUS MATERIALS |
| PART 3 - EXECUTION |
| 3.02 PREPARATION |
| 3.03 APPLICATION |
| 3.04 FIELD QUALITY CONTROL TESTING |
| 3.05 CLEANING |
| 3.06 PROTECTION |
| 3.07 EXTRA PAINT |
| 3.08 EXTERIOR PAINT SCHEDULE |