Attachment 6 Modular Building Painting Questions and Answers version 2.pdf

PDF 203 KB Posted

Attached to
Modular Building Painting USDA ARS HIlo, HI Federal contract opportunity
Solicitation number
12905B23Q0210
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Pacific West Area

About this file

This document contains questions and answers regarding a modular building painting project. The questions clarify that the aluminum railings, lace skirting and roof of one building need cleaning or painting with a non-reflective metal roof paint, while other components like the aluminum decking require a paint suitable for aluminum surfaces. The answers also indicate that paragraph 3.04 was inadvertently included in the solicitation package and can be ignored, and that the Contracting Officer's Representative will inspect and accept the completed work.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modular Building Pain�ng Ques�ons and Answers Version 2

1. The railing and ramps look like anodized aluminum. It will be difficult to paint and provide any warranty that the paint will s�ck. Can we wax and polish?

The aluminum railings do not need to be painted only cleaned. The decking needs to be painted with a non-reflec�ve paint that can be used on aluminum.

2. Roofing-do you want a metal paint or a Gaco type paint?

Metal roofing paint is fine

3. La�ce Skir�ng-Are we to paint that as well?

La�ce does not need to be painted.

4. Is it the government's intent to paint the roof(s) per the Scope Of Work Yes, one of the two buildings has a metal roof and that needs to be painted.

5. I would also like to verify the requirement in Division 09 Finishes for a Technical Representa�ve as follows:

“The technical representative will be the COR of the project or designated location representative. As far as removing the additional verbiage this was added by our Engineering branch for a previous painting project. Both para 3.04 can be removed from package.”

Paragraph 3.04 may be ignored, it was included inadvertently. The COR or designated loca�on monitor will inspect and accept work. The contractor is responsible for ensuring quality workmanship and adhering to manufacturer specifica�ons and recommenda�ons.