Attachment 5 Crane Constructability Matrix.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Booster Fabrication Facility (BFF) Crane Refurbishment, Phase 1 Solicitation
Solicitation number
80KSC023R0011
Issued by

About this file

This document contains details for a federal solicitation for crane refurbishment services at Kennedy Space Center. NASA is seeking proposals for Phase 1 of a two-phase design-build project to upgrade eleven cranes and monorails ranging from one-half to fifteen tons at the Booster Fabrication Facility. Offerors must be small businesses with 1,250 employees or fewer per the NAICS code 333923. The solicitation is set aside only for small businesses. Phase 2 details will be provided to offerors selected from Phase 1. Proposals are due electronically by the deadline specified in the solicitation. The selected contractor will design, install, test, and refurbish the cranes and monorails over the course of the two-phase project period at NASA's Kennedy Space Center in Florida.

View the file

Other files

File Type Posted
Attachment 3 Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment 4 Annual Reps and Certs.docx DOCX document
80KSC023R0011 BFF Cranes P1 Solicitation.pdf PDF
Attachment 2 80KSC023R0011 PPQ.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

80KSC023R0011

Attachment 5,

Booster Fabrication Facility Crane Constructability Matrix15-T High Bay East15-T High Bay West5-T Old Machine Shop1-T Aft Skirt Assembly M-1281-T Aft Skirt Assembly M-1271-T Aft Skirt Assembly M-126 (ADAPTS)1-T BSM Cell1-T Ordnance Room #11-T Ordnance Room #21/2-T Shaker Table1-T Aft Skirt Test Facility
15-T High Bay East
15-T High Bay West
5-T Old Machine Shop
1-T Aft Skirt Assembly M-128
1-T Aft Skirt Assembly M-127
1-T Aft Skirt Assembly M-126 (ADAPTS)
1-T BSM Cell
1-T Ordnance Room #1
1-T Ordnance Room #2
1/2-T Shaker Table
1-T Aft Skirt Test Facility

NOTE 1: The matrix above only applies on a per crane basis, i.e. the 15-T High Bay East Crane can be worked at the same time as the 1-T Aft Skirt Assembly M-128, but not at the same time as 15-T High Bay West.

The Red blocks indicate which cranes cannot be worked at the same time.

The Green blocks indicate which cranes which can be worked at the same time.

File details come from the government source that posted it. Updated .