Attachment 2 80KSC023R0011 PPQ.docx
DOCX document 27 KB Posted
- Solicitation number
- 80KSC023R0011
About this file
This document contains a past performance questionnaire for a federal contract solicitation and the related solicitation details. The solicitation is for Phase 1 of a two-phase design-build project to upgrade multiple cranes at the Booster Fabrication Facility at NASA's Kennedy Space Center in Florida. Offerors must provide the past performance questionnaire to previous customers to assess areas such as project management, technical performance, safety compliance, and overall contract performance. Completed questionnaires must be submitted by the proposal due date to NASA's contracting officer. The solicitation requires refurbishing and upgrading eleven cranes and monorails at the facility. It is set aside for small businesses with less than 1,250 employees. Offerors must be registered in SAM and certified through VETS-4212. Electronic proposals are due by the response date specified in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 Pre-Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| Attachment 4 Annual Reps and Certs.docx | DOCX document | |
| 80KSC023R0011 BFF Cranes P1 Solicitation.pdf | ||
| Attachment 5 Crane Constructability Matrix.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NASA/KSC SOLICITATION 80KSC023R0011
ATTACHMENT 2
PAST PERFORMANCE QUESTIONNAIRE
Upgrade Multiple Cranes at the Booster Fabrication Facility (BFF), Kennedy Space Center, Florida.
NASA Kennedy Space Center’s solicitation requires offerors to provide this Past Performance Questionnaire to customers to complete and return to NASA. Past performance raters are requested to submit the completed questionnaires to the contracting officer identified below via e-mail, to arrive not later than the proposal submission date.
Completed questionnaires should be sent to:
| Name: | C. M. Julius Williams | |
| Email: | Christopher.M.Williams@nasa.gov |
Raters are requested to complete the questionnaire forms as written since altered or substituted questionnaires may not adequately address the information NASA will be evaluating.
SECTION I. THIS SECTION TO BE COMPLETED BY THE OFFEROR
Name of Contractor Being Evaluated: _______________________________________
Name of Project and Contract/Order Number: ________________________________
Period of Contract Performance (dates): _____________________________________
Current Contract Completion Percentage if Project is not done:____________________
Place of Contract Performance: ____________________________________________
Contract Value at Award: _________________________________________________
Contract Value at Completion or Current Contract Amount: ______________________
Contract Status (Prime or Subcontract?): _____________________________________
Point of Contact: (Rater) Name/Address/Office Phone Number/E-Mail Address: ____________________________________________________________________________________________________________________________________________________________
THIS SECTION TO BE COMPLETED BY THE RATER
(THIS QUESTIONNAIRE, WHEN COMPLETED, SHALL NOT BE DISCLOSED TO ANYONE OUTSIDE THE GOVERNMENT)
Name of Contractor Being Evaluated: _____________________________________________
Name of Project and Contract/Order Number: ______________________________________
Period of Contract Performance (dates): __________________________________________
Place of Contract Performance: _________________________________________________
Contract Value at Award: ______________________________________________________
Contract Value at Completion or Current Contract Amount: ____________________________
Contractor’s Status (Prime or Subcontractor?): _____________________________________
Percentage and Dollar Value of Work Performed by the Contractor:
Dates of Rater’s Involvement in Program/Contract: _________________________________
Brief Description of Work Performed: ___________________________________________________________________________
Point of Contact: (Rater) Name/Address/Office Phone Number/E-Mail Address: ___________________________________________________________________________
RATING DEFINITIONS:
On a scale of 1 to 5, with 1 being unsatisfactory and 5 being exceptional, please rate the contractor on the past performance areas included in this questionnaire. A rating of N/A should be used if the question is not applicable or the answer is unknown. Space is provided for any additional comments raters may want to provide. The definitions associated with the 1 to 5 ratings are provided below:
1. UNSATISFACTORY: Performance does (did) not meet most contractual requirements and recovery is not likely (did not occur). The contractual performance contains (contained) serious problem(s) for which the contractor’s corrective actions appear ineffective (were ineffective).
2. MARGINAL: Performance does (did) not meet some contractual requirements. The contractual performance reflects (reflected) serious problem(s) for which the contractor has not yet identified acceptable corrective actions (did not provide acceptable corrective actions).
3. SATISFACTORY: Performance meets (met) contractual requirements. The contractual performance reflects (reflected) some minor problems. Corrective actions being taken by the contractor appear to be effective (Corrective actions taken were effective).
4. VERY GOOD: Performance meets (met) contractual requirements and exceeds (exceeded) some of the Government’s expectations. The contractual performance reflects (reflected) some minor problems and corrective actions being taken by the contractor appear to be effective (Corrective actions taken were effective).
5. EXCEPTIONAL: Performance meets (met) contractual requirements and exceeds (exceeded) many of the Government’s expectations. The contractual performance reflects (reflected) few minor problems and corrective actions taken by the contractor appear to be highly effective (corrective actions taken were effective).
N/A: Not applicable or rater has not observed performance in this area.
CONTRACTOR’S TECHNICAL PERFORMANCE QUESTIONS
1. The effectiveness of the Contractor’s overall project management ability (including but not limited to project managers, quality control managers, coordination of subcontractor trades, safety managers, and superintendents); labor (skilled and unskilled workers); equipment; supplies; tools; and financial resources to successfully perform, provide contract deliverables and complete work in a safe and timely manner.
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| NA |
Comments:
2. The Contractor’s ability to provide immediate and effective contractor management attention at the job site and partner with the owner to resolve technical and schedule issues.
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| NA |
Comments:
3. The Contractor’s ability to provide quality engineering shop drawings and accurate and complete as-built documentation.
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| NA |
Comments:
4. The Contractor’s ability to complete work scope within the approved schedule including any customer driven changes.
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| NA |
Comments:
5. The Contractor’s ability to upgrade or rehabilitate overhead bridge cranes.
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| NA |
Comments:
6. The Contractor’s ability to provide a complete design and design changes were held to a minimum.
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| NA |
Comments:
7. The Contractor’s ability to create, maintain, and comply with a safety and health program with visible management control and involvement during the duration of the contract.
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| NA |
Comments:
8. Did the Contractor comply with Department of Labor requirements and resolution of reported labor violations/discrepancies.
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| NA |
Comments:
9. Did the Contractor provide prompt payment of employees, subcontractors, and suppliers for services performed under the contract.
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| NA |
Comments:
CONTRACTOR’S OVERALL CONTRACT PERFORMANCE
1. Would you select this contractor again? (Please circle Yes or No)
| Yes |
| No |
Comments:
THIS COMPLETED QUESTIONNAIRE WILL NOT BE DISCLOSED TO ANYONE OUTSIDE THE GOVERNMENT. THANK YOU FOR TAKING THE TIME TO COMPLETE THIS QUESTIONNAIRE.
File details come from the government source that posted it. Updated .